Methods of Compensation and Schedule of Fees Quiz
30 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the prescribed multiplier factor for the PPCC Lump Sum Salary Cost x Multiplier Retainer compensation?

  • 5.0
  • 4.5
  • 3.0 (correct)
  • 1.5 to 2.5
  • Which of the following shall not be preferably billed via a Per Diem compensation?

  • One-Time Client Consultation
  • Repeated use of an already built project (correct)
  • Site inspection for a probable building location
  • OSH Seminar Attendance
  • To whom are the mobilization and operational costs billable to?

  • Government
  • Architect
  • Technical Staff
  • Client (correct)
  • Is travel time considered part of the time spent for rendering the service?

    <p>Yes</p> Signup and view all the answers

    What is not considered as non-creative work?

    <p>Regular Design Services</p> Signup and view all the answers

    What Method of Compensation is most commonly used?

    <p>Lump Sum</p> Signup and view all the answers

    What was the estimated market cost per square meter for the brewery construction project?

    <p>PHP 85,000/sqm</p> Signup and view all the answers

    What percentage higher was the final construction cost compared to the initial proposed cost?

    <p>5% higher</p> Signup and view all the answers

    What was the honorarium agreed upon for attending a two-day training session?

    <p>PHP 4,000/day</p> Signup and view all the answers

    What does APCC stand for in the context of the construction project?

    <p>Actual Project Construction Cost</p> Signup and view all the answers

    What was found to be 5% higher than the last estimated cost during the bidding process?

    <p>FPCC</p> Signup and view all the answers

    What was the Client's opinion about the final design's cost compared to the original agreed upon cost?

    <p>15% more expensive</p> Signup and view all the answers

    If the Client requests non-critical changes to the design during construction, will the Client have to pay for additional works on your end?

    <p>No, changes can still be made since the project is not yet done.</p> Signup and view all the answers

    When will you receive the rest of your RPF (Retainer's Professional Fee)?

    <p>After the occupancy permit is released</p> Signup and view all the answers

    What was the total fee that was charged to the Client for the entire project?

    <p>PHP 3,015,621</p> Signup and view all the answers

    What Method of Compensation was used during the entire project?

    <p>PPCC</p> Signup and view all the answers

    What is the SPP Document for the new Methods of Compensation and Schedule of Fees?

    <p>310</p> Signup and view all the answers

    What is the RPF for a Physical Planning work for a relatively flat site with a Total Area of 45 hectares?

    <p>PHP 1,050,000</p> Signup and view all the answers

    For an initial proposal with only project type and area specified, which Method of Compensation is best used?

    <p>Unit Cost Method</p> Signup and view all the answers

    After submitting the Preliminary Master Development Plan for a project, how much of your RPF should you have received?

    <p>30%</p> Signup and view all the answers

    What is the Proposed Project Cost for a 180 sqm project with a costing of PHP 30,000/sqm for complete works?

    <p>PHP 5.4M</p> Signup and view all the answers

    Calculate the Direct Cost payable by the Client for non-creative work by a team with specific hourly rates.

    <p>PHP 673,400</p> Signup and view all the answers

    Which Method of Compensation was used for the service in the previous item?

    <p>Unit Cost Method</p> Signup and view all the answers

    What is the best Method of Compensation for work requiring the Architect's personal time like seminars and trainings?

    <p>Per Diem</p> Signup and view all the answers

    After the signing of the Service Agreement, how much should the Client pay you?

    <p>PHP 187,600</p> Signup and view all the answers

    What is the Proposed Project Construction Cost?

    <p>PHP 35.7M</p> Signup and view all the answers

    After the approval of design schematics, how much does the Client owe you?

    <p>PHP 374,850</p> Signup and view all the answers

    Following the seminar and approval of final design proposal, how much does the Client owe you?

    <p>PHP 623,850</p> Signup and view all the answers

    Once the project is completed, how much does the Client have to pay you?

    <p>$0 (None)</p> Signup and view all the answers

    Will you still have a duty to fulfill to your Client once construction commences?

    <p>Yes. The Architect needs to check on the completion of the project for set periods of construction.</p> Signup and view all the answers

    More Like This

    Use Quizgecko on...
    Browser
    Browser