Methods of Compensation and Schedule of Fees Quiz

ParamountRaleigh avatar
ParamountRaleigh
·
·
Download

Start Quiz

Study Flashcards

30 Questions

What is the prescribed multiplier factor for the PPCC Lump Sum Salary Cost x Multiplier Retainer compensation?

3.0

Which of the following shall not be preferably billed via a Per Diem compensation?

Repeated use of an already built project

To whom are the mobilization and operational costs billable to?

Client

Is travel time considered part of the time spent for rendering the service?

Yes

What is not considered as non-creative work?

Regular Design Services

What Method of Compensation is most commonly used?

Lump Sum

What was the estimated market cost per square meter for the brewery construction project?

PHP 85,000/sqm

What percentage higher was the final construction cost compared to the initial proposed cost?

5% higher

What was the honorarium agreed upon for attending a two-day training session?

PHP 4,000/day

What does APCC stand for in the context of the construction project?

Actual Project Construction Cost

What was found to be 5% higher than the last estimated cost during the bidding process?

FPCC

What was the Client's opinion about the final design's cost compared to the original agreed upon cost?

15% more expensive

If the Client requests non-critical changes to the design during construction, will the Client have to pay for additional works on your end?

No, changes can still be made since the project is not yet done.

When will you receive the rest of your RPF (Retainer's Professional Fee)?

After the occupancy permit is released

What was the total fee that was charged to the Client for the entire project?

PHP 3,015,621

What Method of Compensation was used during the entire project?

PPCC

What is the SPP Document for the new Methods of Compensation and Schedule of Fees?

310

What is the RPF for a Physical Planning work for a relatively flat site with a Total Area of 45 hectares?

PHP 1,050,000

For an initial proposal with only project type and area specified, which Method of Compensation is best used?

Unit Cost Method

After submitting the Preliminary Master Development Plan for a project, how much of your RPF should you have received?

30%

What is the Proposed Project Cost for a 180 sqm project with a costing of PHP 30,000/sqm for complete works?

PHP 5.4M

Calculate the Direct Cost payable by the Client for non-creative work by a team with specific hourly rates.

PHP 673,400

Which Method of Compensation was used for the service in the previous item?

Unit Cost Method

What is the best Method of Compensation for work requiring the Architect's personal time like seminars and trainings?

Per Diem

After the signing of the Service Agreement, how much should the Client pay you?

PHP 187,600

What is the Proposed Project Construction Cost?

PHP 35.7M

After the approval of design schematics, how much does the Client owe you?

PHP 374,850

Following the seminar and approval of final design proposal, how much does the Client owe you?

PHP 623,850

Once the project is completed, how much does the Client have to pay you?

$0 (None)

Will you still have a duty to fulfill to your Client once construction commences?

Yes. The Architect needs to check on the completion of the project for set periods of construction.

Test your knowledge on the Methods of Compensation and Schedule of Fees by answering multiple-choice questions and solving problems. Time yourself for one hour to assess your progress. Includes questions related to PFPE Unit Cost Method and initial proposals.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Architect's Compensation Methods
5 questions
Management Fundamentals Quiz
24 questions
12. VA Guaranteed Loans T/F
10 questions
Use Quizgecko on...
Browser
Browser