Mastering Construction Siteworks and Substructure
5 Questions
1 Views

Mastering Construction Siteworks and Substructure

Created by
@GroundbreakingBay

Podcast Beta

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which of the following best describes site temporary works?

  • Permanent structures that remain in place after the completion of the project
  • Temporary parts of the construction process that are needed before permanent works can start
  • Construction materials and equipment used on the site
  • Works that protect, support, or provide access to the permanent works (correct)
  • What are some examples of site temporary works?

  • Concrete foundations and walls
  • Permanent structures and equipment
  • Temporary bridges and signage
  • Earthworks trenches and excavations (correct)
  • What is the purpose of site temporary works?

  • To provide long-term support for the permanent works
  • To facilitate the smooth and efficient completion of the build (correct)
  • To ensure the safety of workers on the construction site
  • To minimize the cost of construction
  • Which of the following is not considered a site temporary work?

    <p>Concrete foundations</p> Signup and view all the answers

    What are some examples of structures included in site temporary works?

    <p>Temporary bridges and signage</p> Signup and view all the answers