Signalling and Train Control System Requirements

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

According to the provided content, what is the minimum safety level requirement for the Primary Train Detection system realized with software, ATP system, and Interlocking?

  • SIL2
  • SIL4 (correct)
  • SIL1
  • SIL3

Which of these aspects are explicitly addressed in the document's section dedicated to Cyber Security?

  • Implementation of a robust Intrusion Detection System (IDS)
  • Establishing a comprehensive vulnerability assessment program
  • Specifying the specific encryption algorithms to be used
  • Ensuring data integrity during wireless data transmission (correct)

What is the maximum permissible probability of Wrong Side Failure for the complete Signalling and Train Control System per Train operating hour?

  • 10-8
  • 10-10
  • 10-7
  • 10-9 (correct)

What is the minimum calibration/inspection interval for the Signalling and Train Control System to achieve the specified safety performance requirements?

<p>1 year (D)</p> Signup and view all the answers

What safety standard is referenced in the document for demonstrating the safety level of the Signalling and Train Control System?

<p>IEC 61508 (A)</p> Signup and view all the answers

What is stated to be the safety level for the Secondary Train Detection system realized through the Multi-Section Digital Axle counter?

<p>SIL4 (B)</p> Signup and view all the answers

What is implied by the statement "The Signalling and Train Control System shall not lead to an unsafe condition when the plug-in module / card / equipment is taken out"?

<p>All of the above (D)</p> Signup and view all the answers

Which of these is NOT explicitly mentioned as part of the information security framework and plan for the S&TC system?

<p>Intrusion Detection System (IDS) (C)</p> Signup and view all the answers

Who is responsible for demonstrating the safety of the Signalling and Train Control System?

<p>The Contractor (C)</p> Signup and view all the answers

What is the primary purpose of the GS (General Specification) document referenced in the document?

<p>To define the process for demonstrating the safety of the S&amp;TC system (C)</p> Signup and view all the answers

Which of the following statements about the Bhopal and Indore Metro line project is NOT true?

<p>The project requires the Contractor to build two separate Operation Control Centers (OCC) for Bhopal and Indore. (D)</p> Signup and view all the answers

According to the document, what is the primary purpose of the Design Specifications?

<p>To define the functional requirements and brief performance requirements of the Signalling and Train Control System. (A)</p> Signup and view all the answers

What is the significance of the document's reference to APPENDIX A13 - Indigenisation - MoHUA Letter No. K-14011/1/2018-UT II Dt 27-7-2018 or latest?

<p>It encourages the S&amp;TC contractor to prioritize the procurement of locally sourced materials and components. (A)</p> Signup and view all the answers

Which of the following aspects of the project are NOT addressed in the document?

<p>The utilization of a particular software for the Signalling and Train Control System. (D)</p> Signup and view all the answers

What can be inferred from the text regarding the final stage of operation for the Bhopal and Indore Metro Systems?

<p>The metro systems will be fully automated and operate without the need for human intervention. (B)</p> Signup and view all the answers

Based on the information provided, what is the intended relationship between this document and "Vol III and its Appendices"?

<p>Vol III serves as a supplementary document that provides detailed technical specifications for the Signalling and Train Control System. (C)</p> Signup and view all the answers

What is the significance of the document's reference to "headway of 90 seconds"?

<p>It defines the maximum time interval between two successive trains operating on the same line. (C)</p> Signup and view all the answers

Which standards must the wayside ATP equipment conform to for EMI requirements?

<p>EN 50081-2 (A), EN 61000-6-4 (B)</p> Signup and view all the answers

What is required from the Contractor regarding the EMC control plan?

<p>It must be submitted for review by the Engineer. (A)</p> Signup and view all the answers

For which of the following equipment must the onboard ATP conform to CENELEC standards?

<p>Onboard ATP equipment only (A)</p> Signup and view all the answers

Which aspect must the EMC control plan specifically analyze?

<p>EMI/EMC impacts on the design of the system (D)</p> Signup and view all the answers

What type of emissions should the EMC control plan aim to reduce?

<p>Conducted, induced, and radiated emissions (C)</p> Signup and view all the answers

What is required from the Contractor in terms of contract compliance?

<p>Use a formal requirements management tool (A)</p> Signup and view all the answers

Which version of IBM Rational DOORS must the tools be compatible with for monthly submissions?

<p>Version 9.3 or latest (B)</p> Signup and view all the answers

What type of areas are designated as non-ATP areas for the provision of signalling equipment?

<p>Depot areas (D)</p> Signup and view all the answers

Which of the following is NOT included in the services the Contractor must perform?

<p>Installation of dual-track systems (A)</p> Signup and view all the answers

What must the Contractor provide to the Reliability, Availability, Maintainability Assessor?

<p>All required information documents (C)</p> Signup and view all the answers

What is the goal of interface management as specified in the technical specification?

<p>To achieve efficient and safe UTO (GOA4) Train Operation (C)</p> Signup and view all the answers

Which of the following is a function that the Contractor must demonstrate?

<p>System assurance (A)</p> Signup and view all the answers

What kind of support is included in the services provided by the Contractor for the Specification?

<p>Presentations, reviews, and audit support (D)</p> Signup and view all the answers

What should be proposed if tools are not compatible with IBM Rational DOORS?

<p>Provide an alternative export mechanism (B)</p> Signup and view all the answers

What is the maximum allowable response time for equipment, excluding point machines?

<p>500 ms (D)</p> Signup and view all the answers

What is the time limit for the OCC to command the application of the brakes via ATC?

<p>2 seconds (A)</p> Signup and view all the answers

What is the maximum initialization time for a subsystem in the signaling system?

<p>40 seconds (C)</p> Signup and view all the answers

What is the average travel speed to be considered for Design Headway in the Metro rail project?

<p>28 Kmph (B)</p> Signup and view all the answers

Which IEEE standard outlines the parameters for equipment response times?

<p>IEEE 1474 (B)</p> Signup and view all the answers

What must the contractor disclose regarding significant variances from response time parameters?

<p>Their innocuousness on overall performance requirements (C)</p> Signup and view all the answers

Which components are included in the response time measurement for OCC, DCC, BCC, and others?

<p>Display time and command processing time (B)</p> Signup and view all the answers

Which of the following is not specified as a direct component of the signaling design?

<p>Train type selection (D)</p> Signup and view all the answers

What is the primary concern regarding the response time of the Signalling and Train Control System?

<p>Demonstration of compliance as defined in Chapter 6 (C)</p> Signup and view all the answers

How long should the station dwell time be during average travel assessments?

<p>30 seconds (A)</p> Signup and view all the answers

Flashcards

Scope of Work - S&TC System

The Signalling and Train Control System (S&TC) covers the entire Bhopal and Indore Metro line project, encompassing design, manufacturing, verification, supply, installation, testing, integration, and commissioning. The contractor is also responsible for providing maintenance for a specified duration.

General Requirements

The document outlines the general requirements for the Bhopal and Indore Metro lines, with the provisions applying equally to both systems.

Functional and Technical Requirements

This document details the functional and technical requirements of the Signalling and Train Control System, requiring consultation with other related documents.

Design/Build Contractor Responsibilities

The Design/Build Contractor is responsible for completing various stages of design, including preliminary, detailed, and final designs. They also oversee the supply, installation, testing, and commissioning of the Signalling and Train Control System.

Signup and view all the flashcards

Control Centers and Facilities

The system includes a centralized Operation Control Centre (OCC), a Playback and Training Room (PTR), a Depot Control Centre (DCC), and a Back-up Control Centre (BCC) for each city. These centers manage the system's operations and provide redundancy.

Signup and view all the flashcards

Headway and Operation Mode

All lines are designed for a 90-second headway and will be operated in Unattended Train Operation (UTO) Mode at the final stage, enabling automated train control.

Signup and view all the flashcards

Indigenization of Procurement

The S&TC contractor should prioritize procuring as many items as possible from Indian sources. Refer to APPENDIX A13 for more details on indigenization.

Signup and view all the flashcards

Requirements Management & Traceability Tool

A software tool used to track and manage requirements throughout the project lifecycle, ensuring traceability between requirements and design documents.

Signup and view all the flashcards

IBM Rational DOORS

A specific version of a software program used for requirements management, popular in the industry.

Signup and view all the flashcards

Pre-final System Design

The phase of the project where detailed design plans are finalized before implementation begins.

Signup and view all the flashcards

System Assurance

The process of ensuring a system meets safety and reliability standards. This can involve simulations, testing, and documentation.

Signup and view all the flashcards

Reliability, Availability, Maintainability (RAM) Assessors

Professionals responsible for assessing the reliability, availability, and maintainability (RAM) of a system.

Signup and view all the flashcards

Independent Safety Assessors (ISA)

Professionals responsible for evaluating the safety of a system, making sure it minimizes risks and meets regulatory requirements.

Signup and view all the flashcards

UTO (GOA4) Train Operation

A level of automation in train control systems, where the train operates automatically but the driver still has control.

Signup and view all the flashcards

Interface Management

The management of interfaces between different systems or components, ensuring seamless communication and operation.

Signup and view all the flashcards

Non-ATP Areas

Areas within a depot where ATP (Automatic Train Protection) systems are not used for train control.

Signup and view all the flashcards

EMC Requirements for ATP Equipment

The system's ability to withstand electromagnetic interference (EMI) and meet specific electromagnetic compatibility (EMC) standards.

Signup and view all the flashcards

EMC Control Plan

A formal document outlining measures to control electromagnetic interference (EMI) and ensure electromagnetic compatibility (EMC) within the Signalling and Train Control System.

Signup and view all the flashcards

Emissions Reduction in EMC Control Plan

The plan must include strategies to reduce emissions (conducted, induced, radiated) to acceptable levels as defined by international standards.

Signup and view all the flashcards

System Immunity in EMC Control Plan

The EMC control plan should also address increasing the immunity of the Signalling and Train Control System against external interference, making it less susceptible to disruption.

Signup and view all the flashcards

EMI/EMC Impact Analysis

The EMC control plan should analyze the potential impacts of both EMI and EMC on various system elements, including train-borne equipment, communication channels, trackside components, and the overall environment.

Signup and view all the flashcards

Safe Removal of Components

The Signalling and Train Control System (S&TC) must not become unsafe when a component, such as a plug-in module or card, is removed.

Signup and view all the flashcards

Wrong Side Failure Probability

The probability of a failure that could lead to a dangerous situation (wrong side failure) in the entire S&TC system is extremely low, less than 1 in a billion per train operating hour.

Signup and view all the flashcards

Safety Inspection Interval

Testing and inspections for the S&TC system are performed at least once a year to maintain its safety performance.

Signup and view all the flashcards

Safety Demonstration

The S&TC system's safety is rigorously tested and demonstrated by the contractor using a specific safety assessment process.

Signup and view all the flashcards

Safety Assessment of Functions

Each function of the S&TC system is assessed for safety, and the contractor must fulfill a safety process defined in the General Specification (GS).

Signup and view all the flashcards

Safety Level for Train Detection Systems

The primary train detection system (using software, ATP and Interlocking) and secondary train detection system (using Multi-Section Digital Axle counter) must meet the highest safety level (SIL4) in the international standard IEC 61508.

Signup and view all the flashcards

Cyber Security Framework

The contractor must develop a comprehensive security framework, plan and software development lifecycle (SDLC) that integrates risk management to protect data transmitted over Industrial Scientific and Medical (ISM) bands, ensuring confidentiality, availability and integrity of S&TC and wireless data.

Signup and view all the flashcards

Data Security over ISM Bands

Data transmitted over ISM bands, used by the S&TC system, is protected against malicious and unintentional manipulation.

Signup and view all the flashcards

Data Confidentiality, Availability, and Integrity

Maintaining confidentiality, availability and integrity of data transmitted over ISM bands is essential to ensure secure and reliable operation of the S&TC system.

Signup and view all the flashcards

Cybersecurity in Software Development

The S&TC contractor is responsible for incorporating cybersecurity measures throughout the software development lifecycle (SDLC) to mitigate risks and protect the system.

Signup and view all the flashcards

Average Travel Speed

The average speed a train is expected to travel on the track, determining the time between trains.

Signup and view all the flashcards

Station Dwell Time

The time a train spends stopped at a station, allowing passengers to board and disembark.

Signup and view all the flashcards

Equipment Response Time

The maximum time allowed for a piece of equipment to respond to a command or input. This ensures the system reacts quickly and efficiently.

Signup and view all the flashcards

Operation Control Centre (OCC)

The central system that controls and monitors the entire train system, including all operational elements.

Signup and view all the flashcards

Command Execution Delay

The time between the initiation of a command at the OCC and the actual application of the brakes by the train-borne system.

Signup and view all the flashcards

Sub-system Initialization

The process of starting up and preparing a train system component for operation.

Signup and view all the flashcards

Train-Borne Automatic Train Control (ATC)

A safety-critical system aboard trains, receiving instructions from the OCC and controlling train movement.

Signup and view all the flashcards

Stopping Position

The designated area where a train must come to a complete stop at the station.

Signup and view all the flashcards

Headway

The time between the arrival and departure of two consecutive trains on a track.

Signup and view all the flashcards

Unattended Train Operation (UTO)

A mode of train operation where trains are controlled automatically, without human intervention.

Signup and view all the flashcards

Study Notes

Signalling and Train Control System Requirements

  • Scope: The project involves designing, manufacturing, verifying, supplying, installing, testing, integrating, and commissioning the signalling and train control system for the Bhopal and Indore metro lines. Maintenance is also included for a specified period. Requirements apply equally to both cities.
  • Documents: This document details functional and technical requirements, and must be read in conjunction with Volume III and its appendices.
  • Contractor's Role: The contractor is responsible for preliminary, detailed, and final design, supply, installation, testing, and commissioning of the system.
  • Control Centers: One centralized Operation Control Centre (OCC), Playback and Training Room (PTR), Depot Control Centre (DCC), and Backup Control Centre (BCC) will be established for each city. Headway is set at 90 seconds, and operations will eventually transition to unattended train operation.
  • Indigenization: The contractor is encouraged to procure maximum possible components domestically. Detailed specifications are outlined in Appendix A13 (Indigenization - MoHUA Letter No.K-14011/1/2018-UT II Dt 27-7-2018 or latest). Furniture for various control centers is also a contracted aspect.
  • Requirements Management: Formal requirements management and traceability using a tool compatible with IBM Rational DOORS version 9.3 or higher is mandated. Electronic copies of the database are mandatory until project completion. Alternative export mechanisms are required for incompatible tools.
  • Non-ATP Depot Areas: Signalling equipment must be provided for designated non-Automatic Train Protection (ATP) depot areas.
  • Contractor Services: Contractor work includes, but is not limited to design, manufacturing, supply, system assurance, installation, testing, and commissioning of the signalling and train control system. This also includes presentations, reviews, audit support, and providing information to reliability, availability, maintainability (RAM) and Independent Safety Assessor (ISA).

System Safety

  • Safety Requirements: The system must not create unsafe conditions when equipment is removed.
  • Wrong Side Failure Probability: The probability of wrong-side equipment failures is less than 10-9 per train operating hour for the entire signalling and train control system.
  • Safety Performance Calibration: Safety performance requirements must be achievable with a calibration/inspection interval of at least one year.
  • Safety Demonstration: The contractor must demonstrate safety compliance according to the general specifications (GS) process defined. Each function's safety level, as defined in Chapter 6, must be demonstrated in accordance with GS.
  • Safety Level Definitions: Primary Train Detection (software-based ATP and interlocking) and Secondary Train Detection (multi-section digital axle counter) systems must meet SIL4 safety levels in accordance with IEC 61508 or equivalent standards.

Cyber Security

  • Information Security: The contractor must establish an information security framework, security plan, and a thorough System Development Life Cycle (SDLC) process, integrating risk management. Protecting against malicious or accidental data manipulation in ISM bands to maintain confidentiality, availability, and integrity is paramount.

System Performance

  • Design Headway: Design headway is based on an average speed of 28 km/h or higher, with a 30-second station dwell time.
  • Equipment Response Time: Equipment response times (excluding point machines) must be a maximum of 500ms, as specified by IEEE 1474. This calculation should include processing, display, and overhead time. Stopping position for each travel direction is specified in Volume IV.
  • Command Response Times: The time from the OCC initiating a command to the train applying brakes must be less than 2 seconds for ATS workstations. Sub-system initialization time (trackside ATC, train-borne ATC, interlocking, transmission, detection) must be a maximum of 40 seconds.
  • Variance from Standards: Any significant variance from IEEE 1474.1 Annex C parameters relating to speed, distance, and response times should be outlined and justified.
  • Performance Demonstration: The contractor must demonstrate the system's response time as outlined in Chapter 6.

Station Stopping

  • Stopping Positions: Thorough specifications for stopping positions are laid out in the document.

Electromagnetic Compatibility (EMC)

  • Wayside ATP Conformity: Wayside ATP equipment must conform to CENELEC standards EN50121-2/4 and EN50082-2 for radiated and conducted emissions, as well as EN50081-2. Specific conformity to differing standards is specified as per document.
  • Onboard ATP Conformity: Onboard ATP equipment must conform to IEC 571-1, CENELEC standards EN50155, EN50121-2/4, EN50121-3 and EN50082-2 for radiated and conducted emissions, as well as EN50081-2 (differences noted in document). These same standards are listed, then repeated with additional standards specified.
  • EMC Control Plan: A detailed EMC control plan is required for engineer review, outlining measures for reducing emissions and improving immunity.
  • Frequency-Specific Requirements: Equipment must be capable of operating correctly when exposed to 20V/m field intensity in the 27 to 80 MHz frequency range, meeting CENELEC standards within the 80 to 6000 MHz range.
  • Conducted Immunity Levels: Equipment must remain operational at conducted interference levels specified in EN50082-2 and EN61000-6-2 between 150kHz and 30 MHz.
  • ESD Protection: Equipment with sensitive components is required to have protection against static discharge (6 kV contact, 8 kV air discharge per IEC61000-4-2).
  • Fast Transient Burst: Equipment must withstand fast transient bursts up to 2 kV peak (IEC61000-4-4).
  • Power Surge: Equipment surge resistance to 2 kV (common mode) and 1 kV (differential mode) must be demonstrated per IEC61000-4-5.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

More Like This

Control System SIBAS 32 Overview
81 questions
Automatic Colour Light Signalling Quiz
41 questions
Bhopal and Indore Metro Rail Projects
9 questions
Use Quizgecko on...
Browser
Browser