What type of maintenance can be performed on a lever frame without physical electrical disconnection?
What type of maintenance can be performed on a lever frame without physical electrical disconnection?
Which of the following is NOT a duty of signal supervisors?
Which of the following is NOT a duty of signal supervisors?
What can be replaced by technical staff in case of traffic permits?
What can be replaced by technical staff in case of traffic permits?
What is the primary purpose of covering lenses in signal maintenance?
What is the primary purpose of covering lenses in signal maintenance?
Signup and view all the answers
Which of the following is a type of maintenance that requires physical electrical disconnection?
Which of the following is a type of maintenance that requires physical electrical disconnection?
Signup and view all the answers
What is the primary purpose of testing track circuit parameters?
What is the primary purpose of testing track circuit parameters?
Signup and view all the answers
What type of maintenance can be performed on point machines without opening covers?
What type of maintenance can be performed on point machines without opening covers?
Signup and view all the answers
Which of the following is a duty of technical staff in telecommunication equipment testing?
Which of the following is a duty of technical staff in telecommunication equipment testing?
Signup and view all the answers
What is the primary purpose of a Signal Supervision Engineer (SSE) possessing Signaling Interlocking Plans during an inspection?
What is the primary purpose of a Signal Supervision Engineer (SSE) possessing Signaling Interlocking Plans during an inspection?
Signup and view all the answers
Which of the following is NOT typically carried by an SSE during an inspection?
Which of the following is NOT typically carried by an SSE during an inspection?
Signup and view all the answers
What is the primary function of a Cable Fault Locator?
What is the primary function of a Cable Fault Locator?
Signup and view all the answers
What is the purpose of an SSE possessing Interface Circuits during an inspection?
What is the purpose of an SSE possessing Interface Circuits during an inspection?
Signup and view all the answers
Which of the following is a type of equipment used for testing signaling gears?
Which of the following is a type of equipment used for testing signaling gears?
Signup and view all the answers
What is the purpose of an SSE possessing Location box details during an inspection?
What is the purpose of an SSE possessing Location box details during an inspection?
Signup and view all the answers
Who can specify additional items to be carried by an SSE during an inspection?
Who can specify additional items to be carried by an SSE during an inspection?
Signup and view all the answers
What is the purpose of an SSE possessing Various registers at the station during an inspection?
What is the purpose of an SSE possessing Various registers at the station during an inspection?
Signup and view all the answers
What is the frequency of report submission by a Technician (Signal) to their Sectional SSE/JE (Signal)?
What is the frequency of report submission by a Technician (Signal) to their Sectional SSE/JE (Signal)?
Signup and view all the answers
What is required for a Technician (Signal) to independently undertake works necessitating issues of Disconnection Notices?
What is required for a Technician (Signal) to independently undertake works necessitating issues of Disconnection Notices?
Signup and view all the answers
When is a Disconnection Notice not required?
When is a Disconnection Notice not required?
Signup and view all the answers
What should be kept in the 'ON' position and made in-operative when disconnecting point equipment switches or signals for repairs?
What should be kept in the 'ON' position and made in-operative when disconnecting point equipment switches or signals for repairs?
Signup and view all the answers
What is the technician responsible for sealing after opening it for maintenance?
What is the technician responsible for sealing after opening it for maintenance?
Signup and view all the answers
What is a Technician (Signal) required to maintain and test?
What is a Technician (Signal) required to maintain and test?
Signup and view all the answers
What is the purpose of a Technician (Signal) obtaining the signature of the Station Master?
What is the purpose of a Technician (Signal) obtaining the signature of the Station Master?
Signup and view all the answers
What type of equipment does a Technician (Signal) need a valid Competency Certificate to handle?
What type of equipment does a Technician (Signal) need a valid Competency Certificate to handle?
Signup and view all the answers
What is the maximum time interval between inspections and testing of equipments by the Sectional SSE/JE (Signal)?
What is the maximum time interval between inspections and testing of equipments by the Sectional SSE/JE (Signal)?
Signup and view all the answers
Who should the Sectional SSE/JE (Signal) take with him/her during inspections whenever possible?
Who should the Sectional SSE/JE (Signal) take with him/her during inspections whenever possible?
Signup and view all the answers
What is the purpose of the inspection carried out by the Sectional SSE/JE (Signal)?
What is the purpose of the inspection carried out by the Sectional SSE/JE (Signal)?
Signup and view all the answers
What should be done to any fault detected during inspection?
What should be done to any fault detected during inspection?
Signup and view all the answers
What should be inspected to ensure they are up-to-date?
What should be inspected to ensure they are up-to-date?
Signup and view all the answers
Where should a record of the inspection be made?
Where should a record of the inspection be made?
Signup and view all the answers
What is the purpose of taking disconnection from ASM on duty?
What is the purpose of taking disconnection from ASM on duty?
Signup and view all the answers
What should be paid special attention to during inspections?
What should be paid special attention to during inspections?
Signup and view all the answers
How often should SSE(Signal)/Incharge submit an Inspection and Testing Certificate?
How often should SSE(Signal)/Incharge submit an Inspection and Testing Certificate?
Signup and view all the answers
What is the primary purpose of the Certificate of Inspection and Testing?
What is the primary purpose of the Certificate of Inspection and Testing?
Signup and view all the answers
Who should jointly inspect signals on each section?
Who should jointly inspect signals on each section?
Signup and view all the answers
When should SSE(Signal)/Incharge certify that signals on their section have proper visibility?
When should SSE(Signal)/Incharge certify that signals on their section have proper visibility?
Signup and view all the answers
What should SSE(Signal)/Incharge highlight in their quarterly certificate?
What should SSE(Signal)/Incharge highlight in their quarterly certificate?
Signup and view all the answers
When should inspections, testing, and overhauling certificates be filled in?
When should inspections, testing, and overhauling certificates be filled in?
Signup and view all the answers
Who should submit the report on each foot-plate inspection?
Who should submit the report on each foot-plate inspection?
Signup and view all the answers
What is the purpose of submitting certificates to Sr.DSTE?
What is the purpose of submitting certificates to Sr.DSTE?
Signup and view all the answers
What documents should an SSE(Signal) possess in addition to the books mentioned in para 3.5.2(a) during an inspection?
What documents should an SSE(Signal) possess in addition to the books mentioned in para 3.5.2(a) during an inspection?
Signup and view all the answers
What is the purpose of an SSE(Signal) possessing Traction Bonding Diagram during an inspection?
What is the purpose of an SSE(Signal) possessing Traction Bonding Diagram during an inspection?
Signup and view all the answers
Which of the following equipment is not required to test signaling gears during an inspection?
Which of the following equipment is not required to test signaling gears during an inspection?
Signup and view all the answers
What can specify additional items to be carried by an SSE(Signal) during an inspection?
What can specify additional items to be carried by an SSE(Signal) during an inspection?
Signup and view all the answers
What is the purpose of an SSE(Signal) possessing Various registers at the station during an inspection?
What is the purpose of an SSE(Signal) possessing Various registers at the station during an inspection?
Signup and view all the answers
Why does an SSE(Signal) need to possess OEM check lists of Signalling equipments during an inspection?
Why does an SSE(Signal) need to possess OEM check lists of Signalling equipments during an inspection?
Signup and view all the answers
What is the purpose of an SSE(Signal) possessing Track circuit bonding plan during an inspection?
What is the purpose of an SSE(Signal) possessing Track circuit bonding plan during an inspection?
Signup and view all the answers
What is the purpose of an SSE(Signal) possessing Interface Circuits during an inspection?
What is the purpose of an SSE(Signal) possessing Interface Circuits during an inspection?
Signup and view all the answers
What should a Technician (Signal) do before starting maintenance at a station?
What should a Technician (Signal) do before starting maintenance at a station?
Signup and view all the answers
What should a Technician (Signal) do if he notices an unsafe failure?
What should a Technician (Signal) do if he notices an unsafe failure?
Signup and view all the answers
What should a Technician (Signal) ensure before restoring normal working?
What should a Technician (Signal) ensure before restoring normal working?
Signup and view all the answers
What should a Technician (Signal) maintain according to the program laid down by his SSE/JE (Signal)?
What should a Technician (Signal) maintain according to the program laid down by his SSE/JE (Signal)?
Signup and view all the answers
What should a Technician (Signal) obtain before leaving any gear in a disconnected condition?
What should a Technician (Signal) obtain before leaving any gear in a disconnected condition?
Signup and view all the answers
What should a Technician (Signal) attend to promptly?
What should a Technician (Signal) attend to promptly?
Signup and view all the answers
What should a Technician (Signal) deploy as and when necessary?
What should a Technician (Signal) deploy as and when necessary?
Signup and view all the answers
What should a Technician (Signal) ensure before disconnecting or altering any connection in the interlocking circuits?
What should a Technician (Signal) ensure before disconnecting or altering any connection in the interlocking circuits?
Signup and view all the answers
What should be briefly contained in the handing over charge statement while relinquishing charge of a section?
What should be briefly contained in the handing over charge statement while relinquishing charge of a section?
Signup and view all the answers
What is the purpose of jointly signing the handing over charge statement?
What is the purpose of jointly signing the handing over charge statement?
Signup and view all the answers
What should the relieving SSE(Signal)/Incharge examine during the handing over process?
What should the relieving SSE(Signal)/Incharge examine during the handing over process?
Signup and view all the answers
What should be recorded in the handing over charge statement?
What should be recorded in the handing over charge statement?
Signup and view all the answers
What should be submitted to the Sr.Divisional Signal and Telecommunication Engineer?
What should be submitted to the Sr.Divisional Signal and Telecommunication Engineer?
Signup and view all the answers
What is the purpose of the handing over charge statement?
What is the purpose of the handing over charge statement?
Signup and view all the answers
What should be checked during the handing over process?
What should be checked during the handing over process?
Signup and view all the answers
What is the purpose of the relieving SSE(Signal)/Incharge initialing the office records and ledgers?
What is the purpose of the relieving SSE(Signal)/Incharge initialing the office records and ledgers?
Signup and view all the answers
What is the primary responsibility of a Helper in relation to testing and maintenance?
What is the primary responsibility of a Helper in relation to testing and maintenance?
Signup and view all the answers
What is the purpose of Annexure 3-A2?
What is the purpose of Annexure 3-A2?
Signup and view all the answers
What is the primary responsibility of a Technician (Signal) in relation to documentation?
What is the primary responsibility of a Technician (Signal) in relation to documentation?
Signup and view all the answers
What is the purpose of Annexure 3-A4?
What is the purpose of Annexure 3-A4?
Signup and view all the answers
Who is responsible for accompanying the Technician/SSE/JE during their day-to-day work?
Who is responsible for accompanying the Technician/SSE/JE during their day-to-day work?
Signup and view all the answers
What is the primary purpose of Annexure 3-A7?
What is the primary purpose of Annexure 3-A7?
Signup and view all the answers
What is the primary responsibility of a Technician (Signal) in relation to testing and maintenance?
What is the primary responsibility of a Technician (Signal) in relation to testing and maintenance?
Signup and view all the answers
What is the purpose of Annexure 3-A12?
What is the purpose of Annexure 3-A12?
Signup and view all the answers
What can be caused by a flat tyre?
What can be caused by a flat tyre?
Signup and view all the answers
What is the rejection limit in depth of flange for BG?
What is the rejection limit in depth of flange for BG?
Signup and view all the answers
What can be formed due to excessively worn-out tyres on tread?
What can be formed due to excessively worn-out tyres on tread?
Signup and view all the answers
What may happen if the hollowness of a tyre is more?
What may happen if the hollowness of a tyre is more?
Signup and view all the answers
Where can a false flange ride over, creating conditions favourable to derailment?
Where can a false flange ride over, creating conditions favourable to derailment?
Signup and view all the answers
What can a deep flange tend to ride on?
What can a deep flange tend to ride on?
Signup and view all the answers
What can cause hammering action on the rail?
What can cause hammering action on the rail?
Signup and view all the answers
What may take place due to a flat tyre?
What may take place due to a flat tyre?
Signup and view all the answers
What should the SSE(Signal)/Incharge of works submit every month to the Dy.CSTE (Construction)?
What should the SSE(Signal)/Incharge of works submit every month to the Dy.CSTE (Construction)?
Signup and view all the answers
What should the SSE(Signal)/Incharge ensure before commissioning/opening of a new work or alteration to an existing work?
What should the SSE(Signal)/Incharge ensure before commissioning/opening of a new work or alteration to an existing work?
Signup and view all the answers
What should the SSE(Signal)/Incharge submit to the Sr.DSTE/Dy.CSTE (Construction) immediately after a new work/alteration has been brought into service?
What should the SSE(Signal)/Incharge submit to the Sr.DSTE/Dy.CSTE (Construction) immediately after a new work/alteration has been brought into service?
Signup and view all the answers
What should the SSE(Signal)/Incharge advise the Sr.DSTE/Dy.CSTE (Construction) about?
What should the SSE(Signal)/Incharge advise the Sr.DSTE/Dy.CSTE (Construction) about?
Signup and view all the answers
What should the SSE(Signal)/Incharge correct and endorse in case of minor alterations?
What should the SSE(Signal)/Incharge correct and endorse in case of minor alterations?
Signup and view all the answers
Who should arrange for fixing a date and issue necessary notices when a work is ready for opening?
Who should arrange for fixing a date and issue necessary notices when a work is ready for opening?
Signup and view all the answers
What should the SSE(Signal)/Incharge submit to the Dy.CSTE (Construction) as per Annexure: 3-A7?
What should the SSE(Signal)/Incharge submit to the Dy.CSTE (Construction) as per Annexure: 3-A7?
Signup and view all the answers
When should the SSE(Signal)/Incharge submit a Completion Certificate to the Sr.DSTE/Dy.CSTE (Construction)?
When should the SSE(Signal)/Incharge submit a Completion Certificate to the Sr.DSTE/Dy.CSTE (Construction)?
Signup and view all the answers
What does a Technician (Signal) need to submit to his Sectional SSE/JE (Signal)?
What does a Technician (Signal) need to submit to his Sectional SSE/JE (Signal)?
Signup and view all the answers
What is necessary for a Technician (Signal) to undertake works necessitating Disconnection Notices?
What is necessary for a Technician (Signal) to undertake works necessitating Disconnection Notices?
Signup and view all the answers
What should Warner/Distant and Stop Signals be kept in when disconnecting point equipment switches or signals for repairs?
What should Warner/Distant and Stop Signals be kept in when disconnecting point equipment switches or signals for repairs?
Signup and view all the answers
What must a Technician (Signal) possess to handle certain signaling equipments?
What must a Technician (Signal) possess to handle certain signaling equipments?
Signup and view all the answers
What should a Technician (Signal) advise the Station Master about in writing?
What should a Technician (Signal) advise the Station Master about in writing?
Signup and view all the answers
What must be sealed by a Technician (Signal) after opening it for maintenance?
What must be sealed by a Technician (Signal) after opening it for maintenance?
Signup and view all the answers
What is the purpose of a Technician (Signal) obtaining the signature of the Station Master?
What is the purpose of a Technician (Signal) obtaining the signature of the Station Master?
Signup and view all the answers
What must a Technician (Signal) take before leaving his Headquartered Station?
What must a Technician (Signal) take before leaving his Headquartered Station?
Signup and view all the answers
What is the primary cause of 'Breakage of part'?
What is the primary cause of 'Breakage of part'?
Signup and view all the answers
Which of the following is not a type of Track Circuit Failure?
Which of the following is not a type of Track Circuit Failure?
Signup and view all the answers
What is the primary cause of 'Interlocking'?
What is the primary cause of 'Interlocking'?
Signup and view all the answers
What is the primary cause of 'Lifting Barrier'?
What is the primary cause of 'Lifting Barrier'?
Signup and view all the answers
What is the primary cause of 'Miscellaneous'?
What is the primary cause of 'Miscellaneous'?
Signup and view all the answers
What is the primary cause of 'Block Instrument Failure'?
What is the primary cause of 'Block Instrument Failure'?
Signup and view all the answers
What is the primary cause of 'TCAS'?
What is the primary cause of 'TCAS'?
Signup and view all the answers
What is the primary cause of 'Staff working'?
What is the primary cause of 'Staff working'?
Signup and view all the answers
What should a Technician (Signal) obtain from the SSE/JE (Signal) when necessary for maintenance and repair work?
What should a Technician (Signal) obtain from the SSE/JE (Signal) when necessary for maintenance and repair work?
Signup and view all the answers
What should a Technician (Signal) always take with him when on duty?
What should a Technician (Signal) always take with him when on duty?
Signup and view all the answers
What is the duty of Helpers/Assistants in terms of cleaning?
What is the duty of Helpers/Assistants in terms of cleaning?
Signup and view all the answers
What should a Technician (Signal) report to his supervisor?
What should a Technician (Signal) report to his supervisor?
Signup and view all the answers
What should a Technician (Signal) do with released materials?
What should a Technician (Signal) do with released materials?
Signup and view all the answers
What should Helpers/Assistants maintain with them for day-to-day work?
What should Helpers/Assistants maintain with them for day-to-day work?
Signup and view all the answers
What is the duty of Helpers/Assistants in terms of loading/unloading of materials?
What is the duty of Helpers/Assistants in terms of loading/unloading of materials?
Signup and view all the answers
What should Helpers/Assistants report to their supervisor?
What should Helpers/Assistants report to their supervisor?
Signup and view all the answers
What is the primary purpose of Cause Wise Analysis of Signal Incidences?
What is the primary purpose of Cause Wise Analysis of Signal Incidences?
Signup and view all the answers
Which of the following is a type of equipment failure that can cause signal incidents?
Which of the following is a type of equipment failure that can cause signal incidents?
Signup and view all the answers
What is the primary cause of signal incidents related to S&T Account (A)?
What is the primary cause of signal incidents related to S&T Account (A)?
Signup and view all the answers
Which of the following is a type of maintenance that can help prevent signal incidents?
Which of the following is a type of maintenance that can help prevent signal incidents?
Signup and view all the answers
What is the primary purpose of identifying the position of signal incidents?
What is the primary purpose of identifying the position of signal incidents?
Signup and view all the answers
Which of the following is a type of signal incident that can be caused by bad maintenance?
Which of the following is a type of signal incident that can be caused by bad maintenance?
Signup and view all the answers
What is the primary purpose of analyzing the cumulative frequency of signal incidents?
What is the primary purpose of analyzing the cumulative frequency of signal incidents?
Signup and view all the answers
Which of the following is a type of equipment that can be used to test signal circuits?
Which of the following is a type of equipment that can be used to test signal circuits?
Signup and view all the answers
Study Notes
Maintenance and Inspection
- Cleaning and lubricating without affecting physical electrical disconnection:
- Lever frame basement
- Relay Room & Battery Room
- Apparatus case/battery boxes/Goomty
- Lifting barrier mechanism including winch
- Lever lock and circuit controller without opening cover
- Inspection and cleaning of inside equipment by opening covers of point machines, signal motors, reversers, apparatus cases, and detectors
- Point, facing point lock, and lock bar
- Cranks, compensators, pullies, wheels, roller stands, counterweights, and levers
- Power supply equipment
- Insulation joints
- Lens/roundels of signal, point indicator, trap indicator, and shunt permitting indicator
Testing
- Testing of:
- Track locking, approach locking, back locking, indication locking, and route release
- Various parameters of axle counter without disconnecting equipment
- Power supply equipment
- Lever frame, SM's control frame, signal operation, point operation, level crossing gate, and slot circuits
- Point by obstruction test for lock only
- Track circuit parameters when the track is unoccupied
- Focusing of color light signal
Adjustment
- Adjustment of:
- Wire transmission (except double wire operated point transmission)
- Tightening of terminals using insulated tools without causing shorts on adjacent terminals
Replacement
- Replacement of:
- Electric signal lamp
- Bond wire (one at a time)
- Plug-in relay (if traffic conditions permit)
- Indicator lamps
- Push button/switch/key of panel
Duties of Technicians and Signal Supervisors
- Each Technician (Signal) shall:
- Maintain and test equipment under their charge as per maintenance schedule
- Submit fortnightly report of maintenance activities to Sectional SSE/JE (Signal)
- Possess a book of Disconnection Notices
- Possess a valid Competency Certificate for handling Signaling equipments
- Seal equipment opened by them under their competence
Inspection and Testing Certificates
- Each SSE(Signal)/Incharge shall submit an Inspection and Testing Certificate monthly for each station/installation inspected
- The Certificate shall indicate the condition of gear inspected and brief remarks on assistance required
Accompanying Important Inspections
- Each SSE(Signal) accompanying an inspection must have certain items in their possession, including signaling interlocking plans, yard diagrams, and cable route plans.
- They must also have interface circuits, application logic circuits, and track circuit bonding plans.
- Other required items include location box details, wire diagrams, and OEM checklists for signaling equipment.
- The SSE(Signal) must also have various registers, such as an asset register, battery checking register, and signal incidence register.
Inspections and Testing
- The SSE(Signal) is responsible for inspecting and testing signaling equipment, including interlocking frames, block instruments, and point machines.
- They must also inspect and test relays, and perform general notes regarding painting, renewals, and replacements.
Relinquishment of Charge
- When relinquishing charge of a section, the SSE(Signal) must prepare a handing-over charge statement that includes section particulars, details of sanctioned and proposed works, and general notes.
- The statement must also include information about materials, stores, and important documents, as well as the status of scheduled inspections and officer inspections.
Duties of Signal Supervisors and Technical Staff
- The SSE(Signal) is responsible for maintaining a record of visit reports, and must adhere to the program laid down by their supervisor.
- The Technician(Signal) must attend to signal failures promptly, and ensure that normal working is not restored until the failure has been attended to, tested, and certified by the SSE(JE).
- The Technician(Signal) is also responsible for assisting the supervisor during testing, maintenance, and inspections, and for carrying tools and plants for maintenance and failures.
Helper's Duties
- The Helper's technical duties include removing obstructions to points, removing excess bars from insulation joints, and checking RE bonds and their intactness.
- The Helper must also check for water logging in track-circuited areas, and assist the technician during testing, maintenance, and inspections.
Annexures
- There are 13 annexures to this chapter, including a signal visibility certificate, footplate inspection of signals, and an SSE(JE)'s progress report.
- Other annexures include a list of drawings and registers at a station, a cause-wise analysis of signal incidents, and a technician's report.
Progress Report of Works
- The SSE(Signal)/Incharge of works shall submit a Progress Report every month to the Dy.CSTE (Construction) as per Annexure: 3-A7.
- The report shall include:
- Progress of work and probable date of completion
- Reference to requisitions or work orders against which supply has not been made; also details of items which are particularly required and on account of which works are being delayed
- Delays arising from other causes
Opening of Works
- The SSE(Signal)/Incharge of works shall advise the Sr.DSTE/Dy.CSTE (Construction) when a work will be ready for opening.
- The approved plans, Control Table, circuit diagrams, CRS/PCSTE sanctions, required approvals, OEM test certificates of equipments, FAT/SAT Testing reports etc. shall be available before commissioning /opening.
Completion Certificate and Completion Report
- The SSE(Signal)/Incharge shall submit a Completion Certificate to the Sr.DSTE/Dy.CSTE (Construction) as per Annexure: 3-A8 immediately after a new work/alteration to an existing installation has been brought into service.
- Each Technician(Signal) shall maintain and test all the equipments under his charge, as per maintenance schedule specified for various gears.
- Each Technician(Signal) shall submit a fortnightly report of his maintenance activities to his Sectional SSE/JE (Signal).
Disconnection of Equipment
- Each Technician(Signal) shall have in his possession a book of Disconnection Notices as per Annexure: 3-A10.
- A Technician (Signal) who is in possession of a Competency Certificate cum Training History book (Annexure: 3-A12) only shall independently undertake works necessitating issues of Disconnection Notices.
- Disconnection Notices need not be issued in situations as listed in Annexure: 3-A11 provided suitable precautions are taken.
Duties of Technician (Signal)
- A Technician (Signal) shall possess valid Competency Certificate for handling Signalling equipments like Block instruments, EI, MSDAC etc.
- A Technician (Signal) shall, where necessary, get his requirements of materials for maintenance and repair work from the SSE/JE (Signal), giving full particulars of station, location and the gears to be replaced.
- Released materials shall be returned to the SSE/JE(Signal) immediately.
- A Technician (Signal) shall always take his tools with him when on duty.
- All tools shall be kept in a condition fit for immediate use.
Co-operation between Technicians
- Technician (Signal) shall co-operate in testing of all the signals.
- Technician (Signal) shall extend full co-operation to each other in their day-to-day work.
Duties of Helpers/Assistants
- The general duties of Helpers/Assistants are as follows:
- Cleaning of Glued Joints/Block joints
- Cleaning of all S&T gears and their up keeping
- Painting of all S&T gears and their up keeping
- Cleaning of garbage/vegetation under Point rodding and surrounding of all signaling gears/locations
- Cleaning of chair plates and maintaining their lubrication
- Reporting of any infringement of signal/Ladder etc.
- Upkeep of Relay room, Power room, Battery room, Maintenance room, Store room etc.
- Maintaining minimum essential tools with him for day to day works as per instructions of Technician/SSE/JE(Signal)
- Loading/unloading/Handling of T&P items and all materials as per instructions of Supervisor
- Manning and protection of installations/S&T gears on need basis as guided by Supervisor
- Reporting of rubbing of stretcher bar with Stock Rail bottom (if any)
Cause Wise Analysis of Signal Incidences
- The analysis includes causes such as:
- S&T Account (A) including equipment failure, lamp fusing, cable, relay failure, point M/c, fuse blown off, bad maintenance, track circuit failure, block instrument failure, interlocking, lifting barrier, miscellaneous, and TCAS (Train Collision Avoidance System)
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
This quiz covers the procedures for cleaning and lubricating railway equipment without disconnecting electrical systems, including maintenance of lever frames, relay rooms, and point machines.