Chapter 5 WFM
40 Questions
5 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the first step in generating a new schedule?

  • Save and Publish
  • Click Generate (correct)
  • Add Schedule Details
  • Set Schedule Parameters

Only one schedule can be generated per business unit at a time.

True (A)

What must be specified after clicking the Generate Schedule button?

Schedule start week and schedule length

The generated schedule must be ______ to make it visible to agents.

<p>Published</p> Signup and view all the answers

Which option should be selected under the Scheduling Method to create a blank schedule?

<p>Create Blank Schedule (C)</p> Signup and view all the answers

Match the schedule generation processes with their corresponding descriptions:

<p>Blank Schedule = Relies on manual input for configuration Forecast-Based Schedule = Uses forecast data for optimization Publishing = Makes schedule visible to agents Setting Parameters = Defines schedule start and length</p> Signup and view all the answers

Activity counts across agents can be viewed after generating a schedule.

<p>True (A)</p> Signup and view all the answers

What information should be reviewed after generating a forecast-based schedule?

<p>Agents' hours assigned and coverage alignment with forecasted needs</p> Signup and view all the answers

Which method of scheduling is used when no forecast is available?

<p>Expected Shift Patterns (B)</p> Signup and view all the answers

A default view of the schedule opens to the first day of the week.

<p>False (B)</p> Signup and view all the answers

What is the primary purpose of creating a forecast-based schedule for MehGivePlus?

<p>To ensure efficient agent utilization.</p> Signup and view all the answers

A __________ schedule provides flexibility for administrators to manually add agents and shifts.

<p>blank</p> Signup and view all the answers

What is the highest priority message type in schedule generation warnings?

<p>Error (D)</p> Signup and view all the answers

Match the scheduling methods with their descriptions:

<p>Load-Based Scheduling = Uses forecasted needs and constraints from work plans Expected Shift Patterns = Optimizes shifts when no forecast is available Blank Schedules = Allows for manual additions of agents and shifts Forecast-Based Scheduling = Generates schedules using forecast data</p> Signup and view all the answers

Adding the 'Workforce Management > Agent Schedule > Utilize Load Based' permission allows agents to appear instantly in schedules.

<p>False (B)</p> Signup and view all the answers

What is one key benefit of optimizing workforce deployment?

<p>Alignment of resources with demand (A)</p> Signup and view all the answers

Nearly 50% of the Workforce Management configurations for MehGivePlus have been completed.

<p>True (A)</p> Signup and view all the answers

What is the function of the 'Sync Agents' option in Genesys Cloud?

<p>To provide quicker updates to the agent schedules.</p> Signup and view all the answers

The action to verify if time-off requests affect the schedule before publishing is called ______.

<p>Show Time Off Requested Differences</p> Signup and view all the answers

What is the first step in creating a blank schedule in Genesys Cloud?

<p>Access the Schedules Page</p> Signup and view all the answers

Match the following types of messages to their priority level.

<p>Error = Highest priority Warning = Medium priority Information = Lowest priority</p> Signup and view all the answers

Which action should a supervisor take to assign a meeting to multiple agents?

<p>Copy Activity to Agents (C)</p> Signup and view all the answers

Time-off requests can typically be approved after a schedule has been published.

<p>False (B)</p> Signup and view all the answers

What should a supervisor do if the 'Utilize Load Based' permission was added within the last 4 hours?

<p>Click 'Sync Changes' on the Agents List page.</p> Signup and view all the answers

What must be ensured about activities during the rescheduling process?

<p>They must start at least two hours from the current time. (C)</p> Signup and view all the answers

Only agents originally part of the work plan can be rescheduled.

<p>False (B)</p> Signup and view all the answers

What feature allows agents to trade complete shifts with one another?

<p>Shift Trades</p> Signup and view all the answers

The ____ feature allows agents to exchange shifts with suitably qualified colleagues.

<p>Swap Shift</p> Signup and view all the answers

Match the following actions with their corresponding details:

<p>Export Scheduled and Forecast = Includes scheduled data, forecast with and without shrinkage Audit Log Viewer = Tracks saved changes like added or deleted schedules Shift Trades = Enables agents to trade shifts Swap Shift = Allows exchanging shifts between agents directly</p> Signup and view all the answers

What indicates that the rescheduling process has been successfully completed?

<p>The green bar (C)</p> Signup and view all the answers

Shift trades can only be requested by administrators.

<p>False (B)</p> Signup and view all the answers

Where can the Audit Log Viewer be accessed from?

<p>Admin page footer or Admin &gt; Troubleshooting &gt; Audit Viewer</p> Signup and view all the answers

Which of the following actions can be performed in activity management?

<p>Adjust the duration of activities within a shift (C)</p> Signup and view all the answers

It is possible to swap shifts between agents in the schedule management features.

<p>True (A)</p> Signup and view all the answers

What key shortcuts are used to undo and redo changes in the schedule editor on a Windows computer?

<p>Ctrl + Z for undo, Ctrl + Y for redo</p> Signup and view all the answers

To view the schedule by a specific __________, users can select the view option in the schedule editor.

<p>date range</p> Signup and view all the answers

Match the following schedule management actions with their descriptions:

<p>Copy a Schedule = Create a duplicate of an existing schedule Delete a Schedule = Remove a published or unpublished schedule Undo Changes = Revert the last unsaved action taken Initiate an Intraday Reschedule = Reoptimizes shift start and activity times</p> Signup and view all the answers

Which of the following can be reviewed in the adherence information within the schedule editor?

<p>Adherence details (B)</p> Signup and view all the answers

After saving a schedule, changes cannot be undone.

<p>True (A)</p> Signup and view all the answers

What is one purpose of initiating an intraday reschedule?

<p>To reoptimize shift start times, lengths, and activity start times</p> Signup and view all the answers

Flashcards

Forecast-based schedule

A schedule generated based on demand projections, helping ensure efficient agent utilization.

4-week schedule

A schedule for a 4-week period, assigning working hours to all agents weekly.

Load-based scheduling

A scheduling approach where the system uses demand projections to determine the optimal number of agents needed based on anticipated workload.

Expected shift patterns

A scheduling method used when no forecast is available, where the system creates shifts based on preset time spans and start times.

Signup and view all the flashcards

Blank schedule

A blank schedule provides flexibility for administrators to manually add agents and configure their schedules based on specific business requirements.

Signup and view all the flashcards

Select Management Unit

The process of defining the operational unit for which scheduling is being done.

Signup and view all the flashcards

Current day view

The screen that shows the current day's schedule when you access the Workforce Management Schedules page.

Signup and view all the flashcards

Generate schedules

The process of creating a 4-week schedule based on forecast data to determine staffing needs and optimize agent deployment.

Signup and view all the flashcards

Forecast-Based Schedule Generation

A scheduling method in Genesys Cloud that uses forecast data to create weekly schedules that optimize service performance and efficiency.

Signup and view all the flashcards

One Schedule per Business Unit

A key constraint for forecast-based schedule generation: only one schedule can be generated per business unit at a time.

Signup and view all the flashcards

Last Scheduling Attempts

A section on the Schedules page in Genesys Cloud that displays the most recent schedule generation attempts.

Signup and view all the flashcards

Maximum Number of Weeks

A schedule configuration option where you can set the maximum number of weeks for which the schedule will be valid.

Signup and view all the flashcards

Schedule Start Week

A schedule attribute that specifies the starting week for which the schedule will be applied.

Signup and view all the flashcards

Schedule Length

A schedule attribute that specifies the duration of the schedule in weeks.

Signup and view all the flashcards

Publish Schedule

The process of making a schedule visible to agents and allowing them to view their assigned shifts.

Signup and view all the flashcards

Error Message

The highest priority schedule generation message, requiring immediate resolution before proceeding.

Signup and view all the flashcards

Warning Message

A schedule generation message indicating potential issues, needing review and likely action.

Signup and view all the flashcards

Information Message

A schedule generation message providing information for reference but not requiring immediate action.

Signup and view all the flashcards

Permission

The process of granting specific access to perform actions within Genesys Cloud, affecting schedule generation.

Signup and view all the flashcards

Adding Activities

The action of adding scheduled events like meetings or training sessions to agents' schedules.

Signup and view all the flashcards

Swapping Shifts

The process of swapping shifts between two agents in a schedule, accommodating unexpected changes.

Signup and view all the flashcards

Handling Time-Off Requests

The process of managing and approving time-off requests after a schedule is published, ensuring coverage.

Signup and view all the flashcards

Show Time Off Requested Differences

The ability to view the potential impact of approved time-off requests on the published schedule.

Signup and view all the flashcards

Intraday Reschedule

Adjusting the schedule to account for changes in the forecast, such as increased call volume or agent availability.

Signup and view all the flashcards

Schedule Display Options

The ability to change how the schedule is displayed, such as by day, week, or date range.

Signup and view all the flashcards

Team and Unit Selection

The option to filter schedules by specific work groups or teams.

Signup and view all the flashcards

Summary and Count Review

A feature allowing you to see a summary of scheduled and forecast counts, activity counts, and daily summaries.

Signup and view all the flashcards

Adherence Information

The feature to view adherence details directly within the schedule editor, such as agent adherence to their scheduled shifts.

Signup and view all the flashcards

Agent Information: Paid Hours

Viewing daily and weekly paid hours for each agent, which helps with payroll and workforce planning.

Signup and view all the flashcards

Copying a Schedule

The ability to copy an existing schedule to create a new one with personalized details.

Signup and view all the flashcards

Deleting a Schedule

Removing a schedule permanently from the system, either published or unpublished.

Signup and view all the flashcards

Swap Shift

A feature allowing agents to exchange shifts with eligible colleagues directly through the Schedule Editor.

Signup and view all the flashcards

Automatic Review Mode (Shift Trades)

This mode allows admins to approve or deny shift trade requests automatically, sending notifications to involved agents.

Signup and view all the flashcards

Review Queue

Shift trade requests that need administrator review appear here in the Shift Trades view.

Signup and view all the flashcards

Minimum Time Between Trade Approval and Shift Start

Administrators can set a minimum timeframe between shift trade approval and the shift's start time.

Signup and view all the flashcards

Reschedule (Workforce Management)

The option in the Schedule Editor to reschedule existing shifts for agents, while adding new agents to the schedule.

Signup and view all the flashcards

Progress Bar in Reschedule

During the Reschedule process, a red progress bar indicates activity and turns green upon completion.

Signup and view all the flashcards

Configuring Reschedule Settings

In the Reschedule Wizard, you must configure start and end dates for the reschedule process.

Signup and view all the flashcards

Minimum Time for New Activities in Reschedule

When rescheduling, new activities must start at least two hours from the current time.

Signup and view all the flashcards

More Like This

Medical Office Scheduling Methods
9 questions

Medical Office Scheduling Methods

BeneficialThermodynamics avatar
BeneficialThermodynamics
Scheduling Types Flashcards
6 questions
Scheduling and ERP Systems Quiz
42 questions

Scheduling and ERP Systems Quiz

PeaceableHummingbird5880 avatar
PeaceableHummingbird5880
Appointment Scheduling Methods
5 questions
Use Quizgecko on...
Browser
Browser