Podcast
Questions and Answers
Which production integration scenario is supported by inventory-managed storage locations?
Which production integration scenario is supported by inventory-managed storage locations?
- Delivery-based production supply (correct)
- Advanced production integration
- Both A and B
- None of the above
Which of the following are Kanban parts?
Which of the following are Kanban parts?
- Pick parts
- Release order parts
- Crate parts (correct)
- None of the above
Which staging method is defined in the control cycle for advanced integration?
Which staging method is defined in the control cycle for advanced integration?
- Pick parts
- EWM staging (correct)
- Crate parts
- Release order parts
What are the different master data objects that a PSA can be assigned to? (Select all that apply)
What are the different master data objects that a PSA can be assigned to? (Select all that apply)
With delivery-based production integration, which system initiates production consumption?
With delivery-based production integration, which system initiates production consumption?
Cross-order staging components always have a PMR reference.
Cross-order staging components always have a PMR reference.
When supplying storage location and receiving storage locations are connected to different warehouses, an advanced production integration process is used to stage the components.
When supplying storage location and receiving storage locations are connected to different warehouses, an advanced production integration process is used to stage the components.
Which is the correct sequence of delivery type determination?
Which is the correct sequence of delivery type determination?
In a delivery-based production supply process, which document triggers the reversal of consumption in SAP S/4HANA?
In a delivery-based production supply process, which document triggers the reversal of consumption in SAP S/4HANA?
If a component is shared across production orders, what is the optimal staging method to use?
If a component is shared across production orders, what is the optimal staging method to use?
With advanced production integration, how are staging requests communicated to EWM?
With advanced production integration, how are staging requests communicated to EWM?
Without a production order, which of the following parts can be staged?
Without a production order, which of the following parts can be staged?
How is a PSA created in SAP S/4HANA and EWM?
How is a PSA created in SAP S/4HANA and EWM?
Using advanced production integration, Kanban products can be staged.
Using advanced production integration, Kanban products can be staged.
While using delivery-based production integration, which staging methods can be assigned in a control cycle? (Select all that apply)
While using delivery-based production integration, which staging methods can be assigned in a control cycle? (Select all that apply)
When a supplying storage location and receiving storage locations are connected to different warehouses, which documents are created for deliverybased production integration?
When a supplying storage location and receiving storage locations are connected to different warehouses, which documents are created for deliverybased production integration?
To determine how materials are staged from EWM, which object must be defined?
To determine how materials are staged from EWM, which object must be defined?
When supplying and receiving storage locations are connected to the same warehouse, which document is created for material staging with deliverybased production integration?
When supplying and receiving storage locations are connected to the same warehouse, which document is created for material staging with deliverybased production integration?
When a goods receipt is posted for a production order, which document communicates to EWM?
When a goods receipt is posted for a production order, which document communicates to EWM?
When is a PMR closed?
When is a PMR closed?
Which of the following components can be used to map an automated warehouse to the MFS? (Select all that apply)
Which of the following components can be used to map an automated warehouse to the MFS? (Select all that apply)
How are HUs identified automatically in an automated warehouse with the MFS?
How are HUs identified automatically in an automated warehouse with the MFS?
__________ parts are generally staged with full quantities (i.e., full cartons or containers).
__________ parts are generally staged with full quantities (i.e., full cartons or containers).
In advanced production integration, the staging process is initiated directly from ___________.
In advanced production integration, the staging process is initiated directly from ___________.
What document is created in SAP S/4HANA to reverse consumption during delivery-based production?
What document is created in SAP S/4HANA to reverse consumption during delivery-based production?
What is the optimal staging method when components are shared across production orders?
What is the optimal staging method when components are shared across production orders?
Advanced production integration processes are supported only when supplying and receiving storage locations are connected to one EWM warehouse.
Advanced production integration processes are supported only when supplying and receiving storage locations are connected to one EWM warehouse.
What happens when the material master issue storage location is different from the work center’s PSA-assigned storage location?
What happens when the material master issue storage location is different from the work center’s PSA-assigned storage location?
Pick parts and released order parts are defined through controls cycle for advanced production integration.
Pick parts and released order parts are defined through controls cycle for advanced production integration.
Match the production staging methods with their description:
Match the production staging methods with their description:
Which of the following processes support production orders, Kanban, and repetitive manufacturing?
Which of the following processes support production orders, Kanban, and repetitive manufacturing?
Where is relationship maintained between supplying and receiving locations?
Where is relationship maintained between supplying and receiving locations?
A ___________ is created in EWM when staging is triggered from an SAP S/4HANA production order in Advanced Production Integration.
A ___________ is created in EWM when staging is triggered from an SAP S/4HANA production order in Advanced Production Integration.
What are warehouses controlled through in automated facility mapped through?
What are warehouses controlled through in automated facility mapped through?
HUs can be identified automatically using RFID devices in an automated facility.
HUs can be identified automatically using RFID devices in an automated facility.
Flashcards
Supported Production Integration Scenario
Supported Production Integration Scenario
Inventory-managed storage locations support only delivery-based production supply.
Kanban Parts
Kanban Parts
Crate parts are staged with full quantities, like full cartons or containers.
Staging Method for Advanced Integration
Staging Method for Advanced Integration
EWM staging is defined in the control cycle for advanced integration.
Master Data Objects for PSA Assignment
Master Data Objects for PSA Assignment
Signup and view all the flashcards
System Initiating Production Consumption
System Initiating Production Consumption
Signup and view all the flashcards
PMR Reference for Cross-Order Staging
PMR Reference for Cross-Order Staging
Signup and view all the flashcards
Advanced Production Integration Warehouse Connection
Advanced Production Integration Warehouse Connection
Signup and view all the flashcards
Sequence of Delivery Type Determination
Sequence of Delivery Type Determination
Signup and view all the flashcards
Document Triggering Consumption Reversal
Document Triggering Consumption Reversal
Signup and view all the flashcards
Optimal Staging Method for Shared Components
Optimal Staging Method for Shared Components
Signup and view all the flashcards
Communication of Staging Requests to EWM
Communication of Staging Requests to EWM
Signup and view all the flashcards
Parts Staged Without a Production Order
Parts Staged Without a Production Order
Signup and view all the flashcards
PSA Creation in SAP S/4HANA and EWM
PSA Creation in SAP S/4HANA and EWM
Signup and view all the flashcards
Object Determining Material Staging
Object Determining Material Staging
Signup and view all the flashcards
Document created for material staging
Document created for material staging
Signup and view all the flashcards
Document communicates to EWM
Document communicates to EWM
Signup and view all the flashcards
When is a PMR closed?
When is a PMR closed?
Signup and view all the flashcards
Components to Map Warehouse
Components to Map Warehouse
Signup and view all the flashcards
How are HUs Identified
How are HUs Identified
Signup and view all the flashcards
Study Notes
- These notes cover key concepts related to production integration, staging methods, and warehouse management within SAP S/4HANA and EWM.
Production Integration Scenarios
- Inventory-managed storage locations support delivery-based production supply.
- Advanced production integration initiates staging directly from EWM, using the PSA staging definition.
Kanban Parts
- Crate parts are considered Kanban parts; they are staged in full quantities (full cartons or containers) and often based on min/max levels.
Staging Methods
- EWM staging is defined in the control cycle for advanced integration, deriving from EWM master data.
- Control cycles for delivery-based production integration define staging methods like pick parts, release order parts, and crate parts.
- Staging methods are defined through a control cycle establishing relationships between supplying and receiving locations.
Production Supply Area (PSA)
- A PSA can be assigned to the material master, BOM, and work center.
- PSA determination in a production order follows a priority sequence, work center, BOM, then material master.
- PSAs are created manually in both SAP S/4HANA and EWM, then mapped together.
- PSA updates production issue storage locations based on its assignments.
Delivery-Based Production Integration
- SAP S/4HANA initiates production order consumption, triggering an outbound delivery upon confirmation.
- An inbound delivery in SAP S/4HANA triggers the reversal of consumption
- Outbound delivery is created for material staging when supplying and receiving locations are in the same warehouse
- If supplying and receiving locations are in different warehouses, an outbound delivery is created in the supplying warehouse and an inbound delivery in the receiving warehouse,
- Control cycles define the staging of pick parts, released order parts, and crate parts
Cross-Order Staging
- Cross-order staging components do not have a PMR reference, as staging is executed for multiple orders.
- The optimal staging method for components shared across production orders is cross-order staging.
Advanced Production Integration Staging
- Staging requests use a PMR (Production Material Request) to communicate staging requests to EWM.
- PMR lists the receiving product and the components to be staged but doesn't include bulk materials.
- Advanced production integration processes are supported only when supplying and receiving storage locations are connected to one EWM warehouse
Delivery Type Determination
- Delivery type determination sequence: assigned to plant and storage location, assigned to plant, and no plant-specific entry.
Material Staging
- A control cycle must be defined to determine how materials are staged from EWM.
- Without a production order, crate parts can be staged, typically based on manually requests or min/max quantities defined in the respective staging bin.
Production Order Goods Receipt
- A production order goods receipt triggers the creation of an inbound delivery to EWM if the receiving storage location is EWM-managed.
Production Material Request (PMR)
- A PMR is created when a production order is released, and it is closed when the production order is technically completed.
Automated Warehouse and MFS
- Communication points and channels map an automated warehouse to the MFS (Material Flow System).
- HUs (Handling Units) are automatically identified via scanners in an automated warehouse with the MFS.
- Communication points in AS/RS is where EWM and PLC communicate information.
- Communication channel for MFS and PLC defines an IP address and port.
Additional Points
- False. Advanced production integration processes support production orders and process orders. Delivery-based production integration processes support production orders, process orders, Kanban, and repetitive manufacturing.
- A reversal of consumption needs to build stock back
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.