10 Questions
Which safety measure should be taken when preparing the vessel for operation?
Double check the oil dipstick
What should be done to prevent water from spilling and damaging the electrics in the bilge area?
Partially crack open the water-strainer twist lid
What should be done after checking the engine oil, belt tension, and performing a general visual inspection?
Close the hatch
What should be done during the dry dock process?
Remove the cap on the air valve of the dry dock
What should be done when disconnecting from the dry dock?
Turn off the circuit breaker on the post
Which safety measure should be taken when preparing the vessel for operation?
Tie back the hatch from the eyelet to the handrail
What should be done after checking the engine oil, belt tension, and performing a general visual inspection?
Double check the oil dipstick position
What should be done to prevent water from spilling and damaging the electrics in the bilge area?
Partially crack open the water-strainer twist lid
What should be done when disconnecting from the dry dock?
Turn off the circuit breaker on the post
What should be done during the dry dock process?
Remove the cap on the air valve of the dry dock
Test your knowledge on the standard operating procedures for MV Swan with this quiz. Ensure correct and safe operation of the vessel by understanding and following the checklist on startup. Covering topics such as preparation and safety measures, this quiz will assess your understanding of the procedures necessary for operating the MV Swan.
Make Your Own Quizzes and Flashcards
Convert your notes into interactive study material.
Get started for free