Podcast
Questions and Answers
Who must attend the Pre-Membership Seminar before applying for membership?
Who must attend the Pre-Membership Seminar before applying for membership?
It is allowed to transfer the location of a kWh meter without approval from the Area Services Department.
It is allowed to transfer the location of a kWh meter without approval from the Area Services Department.
False
What must be submitted to the CWDO for a new connection application?
What must be submitted to the CWDO for a new connection application?
Electrical Plan containing details of Barangay Electrician and contact information.
Failure to comply with the meter reading requirement shall result in _____ action.
Failure to comply with the meter reading requirement shall result in _____ action.
Signup and view all the answers
Match the following requirements with the corresponding details:
Match the following requirements with the corresponding details:
Signup and view all the answers
What document must the applicant secure from the District Supervisor before inspecting a blueprint electrical plan?
What document must the applicant secure from the District Supervisor before inspecting a blueprint electrical plan?
Signup and view all the answers
The CWDO is responsible for preparing the Service Memorandum for Inspection.
The CWDO is responsible for preparing the Service Memorandum for Inspection.
Signup and view all the answers
Who conducts the inspection and prepares the Inspection Report?
Who conducts the inspection and prepares the Inspection Report?
Signup and view all the answers
The District Staff shall prepare the Request for Issuance of ______, indicating the names of applicants and connection address.
The District Staff shall prepare the Request for Issuance of ______, indicating the names of applicants and connection address.
Signup and view all the answers
Which department must approve all new connection applications?
Which department must approve all new connection applications?
Signup and view all the answers
Match the following roles with their responsibilities:
Match the following roles with their responsibilities:
Signup and view all the answers
The cooperative's Standard Connection Facility includes all meter bases (socket type).
The cooperative's Standard Connection Facility includes all meter bases (socket type).
Signup and view all the answers
What should be issued by the CWDO after inspecting the connections?
What should be issued by the CWDO after inspecting the connections?
Signup and view all the answers
Study Notes
Transfer of kWh Meter Location
- Transfer of kWh meter location is strictly prohibited without prior approval from the Area Services Department (ASD) and the Billing and Meter Reading Section.
Meter Reading Requirements
- All kWh meters, regardless of status (disconnected, active, or no record), must be read every billing period.
- Failure to comply with meter reading requirements will result in disciplinary action.
New Connection and Membership Procedures
- New non-member applicants must attend a Pre-Membership Seminar and apply for membership.
- Applicants must provide a valid ID and sign the "Kontrata" for pending membership approval.
- Applicants need to submit an Electrical Plan containing:
- Name of Barangay Electrician
- Photo of Barangay Electrician
- Name of Contractor (if applicable)
- Contact Number of Applicant, Barangay Electrician, and Contractor
- GPS coordinates
- Pictures of the vicinity
- View of the possible location of the kWh meter
- Applicants must secure a copy of the Standard Operating Procedure and Standard design for installing kWh meters, service entrances, and other necessary designs from the District Supervisor.
- The CWDO prepares a Service Memorandum for Inspection with required documents and secures Special Operations Task Group (SOTG) Clearance.
- The SOTG Officer verifies applicant information and recommends SOTG Clearance for approval by the General Manager.
- The Housewiring Inspector or District Foreman conducts the inspection and prepares an Inspection Report, subject to Area Services Department Manager approval.
- If an application requires transformer recommendations, line extensions, or other specific requirements, the Inspection Report and its attachments must be submitted to the Corporate Planning Department (CPD).
- The District Staff prepares a Request for Issuance of kWh Meter and submits it to the Warehouse Section for the Availability of kWh Meter Certificate.
- Completed new connection applications are submitted to the Billing and Meter Reading Section for Billing Clearance and posting of the kWh meter serial number in the Electronic Billing System.
- The CWDO issues a Service Connect Order.
- The District Supervisor is responsible for scheduling the connection, collecting membership fees, membership ID fees, and inspection fees.
- The Membership Data Custodian submits all membership applications to the Board of Directors for approval upon recommendation from the General Manager.
- The Service Connect Order is endorsed to the maintenance crew for installation, energization, and issuing the Membership ID (if available).
Meter Base and Connection Facility
- The cooperative's standard connection facility does not include meter bases.
- New connection applicants are responsible for purchasing the meter base at the 2023 NEA Price Index.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
This quiz covers the essential guidelines regarding the transfer of kWh meter locations, meter reading requirements, and procedures for new connections. Understanding these protocols is crucial for anyone involved with electrical services and connections. Ensure compliance to avoid disciplinary actions and streamline the membership application process.