Methods of Compensation and Schedule of Fees Quiz
30 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the prescribed multiplier factor for the PPCC Lump Sum Salary Cost x Multiplier Retainer compensation?

  • 5.0
  • 4.5
  • 3.0 (correct)
  • 1.5 to 2.5

Which of the following shall not be preferably billed via a Per Diem compensation?

  • One-Time Client Consultation
  • Repeated use of an already built project (correct)
  • Site inspection for a probable building location
  • OSH Seminar Attendance

To whom are the mobilization and operational costs billable to?

  • Government
  • Architect
  • Technical Staff
  • Client (correct)

Is travel time considered part of the time spent for rendering the service?

<p>Yes (D)</p> Signup and view all the answers

What is not considered as non-creative work?

<p>Regular Design Services (D)</p> Signup and view all the answers

What Method of Compensation is most commonly used?

<p>Lump Sum (D)</p> Signup and view all the answers

What was the estimated market cost per square meter for the brewery construction project?

<p>PHP 85,000/sqm (A)</p> Signup and view all the answers

What percentage higher was the final construction cost compared to the initial proposed cost?

<p>5% higher (A)</p> Signup and view all the answers

What was the honorarium agreed upon for attending a two-day training session?

<p>PHP 4,000/day (B)</p> Signup and view all the answers

What does APCC stand for in the context of the construction project?

<p>Actual Project Construction Cost (B)</p> Signup and view all the answers

What was found to be 5% higher than the last estimated cost during the bidding process?

<p>FPCC (C)</p> Signup and view all the answers

What was the Client's opinion about the final design's cost compared to the original agreed upon cost?

<p>15% more expensive (B)</p> Signup and view all the answers

If the Client requests non-critical changes to the design during construction, will the Client have to pay for additional works on your end?

<p>No, changes can still be made since the project is not yet done. (D)</p> Signup and view all the answers

When will you receive the rest of your RPF (Retainer's Professional Fee)?

<p>After the occupancy permit is released (D)</p> Signup and view all the answers

What was the total fee that was charged to the Client for the entire project?

<p>PHP 3,015,621 (C)</p> Signup and view all the answers

What Method of Compensation was used during the entire project?

<p>PPCC (B)</p> Signup and view all the answers

What is the SPP Document for the new Methods of Compensation and Schedule of Fees?

<p>310 (A)</p> Signup and view all the answers

What is the RPF for a Physical Planning work for a relatively flat site with a Total Area of 45 hectares?

<p>PHP 1,050,000 (B)</p> Signup and view all the answers

For an initial proposal with only project type and area specified, which Method of Compensation is best used?

<p>Unit Cost Method (C)</p> Signup and view all the answers

After submitting the Preliminary Master Development Plan for a project, how much of your RPF should you have received?

<p>30% (B)</p> Signup and view all the answers

What is the Proposed Project Cost for a 180 sqm project with a costing of PHP 30,000/sqm for complete works?

<p>PHP 5.4M (C)</p> Signup and view all the answers

Calculate the Direct Cost payable by the Client for non-creative work by a team with specific hourly rates.

<p>PHP 673,400 (D)</p> Signup and view all the answers

Which Method of Compensation was used for the service in the previous item?

<p>Unit Cost Method (B)</p> Signup and view all the answers

What is the best Method of Compensation for work requiring the Architect's personal time like seminars and trainings?

<p>Per Diem (B)</p> Signup and view all the answers

After the signing of the Service Agreement, how much should the Client pay you?

<p>PHP 187,600 (C), PHP 187,600 (D)</p> Signup and view all the answers

What is the Proposed Project Construction Cost?

<p>PHP 35.7M (A)</p> Signup and view all the answers

After the approval of design schematics, how much does the Client owe you?

<p>PHP 374,850 (A)</p> Signup and view all the answers

Following the seminar and approval of final design proposal, how much does the Client owe you?

<p>PHP 623,850 (B)</p> Signup and view all the answers

Once the project is completed, how much does the Client have to pay you?

<p>$0 (None) (A)</p> Signup and view all the answers

Will you still have a duty to fulfill to your Client once construction commences?

<p>Yes. The Architect needs to check on the completion of the project for set periods of construction. (B)</p> Signup and view all the answers

More Like This

Architect's Compensation Methods
5 questions
Employee Benefits and Compensation Methods
40 questions
Payment Methods in Business
5 questions
Business Finance: Employee Compensation Methods
5 questions
Use Quizgecko on...
Browser
Browser