What does NOCT stand for in the context of solar panels?
What does NOCT stand for in the context of solar panels?
- National Organic Cell Tracking
- New Optimal Cooling Technology
- Normal Operating Cell Temperature (correct)
- Nominal Output Control Technique
Under what conditions is NOCT testing conducted for solar panels?
Under what conditions is NOCT testing conducted for solar panels?
- 1000 W/m² irradiance, 25°C ambient temperature, and no wind
- 600 W/m² irradiance, 15°C ambient temperature, and 5m/s wind speed
- 400 W/m² irradiance, 30°C ambient temperature, and 2m/s wind speed
- 800 W/m² irradiance, 20°C ambient temperature, and 1m/s wind speed (correct)
What is the capacity of the SMA-STP 60-01 inverter model used in the plant?
What is the capacity of the SMA-STP 60-01 inverter model used in the plant?
- 60kWac (correct)
- 70kWac
- 80kWac
- 50kWac
How many PV modules are used in the plant?
How many PV modules are used in the plant?
What does STC stand for in relation to solar panels?
What does STC stand for in relation to solar panels?
What is the tilt angle at which the PV module is placed for NOCT testing?
What is the tilt angle at which the PV module is placed for NOCT testing?
What is the total capacity of the PV plant (Group A + Group B) mentioned in the text?
What is the total capacity of the PV plant (Group A + Group B) mentioned in the text?
How many inverters are grouped with a total capacity of 0.96 MW in the text?
How many inverters are grouped with a total capacity of 0.96 MW in the text?
What is the voltage level of Cable-TR14 mentioned in the text?
What is the voltage level of Cable-TR14 mentioned in the text?
How many Cable-TR instances are mentioned in the text?
How many Cable-TR instances are mentioned in the text?
What is the total capacity of inverters grouped with TR-03 and TR-06?
What is the total capacity of inverters grouped with TR-03 and TR-06?
Which Cable-TR has the longest length mentioned in the text?
Which Cable-TR has the longest length mentioned in the text?
What does 'TR-02 1.5 MVA LV-07 0.4kV 0.015 km' refer to in the load flow analysis?
What does 'TR-02 1.5 MVA LV-07 0.4kV 0.015 km' refer to in the load flow analysis?
What is the main objective of the power quality analysis mentioned in the text?
What is the main objective of the power quality analysis mentioned in the text?
What is the significance of analyzing the power quality impact of a PV plant on the grid?
What is the significance of analyzing the power quality impact of a PV plant on the grid?
Why is it important to assess steady-state loading and voltage profile after introducing a PV plant?
Why is it important to assess steady-state loading and voltage profile after introducing a PV plant?
What does the term 'System Equivalent = 18.5kA, X/R=10' indicate in the context of power quality analysis?
What does the term 'System Equivalent = 18.5kA, X/R=10' indicate in the context of power quality analysis?
What role does 'Ref voltage at 132kV busbar= 1.0 p.u.' play in power quality analysis?
What role does 'Ref voltage at 132kV busbar= 1.0 p.u.' play in power quality analysis?
What is the power factor of L1 according to the provided data?
What is the power factor of L1 according to the provided data?
At what power factor does L2 operate based on the information provided?
At what power factor does L2 operate based on the information provided?
What is the X/R ratio of the system based on the details given?
What is the X/R ratio of the system based on the details given?
What does the system rely on to maintain a voltage of 1.1 pu according to the details provided?
What does the system rely on to maintain a voltage of 1.1 pu according to the details provided?
What is the purpose of the note 'System Analysis Summary for Reactive power assessment'?
What is the purpose of the note 'System Analysis Summary for Reactive power assessment'?
Who is credited with providing valuable information in the text?
Who is credited with providing valuable information in the text?
What is the formula to calculate the loss in the PV system discussed in the text?
What is the formula to calculate the loss in the PV system discussed in the text?
What is the average Power Factor (PF) for Load 1?
What is the average Power Factor (PF) for Load 1?
What is the System Equivalent value mentioned in the text?
What is the System Equivalent value mentioned in the text?
Which case in the contingency analysis involves considering N-1 for one 33kV cable circuit?
Which case in the contingency analysis involves considering N-1 for one 33kV cable circuit?
What is the Power Factor (PF) for Load 2 as mentioned in the text?
What is the Power Factor (PF) for Load 2 as mentioned in the text?
In the PV system, what does the term 'N-1' refer to in the context of Case 1 of the contingency analysis?