Podcast
Questions and Answers
The rules for carrying out tests are based on ASME A17.1-2016 / CSA B44-16, EN81-1/2: 1998+A3, and EN81-20:2014, among others.
The rules for carrying out tests are based on ASME A17.1-2016 / CSA B44-16, EN81-1/2: 1998+A3, and EN81-20:2014, among others.
True
According to the text, a SAIS or a test must be carried out after important modification of a lift, according to the manufacturer's specifications or SAIS document.
According to the text, a SAIS or a test must be carried out after important modification of a lift, according to the manufacturer's specifications or SAIS document.
True
If the local legal requirements are less stringent than Schindler’s, then the local requirements must be followed.
If the local legal requirements are less stringent than Schindler’s, then the local requirements must be followed.
False
A 'one-to-one replacement' not listed in the table in chapter 3.5 must be subject to the SAIS.
A 'one-to-one replacement' not listed in the table in chapter 3.5 must be subject to the SAIS.
Signup and view all the answers
The text specifies that a SAIS or a test is always necessary according to the technical documentation of R&D/supplier documentation.
The text specifies that a SAIS or a test is always necessary according to the technical documentation of R&D/supplier documentation.
Signup and view all the answers
According to the text, when must a SAIS or a test be carried out after important modification of a lift?
According to the text, when must a SAIS or a test be carried out after important modification of a lift?
Signup and view all the answers
What must be done if the local legal requirements are more stringent than Schindler's?
What must be done if the local legal requirements are more stringent than Schindler's?
Signup and view all the answers
Which standards are the rules for carrying out tests based on?
Which standards are the rules for carrying out tests based on?
Signup and view all the answers
When is a SAIS or a test according to technical documentation of R&D/supplier documentation always necessary?
When is a SAIS or a test according to technical documentation of R&D/supplier documentation always necessary?
Signup and view all the answers
What must be done for a 'one-to-one replacement' not listed in the table in chapter 3.5?
What must be done for a 'one-to-one replacement' not listed in the table in chapter 3.5?
Signup and view all the answers