SAP S/4HANA: Key Figures, CDS Views, and Allocations
44 Questions
8 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

For which objects can you enter statistical key figures? Note: There are 3 correct answers to this question.

  • Cost centers (correct)
  • Cost elements (correct)
  • WBS elements
  • Functional areas
  • Internal orders (correct)

What are some of the characteristics of SAP Core Data Services (CDS) views? Note: There are 3 correct answers to this question.

  • CDS views have no latency. (correct)
  • CDS views are considered system modifications.
  • CDS views support authorizations. (correct)
  • CDS views duplicate data for reporting efficiencies.
  • CDS views have ready-to-use content. (correct)

You are running an indirect activity allocation. What do you post to the sender and receiver?

  • You post quantity and cost to both the sender and receiver. (correct)
  • You post only cost to both the sender and receiver.
  • You post both quantity and cost to the sender, and cost only to the receiver.
  • You post both quantity and cost to the receiver, and cost only to the sender.

How can you configure the transfer price solution in SAP S/4HANA? Note: There are 2 correct answers to this question.

<p>Use separate currency types within the same ledger for each valuation. (A), Use separate ledgers for each valuation. (D)</p> Signup and view all the answers

Which statement best describes cost center standard hierarchy?

<p>It is a structure to which all the cost centers within a controlling area are assigned. (C)</p> Signup and view all the answers

From which tables does SAP S/4HANA select line items in costing-based Profitability Analysis reports? Note: There are 2 correct answers to this question.

<p>CE1XXXX (C), CE2XXXX (D)</p> Signup and view all the answers

You have implemented Product Cost by Sales Order in conjunction with revenue-based results analysis in your organization. For a particular sales order item, you have the following: Plan revenue = 3000 Plan costs = 2000 Actual revenue = 1200 Actual costs = 1000 What data does the system calculate during results analysis?

<p>Revenue = 1200; Cost of sales = 800; WIP = 200 (C)</p> Signup and view all the answers

How does the system derive the requirement type from the material master data? Note: There are 2 correct answers to this question.

<p>MRP group -&gt; strategy group -&gt; planning strategy -&gt; requirements type (A), Strategy group -&gt; planning strategy -&gt; requirements type (B)</p> Signup and view all the answers

Where do you define which cost elements are used during internal order settlement?

<p>Source structure (D)</p> Signup and view all the answers

How can you define the overhead rate in a costing sheet? Note: There are 2 correct answers to this question.

<p>As quantity-based surcharge (C), As percentage rate (D)</p> Signup and view all the answers

You are setting up costing-based Profitability Analysis for your organization. What are related configuration activities? Note: There are 3 correct answers to this question.

<p>Assign value fields to conditions (B), Configure summarization levels (C), Define characteristics (D)</p> Signup and view all the answers

You post a billing document for a sales order with sales order controlling. What data flows to Profit Center Accounting? Note: There are 2 correct answers to this question.

<p>Sales deductions (A), Revenues (B)</p> Signup and view all the answers

What do you need to set up in order to bring the values from incoming sales orders into account-based Profitability Analysis?

<p>An extension ledger of type &quot;S: Line items with technical numbers / deletion possible&quot; (B)</p> Signup and view all the answers

Your enterprise has five company codes assigned to three separate operating charts of accounts. What is the optimal way of configuring the relationship between operating concerns and controlling area?

<p>One operating concern; three controlling areas (D)</p> Signup and view all the answers

Which default values can you configure for the product cost collector? Note: There are 2 correct answers to this question.

<p>Results Analysis (RA) key (C), Costing variant for preliminary costing (D)</p> Signup and view all the answers

You want to maintain a cost component structure. What can you determine for each cost component? Note: There are 3 correct answers to this question.

<p>Assignment of cost component to calculation base for overheads in costing sheet (A), Relevance of cost component to goods manufactured (C), Relevance of cost component to inventory valuation (D)</p> Signup and view all the answers

What can you manage via the account assignment category? Note: There are 2 correct answers to this question.

<p>Accounting via sales order (B), Separate sales order stock (D)</p> Signup and view all the answers

You want to understand why costs are collected on the sales order item level. What do you need to check in the configuration? Note: There are 3 correct answers to this question.

<p>Requirement type (A), Requirements class (B), Account assignment category (D)</p> Signup and view all the answers

What are some of the unique attributes of an assessment cycle in Controlling? Note: There are 3 correct answers to this question.

<p>They transfer primary and secondary costs. (A), They use a secondary cost element during transfer. (B), They can be defined with an allocation structure. (D)</p> Signup and view all the answers

Which setting in the cost center master data do you use to assign the same attributes to similar cost centers?

<p>Cost center category (D)</p> Signup and view all the answers

At which level do you define the valuation method for results analysis?

<p>Controlling area (A)</p> Signup and view all the answers

What are the prerequisites for automatic generation of the settlement rule to a market segment for a sales order item? Note: There are 2 correct answers to this question.

<p>The sales order item is assigned to a project. (B), Costing-based profitability analysis is activated. (C)</p> Signup and view all the answers

How would you explain automatic account assignment in SAP S/4HANA? Note: There are 2 correct answers to this question.

<p>It can be defined for postings on general ledger accounts of primary costs type. (B), Proposed values can be overwritten in the application. (D)</p> Signup and view all the answers

You configure the commitment management solution for cost centers and projects in your SAP S/4HANA system. Which documents can create commitments against the budget?

<p>Purchase requisition for purchasing office materials (B)</p> Signup and view all the answers

In which module do you process profit center allocations in SAP S/4HANA?

<p>Account-based profitability analysis (C)</p> Signup and view all the answers

How do you maintain number range intervals for documents in Controlling? Note: There are 2 correct answers to this question.

<p>By controlling area (C), By business transactions (D)</p> Signup and view all the answers

Which type(s) of Profitability Analysis update(s) the cost of goods sold at the time of delivery only?

<p>Margin analysis (C)</p> Signup and view all the answers

Which statements are relevant to the cost of sales accounting method in profitability management? Note: There are 2 correct answers to this question.

<p>It aims to match revenues for goods and services against sales-related expenses. (B), It presents the costs and revenues information in a format that is ideal for conducting margin analyses. (C)</p> Signup and view all the answers

What are some of the characteristics of planning for internal orders? Note: There are 2 correct answers to this question.

<p>You can enter costs and revenues. (B), You can define tolerance limits for plan overspend. (C)</p> Signup and view all the answers

You want to enable WIP calculation in Product Cost by Period. What do you need to configure?

<p>Valuation variant (D)</p> Signup and view all the answers

What can you do with statistical internal orders? Note: There are 2 correct answers to this question.

<p>Simultaneously post to a cost center. (B), Perform results analysis. (D)</p> Signup and view all the answers

You have implemented Product Cost by Sales Order in conjunction with cost-based POC results analysis in your organization. For a particular sales order item, you have the following: Plan revenue = 3000, Plan costs = 2000, Actual revenue = 1200, Actual costs = 1000. What data does the system calculate during results analysis?

<p>Revenue = 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 300 (C)</p> Signup and view all the answers

To which objects can you settle an internal order using cost elements with cost element category 21 (internal settlement)? Note: There are 3 correct answers to this question.

<p>Sales order item (A), WBS element (C), Network (D)</p> Signup and view all the answers

In the material master record, there are three planned prices: "Planned price 1," "Planned price 2," and "Planned price 3." What do you use them for? Note: There are 2 correct answers to this question.

<p>To evaluate the materials in cost estimates (B), To valuate future goods movements (D)</p> Signup and view all the answers

What parameters can you set up when defining order types? Note: There are 2 correct answers to this question.

<p>Allow revenue postings (A), Define default parameters for master record fields (B)</p> Signup and view all the answers

Which model can be used for ABAP cloud-native development?

<p>The ABAP Cloud Development Model (A)</p> Signup and view all the answers

What are characteristics of SAP S/4HANA embedded analytics? Note: There are 2 correct answers to this question.

<p>It uses core data services (CDS) views to create virtual data models (VDMs) for reporting. (C), It is part of the core SAP S/4HANA license and uses the same technical stack and user interface. (D)</p> Signup and view all the answers

To which object do you assign a costing sheet?

<p>Valuation variant (D)</p> Signup and view all the answers

In SAP S/4HANA, you have decided to activate only account-based profitability analysis for your organization. You want to settle costs and revenue of a sales order item to a profitability segment. What do you need to configure?

<p>A transfer structure (D)</p> Signup and view all the answers

Which processes split costs into their primary cost components? Note: There are 2 correct answers to this question.

<p>Cost center/activity type price calculation (A), Business process price calculation (B)</p> Signup and view all the answers

You would like to allocate primary and secondary costs from a cost center to another cost center. Which allocation method will you use?

<p>Assessment (B)</p> Signup and view all the answers

For which of the following situations would you need to implement the transfer price solution in SAP S/4HANA?

<p>Parallel valuation views of the same logistical flows are needed to differentiate between legal and group valuation. (B)</p> Signup and view all the answers

Why would you use manual cost allocation in Controlling? Note: There are 2 correct answers to this question.

<p>To run simple allocations of actual data (A), To correct secondary postings (B)</p> Signup and view all the answers

You want to determine which operations of the routing should be considered in a product cost calculation. How do you do this? Note: There are 2 correct answers to this question.

<p>By marking the cost indicator in the control key assigned to the operation (C), By marking the Relevance to Costing indicator in the operation (D)</p> Signup and view all the answers

Flashcards

Statistical Key Figure Objects

Objects (like cost centers, internal orders, and cost elements) where you can input statistical key figures.

SAP CDS View Characteristics

Data access with no delay, ready-to-use content, and built-in security features for data reporting.

Indirect Activity Allocation Postings

Both the quantity and cost are posted to both the sending and receiving objects.

Transfer Price Configuration

Use separate ledgers or distinct currency types within the same ledger.

Signup and view all the flashcards

Cost Center Standard Hierarchy

A structure where all cost centers within a controlling area are assigned.

Signup and view all the flashcards

CO-PA Line Item Tables

CE2XXXX and CE1XXXX

Signup and view all the flashcards

Results Analysis

The system computes a WIP value to align with results analysis requirements

Signup and view all the flashcards

Requirement Type Derivation

MRP group -> strategy group -> planning strategy -> requirements type, Strategy group -> planning strategy -> requirements type

Signup and view all the flashcards

Source Structure

Determines which cost elements are utilized during internal order settlement.

Signup and view all the flashcards

Overhead Rate Definition

As a percentage rate OR a quantity-based surcharge.

Signup and view all the flashcards

CO-PA Configuration Activities

Defining characteristics, assigning value fields to conditions, and configuring summarization levels.

Signup and view all the flashcards

Data Flow to Profit Center Accounting

Revenues and sales deductions

Signup and view all the flashcards

Account-Based CO-PA Setup

An extension ledger of type 'S: Line items with technical numbers / deletion possible'

Signup and view all the flashcards

Op Concern/Controlling Area Relationship

One operating concern; three controlling areas

Signup and view all the flashcards

Product Cost Collector Default Values

Results Analysis (RA) key and the costing variant for preliminary costing

Signup and view all the flashcards

Cost Component Structure

Determining assignment of cost component to calculation base, relevance to goods manufactured, and relevance to inventory valuation.

Signup and view all the flashcards

Account Assignment Category

Accounting via sales order & Separate sales order stock.

Signup and view all the flashcards

Cost Collection Drivers

The requirement type, account assignment category, and requirements class.

Signup and view all the flashcards

Characteristics of Assessment Cycle

They use a secondary cost element during transfer, They transfer primary and secondary costs, They can be defined with an allocation structure

Signup and view all the flashcards

Group attributes to cost centers

Cost center category.

Signup and view all the flashcards

Results Analysis Valuation Level

Controlling area

Signup and view all the flashcards

Settlement Rule Prerequisites

Costing-based profitability analysis is activated and The sales order item is assigned to a project

Signup and view all the flashcards

Automatic Account Assignment in SAP S/4HANA

It can be defined for postings on general ledger accounts of primary costs type, Proposed values can be overwritten in the application

Signup and view all the flashcards

Commitment Management Budget Impact

Purchase requisition for purchasing office materials

Signup and view all the flashcards

Profit Center Allocations

Account-based profitability analysis

Signup and view all the flashcards

Number Range Intervals

By business transactions and By controlling area

Signup and view all the flashcards

COGS Update Trigger

Margin analysis

Signup and view all the flashcards

Accounting Method: Cost of Sales

Presents margin analyses and Aims to match revenues against sales expenses.

Signup and view all the flashcards

Planning for Internal Orders

You can enter both costs and revenues and User can also set tollerances in event of overspending.

Signup and view all the flashcards

WIP Calculation Configuration

Valuation variant.

Signup and view all the flashcards

Costing Relevance

Include operations in product cost calculations.

Signup and view all the flashcards

Operating Concern Level

At the controlling area level.

Signup and view all the flashcards

Update Standard Price

Release, run, and mark the cost estimate.

Signup and view all the flashcards

Template Assignment

Using an overhead group and an overhead key.

Signup and view all the flashcards

Commitment Management Activation

Activate commitment management at the order type level and the controlling area.

Signup and view all the flashcards

Cost Center Budget

Import budget values via CSV and transfer budgets across cost centers.

Signup and view all the flashcards

Single Costing Run

Inventory cost estimates for a single plant or standard cost estimates within a controlling area's company codes.

Signup and view all the flashcards

Explore Released APIs

SAP Business Accelerator Hub.

Signup and view all the flashcards

Settlement Profile

Configure whether a settlement is required and define the settlement document type.

Signup and view all the flashcards

SAP S/4HANA Reporting

Provides real-time reporting at every level of detail.

Signup and view all the flashcards

Product Cost by Period

Used with a product cost collector and is suitable for stable production processes.

Signup and view all the flashcards

Profit Center Accounting

Integrated into the Universal Journal and supports both period and cost of sales accounting.

Signup and view all the flashcards

Budget Availability Control

Purchases within tolerance or cost accounts exempt.

Signup and view all the flashcards

Profitability Analysis Objectives

Assess performance of market segments and monitor sales team margins.

Signup and view all the flashcards

Profitability Segment

Account-based Profitability Analysis must be active, and the G/L account type must be primary cost/revenue or secondary cost.

Signup and view all the flashcards

Assessment Cycle Objects

Tracing factors.

Signup and view all the flashcards

Status Profile

Define initial statuses, control specific transactions, controls order-specific rules.

Signup and view all the flashcards

Reference variant

To create a new standard cost estimate based on the quantity structure of the existing standard cost estimate.

Signup and view all the flashcards

Additional CO Versions

Additional CO versions can store data for parallel valuations and different planning scenarios.

Signup and view all the flashcards

Budget Availabilty Control

Budget availability control allows checking funds based on overall plan value and tolerance limits.

Signup and view all the flashcards

Order as Receiver

For a product cost collector, order is a requirement.

Signup and view all the flashcards

Populate Local Variables

Local variables can be populated through user entry during report execution

Signup and view all the flashcards

Creating profit center

A newly created profit center is assigned to all company codes within the controlling area.

Signup and view all the flashcards

Product Cost by Order

Suitable for scenarios requiring full cost traceability and individual control of production lots.

Signup and view all the flashcards

Plan Prices

Activity type record should include CO version, valid cost center categories, category.

Signup and view all the flashcards

Clean Core Integrations

Encourages modern API frameworks such as SOAP and OData

Signup and view all the flashcards

Templates for Activity based costing

Assign costs more accurately based on real activities

Signup and view all the flashcards

Clean COre Operations

Reducing custom code modifications and using management to upgrade SAP environment

Signup and view all the flashcards

Billing to Cost Analysis

Values such as condition pricing and COGS are transferred

Signup and view all the flashcards

Capture Costs

Both primary and secondary used within the universal journal for financial data

Signup and view all the flashcards

Study Notes

Determining Operations for Product Cost Calculation

  • Mark the cost indicator in the control key.
  • Mark the Relevance to Costing indicator in the operation.

Structure of Operating Concern

  • The structure is created at the controlling area level to enable margin analysis.

Updating Standard Price of Material

  • Run Cost Estimate
  • Mark cost estimate
  • Release Cost Estimate

Product Costing Assignment

  • Assign an overhead group and overhead key to include overhead costs.

Commitment Management Activation Location

  • Commitment management is activated at the order type level.
  • Commitment management is activated in the controlling area.

Cost Center Budget Management: Available Functions

  • Import budget values with a CSV file.
  • Budget transfer from a source cost center to multiple target cost centers.

Scenarios Covered by Single Costing Run

  • Inventory cost estimate for material in a single plant.
  • Standard cost estimate for all materials in all company codes of a controlling area.

Explore Released APIs

  • Use the SAP Business Accelerator Hub to explore released APIs.

Settlement Profile Configuration

  • Determine whether settlement is required.
  • Define settlement document type.

Data Reporting in SAP S/4HANA

  • Data is available in real-time at every level of detail.

Product Cost by Period

  • Can be used with a Product Cost Collector
  • Used when the focus of controlling is on a stable and continuous production process.

Main Characteristic of Profit Center Accounting

  • It can be used with the period and/or cost of sales accounting.
  • It is integrated into the Universal Journal.

Budget Availability Control

  • Budget allows the purchase order if the amount falls within defined tolerance limits.
  • If cost accounts are exempt, a budget availability control allows the purchase order

Objectives of Profitability Analysis

  • Provide the company with information on the performance of market segments.
  • Ensure sales forces achieve their contribution margin goals.

Deriving Profitability Segment

  • Account-based Profitability Analysis must be active.
  • G/L account type must be primary cost/revenue or secondary cost.

Objects That Can Be Part of the Assessment Cycle

  • Tracing factors

Define Tracing Factors

  • Cost elements

Using Status Profile For

  • Define initial statuses and control specific transactions
  • Help set order-specific rules for users

Creating a New Version of an Existing Standard Estimate

  • A Reference variant allows us to create an estimate using the quantity structure of an existing one.

Additional CO Versions

  • Can store data for valuations and planning scenarios

Check When Using Budget Availability Control

  • Check funds based on the plan and tolerance in projects

Receiver That Must Be Allowed in the Profile

  • Order

Populate Local Variables in Profitability Reports

  • Use user entry

Assign New Profit Center by Default

  • All company codes where the controlling area is.

State Best Describe Product Cost per Order

  • When full cost traceability is needed and control is individual

Create Maintain Plan Prices for a Cost Center

  • CO version, valid cost center categories, activity type

API Types for Clean Integrations

  • SOAP and OData

Objects Can Be Selected in the Activity Types

  • Business process and Cost center/activity type combinations

Guiding Principles to Achieve Clean Operation

  • Reduce custom code, manageable SAP integration

###Values That Will Flow from SD:

  • Value conditions price process
  • Goods sold

Capture Cost By

  • Cost elements and Ledger account

Setup as Time-Based

  • Activity and cost center

Controlled by the Costing Type

  • Date key and Price updates

Direct Internal Activity Allocation

  • Valid Receivers: sales order item, internal order, WBS element.

Field Selectable for Both Costing-Based and Account-Based Profitability Analysis

  • Cost element

Values Calculated Using Results Analysis

  • Reserves for unrealized costs, work in progress, and cost of sales

Integrated Planning for Internal Orders Setup

  • Set indicators in the CO version and in the internal order master record

Product Cost by Order Calculation

  • WIP at target costs or variances

Statistical Key Figures

  • Statistical key figures are entered for cost elements, cost centers, and internal orders in SAP S/4HANA.
  • These serve as basis quantities in allocation cycles to distribute costs across various dimensions.

SAP Core Data Services (CDS) Views

  • CDS views in SAP S/4HANA offer real-time data access, meaning they have no latency.
  • The views come with ready-to-use content.
  • CDS views support authorizations, which ensure data security within reporting frameworks.

Indirect Activity Allocation

  • In SAP S/4HANA, both quantity and cost are posted to the sender and receiver in an indirect activity allocation. This facilitates accurate tracking and balances activity quantities with associated costs.

Transfer Price Solution Configuration

  • Transfer pricing in SAP S/4HANA can be configured using separate ledgers or distinct currency types within the same ledger.
  • This setup accommodates multiple valuations according to legal, group, and profit center reporting standards.

Cost Center Standard Hierarchy

  • A mandatory structure for each controlling area encompasses all cost centers, providing a basis for consistent reporting and data aggregation.

Costing-Based Profitability Analysis Tables

  • CE2XXXX and CE1XXXX tables store profitability data in SAPS/4HANA. These tables are used for reporting detailed cost and revenue allocations.

Product Costing with Sales Order

  • Implemented alongside revenue-based results analysis, SAP S/4HANA calculates revenue, cost of sales, and WIP based on actual data. The system then computes a WIP value to align with results analysis requirements.

Deriving Requirement Type

  • In SAP S/4HANA, the requirement type is derived based on MRP or strategy group settings.
  • This links planning strategies to requirement types for Material Requirements Planning.

Internal Order Settlement

  • The source structure in SAP S/4HANA determines cost elements for internal order settlement, mapping costs to specific categories for transfer to the assigned receiver.

Overhead Rate Definition

  • Overhead rates can be defined in a costing sheet as a percentage rate or a quantity-based surcharge. This allows allocating overhead based on usage or as a percentage of base costs.

Setting up Costing-Based Profitability Analysis

  • Setting it up involves defining characteristics, assigning value fields to conditions, and configuring summarization levels. These steps enable detailed profitability reporting and segmentation in SAP S/4HANA.

Billing Document Posting

  • During billing document posting in SAP S/4HANA, revenues and sales deductions are transferred to Profit Center Accounting. This allows companies to assess profitability by profit center more accurately.

Account-Based Profitability Analysis for Sales Orders

  • An "S" type extension ledger is used to integrate incoming sales orders in account-based Profitability Analysis
  • This enables management of predictive entries with deletion options.

Operating Concern and Controlling Area Relationship

  • A single operating concern linked to multiple controlling areas is optimal for unified reporting, allowing adaptation to local requirements while sharing consolidated data.

Product Cost Collector Default Values

  • Default values for the Results Analysis (RA) key and the costing variant for preliminary costing can be configured for product cost collectors.

Cost Component Structure Maintenance

  • For each cost component, you can determine:
  • Assignment to calculation base for overheads in costing sheet.
  • Relevance to goods manufactured
  • Relevance of cost component to inventory valuation

Account Assignment Category Management

  • The account assignment category in SAP S/4HANA manages accounting via sales orders and separate sales order stock, tracking sales order-related costs and inventory.

Sales Order Item-Level Cost Collection Configuration

  • To ensure costs are collected at the sales order item level, check settings for:
  • Requirement type
  • Account assignment category
  • Requirements class

Assessment Cycle Attributes

  • Assessment cycles use secondary cost elements, support primary and secondary cost transfers, and can be structured using allocation structures, allowing flexible cost distribution.

Cost Center Attributes

  • The cost center category allows grouping of similar cost centers for consistent attribute assignments, streamlining configuration and reporting.

Valuation Method for Results Analysis Definition

  • Defined at the controlling area level, the valuation method ensures consistent valuation logic for all cost objects within that area.

Automatic Settlement Rule Generation for Sales Order Item Prerequisites

  • Costing-based profitability analysis must be active, and the sales order item must be assigned to a project for automatic settlement rule generation in SAP S/4HANA.

Automatic Account Assignment

  • Can be defined for postings on general ledger accounts of primary costs.
  • Proposedvalues can be overwritten in the application.
  • It allows defining default account assignments for primary cost postings, with the option to adjust as needed.

Budget Commitments

  • Purchase requisitions create commitments against budgeted amounts, allowing tracking of anticipated expenses to manage budget adherence.

Profit Center Allocations

  • Managed within account-based profitability analysis, ensuring alignment of profitability and cost management.

Number Range Intervals Maintenance

  • Number range Intervals Is maintained by business transactions and controlling area, allowing structured document numbering.

Profitability Analysis Updates

  • Margin analysis updates the cost of goods sold (COGS) at delivery aligning reporting with revenue recognition and enabling timely COGS updates.

Cost of Sales Accounting Method in Profitability Management

  • Presents revenues alongside sales-related expenses facilitating margin analysis
  • Aims to match revenues for goods and services against related expenses

Internal Orders

  • Entry of costs and revenues is allowed.
  • Tolerance limits for plan overspend can be defined.

Enabling WIP Calculation

  • The valuation variant is required to configure WIP calculation in Product Cost by Period
  • It determines the costing strategy and defines which costs are included in the WIP calculation

Statistical Internal Orders

  • Statistical internal orders are used for mainly reporting and monitoring purposes. Postings are simultaneously made to both the internal order and a cost center.
  • They can be used to perform results analysis for budgeting and cost tracking.

Results Analysis for Sales Orders

  • Calculates values based on actual performance and cost-based percentage of completion.

  • Internal. cost object:
  • order, network
  • item,
  • wbs

Planned prices:

  • estimate material, movment

types

  • Revnu
  • default

AP Ab cloud nativ

Model "cloud"

S/4HANA embeed;

Real time core licence

costing

valoracion

acbas settl

tranf Spliting

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Description

Explore statistical key figures, SAP Core Data Services (CDS) views, and indirect activity allocation in SAP S/4HANA. CDS views offer real-time data access and support authorizations. Transfer pricing can be configured using separate ledgers or distinct currency types.

More Like This

Use Quizgecko on...
Browser
Browser