What should a railway servant do upon noticing a danger that could affect train safety?
Under what condition can work that involves danger to trains be commenced without prior permission?
What is a Line Block primarily used for?
What does the term 'Power Block' refer to?
Signup and view all the answers
What is the role of the Inspector of Way or Works in relation to work that may involve danger to trains?
Signup and view all the answers
In what situation is a Gangmate allowed to start work without the inspector's presence?
Signup and view all the answers
What is the primary function of blocking a track?
Signup and view all the answers
What outlines the specific actions and instructions for patrolling the line?
Signup and view all the answers
What must be obtained from the Station Master before placing a motor trolly on any line?
Signup and view all the answers
How should the block section be treated when despatching a motor trolly into a block section with IBS?
Signup and view all the answers
What must the Station Master prepare in duplicate before allowing the motor trolly to enter the block section?
Signup and view all the answers
What visual reminder should be placed on the plunger of the block instruments after the motor trolly departs?
Signup and view all the answers
What action must be taken regarding the block commutator at the receiving station when a motor trolly leaves?
Signup and view all the answers
What is the minimum distance at which the Stop hand signal must be visible to the Loco Pilot of an approaching train in poor visibility conditions?
Signup and view all the answers
What should the Loco Pilot do upon seeing the Stop hand signal shown by the Flagman farthest from the obstruction?
Signup and view all the answers
What signal must the Flagman show after the train has come to a stand and is allowed to proceed?
Signup and view all the answers
What action must the Flagman take after the train has passed, according to the guidelines?
Signup and view all the answers
What is the role of the Flagman at the 30 metres point when it is necessary to stop the approaching train?
Signup and view all the answers
What should the intermediate Flagman do after receiving orders to allow the train to pass over the obstruction?
Signup and view all the answers
What is required when work must be carried out at night?
Signup and view all the answers
What must occur before the train can restart after showing the Stop hand signal?
Signup and view all the answers
What does the 'proceed with caution' hand signal indicate?
Signup and view all the answers
What is the purpose of posting an intermediate Flagman?
Signup and view all the answers
What is the required distance for a stop indicator to be exhibited when the train must stop due to an obstruction lasting more than a day?
Signup and view all the answers
For an obstruction expected to last for more than a day, when is the termination indicator provided?
Signup and view all the answers
When the train is not required to stop and the restriction is likely to last for only a day or less, what signal is shown at 800 metres from the obstruction?
Signup and view all the answers
What must be done if the obstruction is within station limits regarding approach signals?
Signup and view all the answers
What indicator is required at a distance of 30 metres when a train is not required to stop and the obstruction lasts more than a day?
Signup and view all the answers
What additional signal may be required for a distance of 800 metres from the obstruction due to special instructions?
Signup and view all the answers
In case the Loco Pilot has received a Caution Order, when can approach signals be taken off?
Signup and view all the answers
What is the distance from the place of obstruction where the caution indicator needs to be exhibited for a Broad Gauge train?
Signup and view all the answers
What action is taken if the affected line has been isolated within station limits?
Signup and view all the answers
What is the required signal at a distance of 30 metres when the train is required to stop due to an obstruction lasting only a day?
Signup and view all the answers
What should be done if visibility is impaired when a trolly/lorry is to be worked under block protection?
Signup and view all the answers
What is required for a trolly/lorry to be placed on the line at stations with track circuits?
Signup and view all the answers
How frequently should the insulation of a trolly/lorry be tested and certified?
Signup and view all the answers
Who can issue a competency certificate for operating motor trollies?
Signup and view all the answers
Before placing a trolly/lorry on the line, what must the person in charge provide in writing?
Signup and view all the answers
What is the primary purpose of a Competency certificate for motor trolly operators?
Signup and view all the answers
Which categories of staff are permitted to operate motor trollies?
Signup and view all the answers
What must happen after the written test for competency certificates?
Signup and view all the answers
Which of the following is NOT mentioned as a condition for using a motor trolly?
Signup and view all the answers
What is the correct order of actions before a trolly/lorry is placed on the line at a station?
Signup and view all the answers
What is the main responsibility of a railway servant when patrolling the line under abnormal conditions?
Signup and view all the answers
Which type of block allows only material trains and track machines to operate?
Signup and view all the answers
Under what circumstance can a Gangmate initiate work without the prior arrival of an inspector?
Signup and view all the answers
What kind of permission must be obtained before commencing work that may pose danger to trains?
Signup and view all the answers
What is required for the blocking of a section of line for electric traffic, specifically during maintenance work?
Signup and view all the answers
Which rule must be observed when work is initiated by a Gangmate in an emergency situation?
Signup and view all the answers
What ensures that only certain types of trains are allowed on a Line Block?
Signup and view all the answers
What must happen if abnormal conditions such as floods occur concerning track inspection?
Signup and view all the answers
What criteria must be met for the speed limit of goods trains on continuous falling gradients to be set at 30 KMPH?
Signup and view all the answers
Under what condition can the termination indicator for goods trains be placed at a different distance from the usual requirement?
Signup and view all the answers
Which of the following describes the appearance of the Stop Indicator?
Signup and view all the answers
What is the key feature of speed indicator boards for temporary restrictions?
Signup and view all the answers
What additional visual element should be included with the caution and speed indicator boards?
Signup and view all the answers
What should be ignored when calculating continuous falling gradients?
Signup and view all the answers
What is the purpose of the termination indicators for both passenger and goods trains?
Signup and view all the answers
What is the defining characteristic of the caution and speed indicator boards in the specified diagrams?
Signup and view all the answers
How wide is the Stop Indicator board as specified?
Signup and view all the answers
When should the speed indicators be utilized during train operations?
Signup and view all the answers
What is the protocol for the Station Master when a motor trolly is to be dispatched into a block section?
Signup and view all the answers
What should be done with the block commutator at the station when the motor trolly is dispatched?
Signup and view all the answers
Upon arrival of the motor trolly at the receiving station, what documentation must be delivered to the Station Master?
Signup and view all the answers
What action should the Station Masters take after the motor trolly departs the station?
Signup and view all the answers
What must be specified in the 'Safety Certificate' submitted to the Station Master before resuming normal traffic?
Signup and view all the answers
What is required when a motor trolly is entering a block section with IBS?
Signup and view all the answers
What precaution must be taken before commencing operations that obstruct the line?
Signup and view all the answers
What should Station Masters at both ends do before resuming normal operations after a block?
Signup and view all the answers
In adverse weather conditions impairing visibility, what can be done regarding rail displacement?
Signup and view all the answers
What should be done with Stop signals before conducting obstructive work within station limits?
Signup and view all the answers
What must be done before the Line Blocked collars can be removed to resume normal working?
Signup and view all the answers
Who is responsible for ensuring that stop signals are displayed before operations that obstruct the line?
Signup and view all the answers
What must be done at the approach to work controlled by automatic signals?
Signup and view all the answers
What is required to ensure the safety of operations on the line during periods of visibility impairment?
Signup and view all the answers
What is the prerequisite for exhibiting a Stop signal before any work that obstructs the line?
Signup and view all the answers
What should be done with a trolly/lorry when visibility is impaired due to adverse weather conditions?
Signup and view all the answers
What action must the person in charge of a trolly/lorry take before placing it on the line at a station with track circuits?
Signup and view all the answers
How frequently must the insulation of a trolly/lorry be tested and certified?
Signup and view all the answers
Which of the following categories of staff is NOT permitted to operate motor trollies?
Signup and view all the answers
What is required for the issuance of a competency certificate for operating motor trollies?
Signup and view all the answers
Who can issue a competency certificate to Group ‘C’ staff of the division for operating motor trollies?
Signup and view all the answers
What should be done after the staff or officer passes the written test for a competency certificate?
Signup and view all the answers
In what scenario can a trolly/lorry enter a line within station limits?
Signup and view all the answers
Which officials are legally allowed to operate motor trollies?
Signup and view all the answers
What is the special requirement for running a motor trolly?
Signup and view all the answers
Study Notes
Patrolling of Lines
- Railway lines are patrolled to ensure their safety in case of unforeseen circumstances like heavy rains, breaches, floods, storms, or civil unrest.
- Railway servants are tasked with patrolling the lines and any potential hazards must be reported immediately to the Station Master.
Work Involving Danger to Trains
- Any work that could endanger trains or traffic requires prior authorization by the Inspector of Way or Works.
- The authorized railway servant must be present to supervise the work and ensure safety rules are followed.
- In emergencies, work can commence before the authorized servant arrives, but the Gangmate must ensure safety rules are observed.
Line Blocks
- Line blocks are implemented for engineering purposes, restricting traffic to material trains and track machines.
- Power blocks restrict electric traffic but allow diesel traffic, primarily for OHE maintenance.
Train Restriction Indicators
- When a train is required to stop for more than a day due to obstruction: a stop indicator is placed 30 meters from the obstruction, a caution indicator is placed 1200 meters (Broad Gauge) or 800 meters (Metre & Narrow Gauge) from the obstruction, and termination indicators are placed where the Loco Pilot can resume normal speed.
Speed Indicators
- When a train is not required to stop and the restriction is less than a day: proceed with caution hand signals are displayed 30 meters and 800 meters from the obstruction. This distance can be increased by special instruction.
Obstruction Within Station Limits
- Obstructions within station limits can utilize alternative safety measures:
- Isolating the affected line by securing manual Stop signals or points.
- Approach signals for trains are not activated until the train has stopped at the first Stop signal, unless a Caution Order has been issued to the Loco Pilot informing them about the obstruction.
Flagman Signaling
- Flagmen are deployed to warn approaching trains about obstructions and ensure safe passage.
- Flagmen may increase the distance of warning signals in areas with poor visibility, curves, or gradients.
- The Loco Pilot is required to stop their train upon seeing the Stop hand signal furthest from the obstruction.
- The Flagman will then remove detonators and signal the train to proceed with caution.
- The Loco Pilot must be prepared to stop short of the banner flag.
- If the obstruction requires the train to stop, the Flagman at the 30-meter point will signal the train to stop and the intermediate Flagman will remove the banner flag once the train has been authorized to proceed at reduced speed.
Trolly/Lorry Operations under Block Protection
- Trolly/lorries must be removed from the track if visibility is impaired due to weather or other causes.
- Non-insulated trollies/lorries cannot be placed on lines within station limits where track circuits are present.
- Trolly/lorries must be certified as insulated by an S&T Inspector every six months.
- The Station Master must receive a written confirmation that the Trolly/Lorry is insulated before permitting it on the line.
Motor Trolly Operations
- Motor trollies can only be operated in accordance with special instructions.
- Only certified personnel from various departments are authorized to operate motor trollies:
- Group ‘C’ staff: DSO
- Divisional Officers: DRM
- Headquarters Officers (excluding heads of department): CSO
- Only personnel who pass a written test on motor trolley rules and relevant safety regulations are issued a Competency certificate.
- Motor trollies require permission from the Station Master in writing before being placed on the line.
Motor Trolly Operations under Tokenless Block Instruments
- When a motor trolley enters a double or single line section with tokenless block instruments, the Station Master of the departure station must obtain Line Clear from the Station Master at the other end of the block section.
- When a motor trolley is to be despatched into a block section provided with IBS, the block section between the two block stations shall be treated as one block section, till the motor trolley clears into the block station in advance.
- The Station Master prepares an authority to enter the block section in duplicate, which includes authorization to proceed and authorization to pass LSS and IBS.
- When the motor trolley leaves the station, the relevant free starter signal is taken ‘off’, and the Station Masters at both ends of the block section place the ‘trolly on line' cap on the plunger of the block instruments.
- The Station Master at the departure station advises the Station Master at the arrival station to turn the block commutator to TOL and lock it. The TOL red indication acts as an extra visual warning.
- The Station Master at the receiving station sets the reception signals to ‘off’.
- Upon arrival at the station, the motor trolly official delivers the authority to the Station Master with an endorsement confirming the arrival time and date.
Patrolling of Lines
- Special instructions are required for patrolling lines when conditions like heavy rains, breaches, floods, storms, and civil disturbances threaten the railway’s safety.
- Railway employees patrolling the line must take action as per the special instructions if they find conditions compromising train safety.
- After taking action, the employee should inform the nearest Station Master immediately.
Work Involving Danger to Trains
- Gangs (groups of workers) cannot begin work that endangers trains or traffic without permission from the Inspector of Way or Works, or a designated railway official.
- The official granting permission must be present to supervise the work and ensure that safety rules are followed.
- In emergencies, the gangmate may initiate the work immediately, but must still follow safety regulations.
Types of Blocks
- Line Block: A section under Line Block is off-limits to general traffic, only material trains and track machines are allowed.
- Power Block: This block is used for OHE maintenance and blocks electric traffic. Diesel traffic may still be allowed.
Working Under Block Protection
- A ‘Safety Certificate’ must be provided to the Station Master by the officials who performed work under a block.
- This certificate ensures the safety of the block section and states any necessary speed restrictions.
- The Station Master at both ends of the block must check the TSR entries to confirm the line is clear of all units before resuming normal traffic.
Speed Restrictions
- Speed indicators are used for permanent and temporary speed restrictions with temporary restrictions requiring illumination at night.
- Temporary restrictions are highlighted with a “goods trains only” sign on the Caution Indicator and Speed Indicator.
- On continuous falling gradients, the maximum speed for goods trains is 30 KMPH.
Indicators
- Stop Indicator: This indicator is used to signal trains to stop and is painted with red and white stripes.
- Termination Indicator: This indicator informs trains upon which point they can resume regular speed. There are two types: T/P for passenger trains and T/G for goods trains.
- Speed Indicator: This indicator informs trains about the speed restriction in the block area and is illuminated at night.
Motor Trolly
- Motor trollies can only be operated with special instructions.
- Only authorized officials with a competency certificate can operate motor trollies.
- Before operating motor trollies, officials must undergo a written test covering related rules.
- Obtaining Station Master’s written permission is mandatory before placing a motor trolley on the line.
Motor Trolley Operations Under Block Protection
- When operating on double or single line sections with tokenless block instruments, the Station Master must obtain Line Clear from the other end of the block section.
- Each motor trolley entering a block section must be documented and a tracking authority (T/A1525) must be provided to the person in charge.
- Station Masters at both ends of the block section must place the ‘trolly on line’ cap as a visual reminder.
- Upon arrival at the station, the official in charge must deliver the authority to the Station Master.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
Test your knowledge on the safety protocols for patrolling railway lines and the procedures involved in dangerous work situations. Learn about line blocks, emergency protocols, and train restriction indicators to ensure safe railway operations.