SAP S/4HANA Production Planning Challenges

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Why might the ordered quantity and yield not automatically update?

  • Because of differences between ordered and actual material usage (correct)
  • Due to variances in scrap percentages
  • Due to the production version being inactive
  • Because the BOM is not maintained correctly

Which of the following presents a notable challenge in SAP ECC Production Planning?

  • The user-friendly nature of the interfaces
  • The ease of planning subcontracting items
  • Ensuring fast, accurate, and real-time Materials Requirements Planning (MRP) (correct)
  • BOM determination via production version

In Repetitive Manufacturing (REM), what serves as the primary cost object?

  • Product Cost Center
  • Production/Process Order
  • Product Cost Collector (correct)
  • REM Profile in the Material Master

Which of the following describes how SAP S/4HANA enhances the effectiveness of business processes?

<p>By processing events in real-time (C), By predicting events with advanced algorithms (D)</p> Signup and view all the answers

In Sales & Operations Planning (S&OP), what is the relationship between the Sales plan and the Production plan?

<p>They can be the same or different (B)</p> Signup and view all the answers

Which of the following statements accurately describes a routing type?

<p>Routing is typically used in Discrete Manufacturing (D)</p> Signup and view all the answers

Which of the following is NOT a capability supported by MRP Live?

<p>Multi-level, make-to-order planning (C)</p> Signup and view all the answers

Which of the following represents the key benefits of using Material Requirements Planning (MRP) with SAP S/4HANA?

<p>Faster reaction to demand changes and reduced risk of stock-outs (B), Faster re-planning for more frequent MRP runs (D)</p> Signup and view all the answers

When procuring materials externally, what factor does the system use to calculate the lead time?

<p>Planned Delivery Lead Time (D)</p> Signup and view all the answers

Which of the following options is NOT a material master view?

<p>PP/DS (D)</p> Signup and view all the answers

When the settings for MRP are maintained at different levels, what sequence does the system follow to search for these settings?

<p>Material Master -&gt; MRP Group -&gt; Plant Settings (B)</p> Signup and view all the answers

What is the effect of setting the 'Net Scrap Indicator'?

<p>Assembly scrap is ignored. (A)</p> Signup and view all the answers

In which of the following cannot a work center be used?

<p>BOM (C)</p> Signup and view all the answers

Which of the following is NOT an accurate statement about SAP S/4HANA?

<p>It is a legal successor of SAP Business Suite product. (A)</p> Signup and view all the answers

The SAP ECC business suite in SAP S/4 HANA which covers all lines of business is called as:

<p>SAP S/4 HANA Enterprise Management (B)</p> Signup and view all the answers

Flashcards

Challenges in SAP ECC Production Planning

Materials Requirements Planning needs to be fast, accurate and real time.

Cost Object in REM

A Product Cost Collector.

How SAP S/4HANA Raises Effectiveness

By processing events in real time and predicting events with advanced algorithms

S&OP Sales & Production Plans

Sales & Production plan details Can be Different or same

Signup and view all the flashcards

Correct Statements about Routing

Routing is in Discrete Manufacturing

Signup and view all the flashcards

MRP Live Does Not Support

Multi-level, make-to-order planning

Signup and view all the flashcards

Benefits of MRP with S/4HANA

Faster reaction to demand changes and reduced risk of stock-outs

Signup and view all the flashcards

Lead Time Calculation for External Procurement

Planned Delivery Lead Time

Signup and view all the flashcards

Not a Material Master View

PP/DS

Signup and view all the flashcards

Sequence of MRP Settings Search

Material Master -> MRP Group -> Plant Settings

Signup and view all the flashcards

Effect of Net Scrap Indicator

Set this indicator if you want assembly scrap to be ignored

Signup and view all the flashcards

Work Center Cannot Be Used In

BOM

Signup and view all the flashcards

Not True About SAP S/4 HANA

Its is a legal successor of SAP Business Suite product

Signup and view all the flashcards

SAP ECC Business Suite in S/4 HANA

SAP S/4 HANA Enterprise Management

Signup and view all the flashcards

Not a Tab in Work Center Creation

Costing

Signup and view all the flashcards

Study Notes

  • Challenges in SAP ECC Production Planning include fast, accurate, and real-time Materials Requirements Planning (MRP).

  • In Repetitive Manufacturing (REM), the cost object is a product cost collector.

  • SAP S/4HANA enhances business process effectiveness by processing events in real-time and predicting events with advanced algorithms.

  • Sales & Operations Planning (S&OP) allows for sales and production plan details to be the same or different.

  • Routing is correct in Discrete Manufacturing.

  • MRP Live does not support multi-level, make-to-order planning.

Benefits of Material Requirements Planning (MRP) with SAP S/4HANA

  • Enables faster reaction to demand changes and reduces stock-out risks.

  • Allows for faster re-planning for more frequent MRP runs.

  • For externally procured materials, the system uses planned delivery lead time to calculate lead time.

  • PP/DS is not a material master view.

  • The system searches for MRP settings in the following sequence: Material Master -> MRP Group -> Plant Settings.

  • Setting the net scrap indicator means that assembly scrap will be ignored.

  • A work center cannot be used in a Bill of Materials (BOM).

SAP S/4 HANA

  • SAP S/4 HANA is: -A next-generation business suite. -Built on SAP HANA in-memory platform. -Delivers simplifications and innovations for digital businesses.

  • SAP Business Suite product is not a legal successor

  • The SAP ECC business suite in SAP S/4 HANA, covering all business lines, is called SAP S/4 HANA Enterprise Management.

  • A tab not found in work center creation is costing.

  • Control key is not a mandatory field during work center creation.

  • In S/4 HANA, the BOM Selection method field is unavailable in the material master.

  • Master recipes and work centers master data can be used with process orders.

Bill of Materials (BOM)

  • Different available Bill of Materials categories are: -Material BOM -Sales Order BOM -Equipment BOM

  • The S&OP process flow is S&OP-PIR-MRP-Shop Floor Execution.

  • Characteristics not associated with DM include comparatively wider specifications.

  • A purchase requisition is not a requirement element.

  • Sales & Operation Planning (SOP) is a planning tool for creating sales and production plans.

  • In S/4 HANA, MRP at the plant level is unavailable, instead of planning on a storage location, MRP Area

  • When material master contains both lot size-dependent and lot size-independent values, the system prefers Lot Size dependent quantity.

  • Demand Driven Replenishment is the new MRP procedure introduced in S/4 HANA.

SAP S/4HANA Data Footprint Reduction

  • Massively reduce data footprint by: -Removing redundant historical information. -Eliminating unnecessary data tables.

MRP Live

  • Applicable to MRP Live: -Flexible planning scope definition. -The sequence of planning materials is calculated across plants.

  • Relevant routing sequence: Header, Sequence, Operations, Work center.

  • In the material master, in-house production time resides in the MRP 2 and Work Scheduling views.

  • Transfer of S&OP to Demand Management results in the generation of PIRs.

Material Requirement Planning Live

  • Material Requirement Planning Live -Transfer of S&OP to Demand Management results in the generation of Planned Orders -MRP lists in MRP live will display the plant wise material details is not true.

  • Scheduling in S/4 HANA Manufacturing determines both production and procurement dates.

  • Planning strategy refers to the way materials are planned and how requirements are passed on in Production and Procurement.

  • Correct logic sequence in Planning Strategy settings: Material Master - Strategy Group - Main Strategy - Requirement Type.

  • Under Group, one or more group counters can exist for the same Material & Plant combination in Routing.

  • CAPP functionality is no longer supported in SAP S/4 HANA.

  • A typical Manufacturing cycle includes Order Planning, Requirement Planning, Order Execution, Goods Movement, and Order Completion.

  • DP is not included as part of the S/4 HANA Digital Core.

SAP S/4 HANA Field Length

  • Material Number -The material number field length in material master has been extended from 18 to 40 characters

Business Requirement Guideline

  • Business requirement guidelines while selecting a strategy: -Decide whether existing forecasts should be consumed by sales orders? -Determining where the planning location to be executed?

  • Whether the components needs to be acquired prior to sales?

  • The organizational unit using the manufacturing, planning, and execution process in SAP S/4 HANA is plant.

  • The SAP Activate methodology for On-Premise solutions includes Preparation, Business Blueprint, Realization, Final Preparation, and Go Live-Support.

  • Bill of Materials (BOM) can consist of both In-house production and External procured components.

Simplified Supply Chain in SAP S/4HANA

  • Simplified supply chains enable: -Production Planning and Detailed Scheduling (PP/DS) as an integral manufacturing element. -Closer integration of available-to-promise (ATP) into execution processes

  • S/4 HANA MRP does not support planning on the storage location level.

  • SAP S/4 HANA Cloud upgrades scheduled on a quarterly basis.

  • The new Fiori application simplifying planning and shortage tasks for MRP Controllers is the MRP Cockpit.

  • There is default integration between S4 HANA & APO (PPDS) that result in real time integration. Master data like Material Master and Work Center are maintained centrally only in S/4 HANA.

  • Product group in S&OP is a Collection of all the materials that needs to be Planned.

  • In REM profile, the movement types 131, 261, 551, 122, 262 & 552 details are provided.

Technologies Enabling SAP S/4HANA

  • Technological advances that enabled SAP S/4HANA include: -Big and affordable memory. -Multi-core processors enabling parallelism of tasks. -Ability to add server landscape and scale.

  • One key difference between standard routing and rate routing is that Standard routing can provide alternative sequence.

  • Flow of semi-finished goods from a customer to a supplier is not the correct flow in SCM material classification.

  • In S/4 HANA MRP, planning run types include NETCH (Net change planning) and NEUPL (Regenerative planning).

Key Concepts of SAP S/4HANA

  • Key concepts of SAP S/4HANA include: -Completely SAP Fiori-enabled user interaction. -Simplified data model. -Guided configuration.

  • Not the correct parameter defined by Requirement Class is Contols the creation of Purchase Requisition based on consumption based planning

  • Consumption-based planning is typically employed for the materials that consists of smooth consumption pattern.

  • By default, the system uses backward Scheduling type.

  • Calculation of the cost of an activity depends on the activity rate for the cost center, formula assigned and Parameters maintain in routing,

Transitioning to SAP S/4HANA

  • Tasks required during transition to SAP S/4HANA are: -Adaptation of the new SAP Fiori user interface technology. -Adaption of custom code to comply with SAP S/4HANA.

SAP Fiori Categories

  • The 3 categories of SAP Fiori are: -Transaction App. -Fact Sheets. -Analytical App.

  • Order Confirmation parameters are defined at the plant and order type combination level

  • In Planning without Final Assembly, Production is determined by sales order and there is no consumption of PIR is not correct.

MRP Live speed results from

  • Faster performance due to: -Reading many tables in parallel using SAP HANA capabilities.

  • All Manufacturing master data and Planning activities are performed at plant level.

S/4 HANA Innovations in MRP

  • S/4 HANA innovations in MRP include: -No planned orders for external procurement, only purchase requisitions. -Storage location MRP is available (deactivatable). -MRP & MPS materials planned together in single run

  • The Component Scrap field is available at the Material master and Bills of material

  • Order-based production is not a characteristic of repetitive manufacturing.

  • Assembly scrap is maintained in the material master.

  • Automatic posting of goods movement - Goods Issue only is commonly known to be a Backflush.

Capacity Requirements

  • The capacity requirements for a planned order is calculated based on: -Quantity in the Planned order. -Available capacity in the Work center. -Available Capacity at routing is evaluated based on the information stored at the work center

  • Available capacities can be maintained in the work center in S/4 HANA system.

  • The REM Profile is assigned in the material master for Repetitive Manufacturing process.

  • It is not mandatory to assign REM profile in the material master is not applicable. The REM Profile is assigned is assigned in production version.

  • Work Center Scrap is not an example of scrap.

  • SAP S/4 HANA Cloud landscape consists of Quality & Production System

  • In S/4 HANA EM, NAST is obsolete and BRF+ is introduced

  • Simplified sequence of work centers, steady flow of production and Material Staging at lines is an example of Repetitive Manufacturing.

  • Planned delivery time present in the MRP2 view of the material master is considered in external procurement proposal.

  • Batch Production Manufacturing is is among the main production processes in SAP S4 HANA

  • The operation quantity mentioned in the routing is based on Timings mentioned in routing as standard values

  • Selection using a production version are BOM selection possibilities are available for opening a production order.

  • Resource in PP-PI is same as Work Center in Discrete or REM Manufacturing

  • Master Production Scheduling component under MRP is used to flag the materials which affect the company profits and also takes the critical resources.

  • In the near future, S/4 HANA, Integrated Business Planning will replace S&OP.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

More Like This

Use Quizgecko on...
Browser
Browser