Mastering Bid Depositories
26 Questions
4 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which term refers to a change to the bid package issued during the bid period and before execution of the contract?

  • Definitions Addendum (correct)
  • Pre-tendering
  • Base Bid
  • Bid or Tender
  • What is the term used to describe a price and/or time estimate in response to a bid or tender call?

  • Guarantee
  • Bond
  • Pre-purchasing
  • Bid or Tender (correct)
  • What does pre-selecting refer to in the context of construction contracts?

  • Purchasing materials, equipment or services by the owner prior to award of the prime contract
  • Calling tenders by the owner prior to the prime contract tender call
  • Modifying the drawings and specifications issued during the bid period
  • Pre-qualifying and selecting a manufacturer or supplier before the tender or award of the total contract (correct)
  • Which of the following is NOT addressed in the chapter regarding the procurement of a construction contractor using the design-bid-build method?

    <p>Situations when the architect is retained by a design-builder</p> Signup and view all the answers

    According to the text, what is the purpose of a surety in a construction contract?

    <p>To guarantee the performance of the person bonded</p> Signup and view all the answers

    What must the architect be cognizant of when it comes to the bidding and tendering process?

    <p>The Canadian common law associated with tendering and bidding</p> Signup and view all the answers

    What is one of the services provided by the architect in the procurement of a construction contractor?

    <p>Assist Client with Pre-qualification of Bidders</p> Signup and view all the answers

    According to CCDC 23, what should the bid-calling authority do if a genuine and significant mistake is found in a bid?

    <p>Reject the bid and return it unopened</p> Signup and view all the answers

    Under what conditions can a bidder withdraw their bid without penalty?

    <p>If a serious mistake is made in the bid</p> Signup and view all the answers

    What happens if only one bid is submitted?

    <p>The bid is rejected and returned unopened</p> Signup and view all the answers

    Which type of tender call is frequently used when the project involves public funds?

    <p>Open Competitive Bids</p> Signup and view all the answers

    What is the purpose of pre-qualification in the tendering process?

    <p>To eliminate candidates who do not have the necessary financial capacity and experience</p> Signup and view all the answers

    What is a bond in the construction industry?

    <p>A guarantee from a bonding company</p> Signup and view all the answers

    When are negotiated contracts mostly used in construction procurement?

    <p>When time is of the essence or long-term relationships are valued</p> Signup and view all the answers

    Which of the following is NOT a responsibility that architects may need to provide bidders with information on?

    <p>Post-awards</p> Signup and view all the answers

    What is the purpose of a privilege clause in the bid package?

    <p>To justify awarding a contract to someone other than the lowest bidder</p> Signup and view all the answers

    According to the text, accepting a non-conforming bid is considered a breach of the duty of fairness to all other bidders.

    <p>True</p> Signup and view all the answers

    What is the purpose of a bid depository?

    <p>To collect and register bids from subcontractors and suppliers</p> Signup and view all the answers

    Which bond guarantees that if the bid is accepted within the time stated, the contractor will enter into a formal contract with the owner?

    <p>Bid Bond</p> Signup and view all the answers

    Which bond indemnifies the owner up to the amount of the bond in the event of default on the part of the contractor?

    <p>Performance Bond</p> Signup and view all the answers

    Which bond guarantees that claimants will be paid for labour and materials provided to the contractor for use on the project?

    <p>Labour and Material Payment Bond</p> Signup and view all the answers

    What is the recommended form of bid security if a bid bond is selected?

    <p>CCDC 220 – Bid Bond</p> Signup and view all the answers

    According to the text, what is the purpose of addenda in bid documents?

    <p>To modify or interpret the bid documents</p> Signup and view all the answers

    What should architects do when organizing addenda in bid documents?

    <p>Number and date each addendum</p> Signup and view all the answers

    When should the last opportunity for issuing an addendum be?

    <p>Four working days before bid closing</p> Signup and view all the answers

    Why is it important to specify the bid closing time as 'before' the hour?

    <p>To allow for time-stamping and date-stamping of bids</p> Signup and view all the answers

    More Like This

    Mastering Options Greeks
    24 questions
    Mastering Bid Depositories
    26 questions

    Mastering Bid Depositories

    WorthwhilePyrite5473 avatar
    WorthwhilePyrite5473
    Mastering the Bid Process in Construction
    26 questions
    Mastering Small Talk Guide
    10 questions

    Mastering Small Talk Guide

    FeasibleMeadow7499 avatar
    FeasibleMeadow7499
    Use Quizgecko on...
    Browser
    Browser