Land-locked Plots and Road Access Regulation

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What does the term 'land-locked plot' refer to?

  • A plot with direct access to highways
  • A plot surrounded by other plots without road access (correct)
  • A plot with access to multiple roads
  • A plot reserved for commercial use

What is the minimum width of access required for a land-locked plot?

  • 6 meters
  • 12 meters
  • 9 meters (correct)
  • 15 meters

Who is responsible for maintaining layout roads after their development?

  • The developer
  • The property owner
  • The Planning Authority (correct)
  • The municipal council

What is the primary purpose of defining intersections in road layouts?

<p>To ensure traffic safety and minimize accidents (C)</p> Signup and view all the answers

In case of a land-locked plot, access is usually provided through:

<p>Adjacent plots (A)</p> Signup and view all the answers

What is the minimum distance for sightlines (V) at road intersections intended for?

<p>Ensuring driver visibility and safety (D)</p> Signup and view all the answers

What is the responsibility of the developer after completing the internal roads in a layout?

<p>Transfer the roads to the Planning Authority (D)</p> Signup and view all the answers

Which legal document specifies the timeline for handing over layout roads?

<p>Commencement Letter (B)</p> Signup and view all the answers

If a land-locked plot's access is created through a reserved area, what must remain unchanged?

<p>The reservation's intended use (C)</p> Signup and view all the answers

What is the width range for roads at intersections in small towns like Mehkar?

<p>As per road category and design norms (B)</p> Signup and view all the answers

Flashcards

Land-locked plot definition

A plot of land completely surrounded by other plots, without direct road access.

Land-locked plot access

Access to a land-locked plot is usually provided through adjacent plots.

Layout road maintenance

After development, the Planning Authority is responsible for maintaining layout roads.

Road intersection purpose

Road intersections are designed to ensure traffic safety and minimize accidents.

Signup and view all the flashcards

Minimum access width for land-locked plot

The minimum access width for a land-locked plot is 9 meters.

Signup and view all the flashcards

Developer's responsibility after internal roads

The developer must transfer responsibility of internal roads to the Planning Authority.

Signup and view all the flashcards

Sightlines (V) purpose

Sightlines (V) at road intersections are crucial for driver visibility and safety.

Signup and view all the flashcards

Document specifying road handover timeline

The commencement letter specifies the specific timeline for handing over layout roads.

Signup and view all the flashcards

Reserved area access changes

If a land-locked plot’s access is created through a reserved area, the intended use of the reservation must remain unchanged during the transfer.

Signup and view all the flashcards

Road width at intersections (small towns)

Road widths at intersections in small towns like Mehkar are determined by design norms considering the design category of the road.

Signup and view all the flashcards

Study Notes

Land-locked Plots and Road Access

  • Land-locked plot: A plot of land surrounded by other plots without road access (B).
  • Minimum access width: The minimum width of access required for a land-locked plot is 9 meters (B).
  • Layout road maintenance: The Planning Authority is responsible for maintaining layout roads after their development (B).
  • Purpose of intersections: Intersections in road layouts are designed to ensure traffic safety and minimize accidents (C).
  • Land-locked plot access: Access for land-locked plots is usually provided through adjacent plots (B).
  • Sightline requirements: Minimum sightlines (V) at road intersections are intended to ensure driver visibility and safety (B).
  • Developer's post-road completion responsibility: The developer must transfer the roads to the Planning Authority after completing internal roads (B).
  • Road handover timeline document: The Commencement Letter specifies the timeline for handing over layout roads (A).
  • Reserved area access conditions: If a land-locked plot's access is created through a reserved area, the reservation's intended use must remain unchanged (A).
  • Road width at Mehkar intersections: Road widths at intersections in small towns like Mehkar are determined by the road category and design norms (C).

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

More Like This

Use Quizgecko on...
Browser
Browser