PASS Device Start-up Sequence
12 Questions
5 Views

PASS Device Start-up Sequence

Created by
@StatelyCliché

Podcast Beta

Play an AI-generated podcast conversation about this lesson

Questions and Answers

On which side does the HUD display the pressure status?

  • Right side (correct)
  • Left side
  • Front side
  • Both sides
  • What color indicates a pressure range of 36-49% on the HUD?

  • Blue
  • Red
  • Green
  • Yellow (correct)
  • How many LEDs are lit for a pressure range of 0-35%?

  • 1
  • 5 (correct)
  • 2
  • 4
  • Which segment indicates a pressure range of 75-100%?

    <p>Segment 1</p> Signup and view all the answers

    What is the color indication for a pressure range of 0-35%?

    <p>Red</p> Signup and view all the answers

    How many LEDs are lit for a pressure range of 50-74% in Segment 2?

    <p>2</p> Signup and view all the answers

    What information does the logo screen provide during the start-up sequence?

    <p>MSA logo and Riding Position</p> Signup and view all the answers

    What do the buddy lights on the power and control modules do during the start-up sequence?

    <p>Cycle through red, yellow, and green</p> Signup and view all the answers

    Which screen shows the results of the self-test?

    <p>Self-test screen</p> Signup and view all the answers

    What does a Go icon on the self-test screen indicate?

    <p>SCBA can be put into service</p> Signup and view all the answers

    What is the purpose of the countdown timer on the primary screen?

    <p>Show estimated remaining service pressure</p> Signup and view all the answers

    How can the secondary screen be accessed?

    <p>By pressing the green button once</p> Signup and view all the answers

    Study Notes

    Start-up Sequence

    • The PASS device goes through a start-up sequence when it wakes up from sleep mode, providing information to the control module about the SCBA's operational state.
    • The logo screen displays the MSA logo, unit, and riding position (if assigned) on the control module.
    • The buddy lights on the power and control modules cycle through red, yellow, and green, while the power module plays the start-up tone.
    • The PASS device performs a self-test to ensure it's operating correctly during this sequence.

    Self-Test Results

    • A successful self-test displays a "Go" icon, indicating the SCBA can be put into service.
    • If maintenance is required, the overhaul reminder icon appears, indicating the SCBA should be removed from service after use.
    • If the SCBA should not be used, a Hardware Alarm icon appears on the control module, and a full alarm sounds from the power module.

    Primary Screen

    • The primary screen provides critical information to the user, including a calculated remaining service time.
    • The countdown timer displays the estimated rated service pressure until 35% remaining, following the Air Management Guideline.
    • The actual time remaining may be less than the calculated time displayed due to variations in breathing rate.

    Secondary Screen

    • The secondary screen can be accessed by pressing the green button once and displays the following information:
      • HUD Pressure Status
      • Pressure Status Indicators:
        • Segment 1: 75-100% pressure range, green LED
        • Segment 2: 50-74% pressure range, yellow LED
        • Segment 3: 36-49% pressure range, three yellow LEDs
        • Segment 4: 0-35% pressure range, five red LEDs
      • Pressure and Color Codes:
        • 50-100% pressure: green, 1425 PSI display
        • 36-49% pressure: yellow, flashing display
        • 0-35% pressure: red, flashing display

    SCBA Unit Identifier

    • The SCBA features a unit identifier that corresponds with the apparatus, assisting in quick visual identification.
    • The identifier is secured to the carrier band and complements the accountability system.
    • Examples of unit identifiers include Engine (E701), Aerial (L702), Rescue (R701), and more.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    The PASS device start-up sequence provides information about the SCBA's state of operation. It includes a logo screen, buddy light cycling, and a start-up tone, followed by a self-test.

    More Like This

    Use Quizgecko on...
    Browser
    Browser