Which of the following is considered a non-compliant bid?

  • A bid that meets all the basic requirements
  • A bid that is properly signed and sealed
  • A bid that does not indicate the correct number of addenda received (correct)
  • A bid that includes the requested bid bond

What should the architect do if a bid is deemed non-compliant?

  • Reject the bid (correct)
  • Accept the bid
  • Provide legal advice to the client
  • Advise the client on the bid amount

What type of advice should the architect provide to the client regarding a bid?

  • Advise the client on whether to enter a contract with a particular contractor
  • Recommend accepting or rejecting the bid (correct)
  • Provide legal counsel to the client
  • Assist the client in meeting bonding requirements

What is the architect's role in the preparation of the construction contract?

<p>The architect prepares the contract (B)</p> Signup and view all the answers

What is the purpose of a letter of acceptance in a contract award?

<p>To allow the contractor to start work immediately (B)</p> Signup and view all the answers

What is the recommended standard form of construction contract to be used?

<p>CCDC 2 - Stipulated Price Contract (A)</p> Signup and view all the answers

Why should unsuccessful bidders be notified promptly of the contract award?

<p>To allow contractors to bid on other projects (A)</p> Signup and view all the answers

More Like This

Mastering Bid Depositories
26 questions

Mastering Bid Depositories

WorthwhilePyrite5473 avatar
WorthwhilePyrite5473
Mastering Bid Depositories
26 questions

Mastering Bid Depositories

WorthwhilePyrite5473 avatar
WorthwhilePyrite5473
Mastering Small Talk Guide
10 questions

Mastering Small Talk Guide

FeasibleMeadow7499 avatar
FeasibleMeadow7499
Use Quizgecko on...
Browser
Browser