KAVACH Control Table Guidelines Quiz
43 Questions
0 Views

KAVACH Control Table Guidelines Quiz

Created by
@SolicitousOklahomaCity

Podcast Beta

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the maximum speed permitted for the first train in OS mode when passing a defective signal with authority to proceed?

  • The speed cannot exceed 120 kmph
  • Allowed speed is always 60 kmph
  • Speed may vary based on operational rules (correct)
  • No speed limit is applied in this scenario
  • Which information must be included at the top of every sheet according to User Railway’s practices?

  • Train schedule details
  • Average daily footfall
  • Name and Description of Station/IB/LC (correct)
  • Current weather conditions
  • What is required to be included on every sheet as per User Railway’s practices?

  • A summary of previous trips
  • Current train availability
  • Signature block (correct)
  • Employee performance review
  • What element should be included to keep track of changes made to the sheet?

    <p>Revision history</p> Signup and view all the answers

    Which tables are referenced for Absolute and Automatic block sections for Indian Railways?

    <p>Typical KAVACH control table and Track Profile Table</p> Signup and view all the answers

    What is the distance specified for approaching signals from the first diverging point?

    <p>30m</p> Signup and view all the answers

    In terms of permanent speed restriction, what does the 'A' designation signify?

    <p>Static speed for category ‘A’ trains</p> Signup and view all the answers

    What additional distance is added when calculating speed restriction distance from the foot of the approaching signal outside the station?

    <p>10m</p> Signup and view all the answers

    What type of gradient is specified in the context of engineering gradient?

    <p>Both rising (R) and falling (F)</p> Signup and view all the answers

    What is indicated by the gradient value '1 in 400'?

    <p>A gentle slope</p> Signup and view all the answers

    What must be included in the track profile table for differing permissible speeds in turnout portions and loop lines?

    <p>Speed restriction distance for both portions</p> Signup and view all the answers

    What is the speed restriction type designated as 'U'?

    <p>Static speed for all train categories</p> Signup and view all the answers

    What is the permissible length of the permanent speed restriction in meters?

    <p>Measured length as defined in system</p> Signup and view all the answers

    What is the key condition that must be mandatorily implemented according to the modified clause?

    <p>Kavach Territory Exit</p> Signup and view all the answers

    When does the document specify its effective date?

    <p>07.06.2024</p> Signup and view all the answers

    What type of signaling territories does this document cover guidelines for?

    <p>Absolute, Automatic, and Modified Automatic Block Signalling</p> Signup and view all the answers

    Who is the digital signer for the document?

    <p>Pavan Kumar</p> Signup and view all the answers

    What was added to the guidelines on 25.05.2024?

    <p>Template of Adjustment/Junction tag</p> Signup and view all the answers

    Which ISO certification is mentioned in the document?

    <p>ISO 9001: 2015</p> Signup and view all the answers

    What is the title of the document referenced?

    <p>Annexure-I - Specification of KAVACH</p> Signup and view all the answers

    Which information should be included at the top of the control sheet?

    <p>Station Name, Station ID, Section and Division</p> Signup and view all the answers

    Which of the following roles does Manish Kumar Gupta hold?

    <p>SSE/S&amp;T/RDSO/SC</p> Signup and view all the answers

    What does the version control format X.Y.Z represent?

    <p>KAVACH Version, RFID Tag Layout/SIP version, and Guidelines change</p> Signup and view all the answers

    Which type of signal is treated as a RED aspect permanently kept at 'ON' in terminal yards?

    <p>Stop Board</p> Signup and view all the answers

    How should distances be measured according to the guidelines?

    <p>From the entry signal RFID tag absolute location</p> Signup and view all the answers

    Which of the following is NOT a specified section type that must be mentioned?

    <p>Train Delay Section</p> Signup and view all the answers

    What aspect of the entry signal is indicated in the control tables?

    <p>All possible OFF, Red, and Blank aspects</p> Signup and view all the answers

    Which part of the control table describes the route for a signal?

    <p>Line</p> Signup and view all the answers

    What should be done in case of an automatic block section regarding Movement Authority?

    <p>It should be derived from both signal aspect and occupancy status</p> Signup and view all the answers

    What does the abbreviation 'ABS' refer to in the context of the station layout?

    <p>Automatic Block System</p> Signup and view all the answers

    At what station ID does the GGD COMM START occur?

    <p>521</p> Signup and view all the answers

    Which of the following is NOT a measured nominal value at the station?

    <p>130.000</p> Signup and view all the answers

    What is the approximate distance from the ABS to the GGD COMM START in kilometers?

    <p>0.1 km</p> Signup and view all the answers

    Which of the following represents the reverse nominal value closest to an operational signal?

    <p>129.065</p> Signup and view all the answers

    What does the notation 'S' represent at the station layout?

    <p>Signal</p> Signup and view all the answers

    What is the maximum running length indicated for the DN MAIN section?

    <p>727 meters</p> Signup and view all the answers

    Which signal ID corresponds to a signal related to the P13 station point?

    <p>P18</p> Signup and view all the answers

    What does the 'R' in the signal IDs signify?

    <p>Relay</p> Signup and view all the answers

    What does the section labeled 'HBL SECTION START' typically indicate?

    <p>Heavy Block Line Start</p> Signup and view all the answers

    What does the reading '129.065' specify in this station layout?

    <p>Nominal Value</p> Signup and view all the answers

    What is the significance of the coordinate '128.399' in this layout?

    <p>It's a signal ID.</p> Signup and view all the answers

    Which letter represents the UP COMM LOOP-DN section in the layout?

    <p>G</p> Signup and view all the answers

    What does 'N-70' signify in the layout?

    <p>Section identifier</p> Signup and view all the answers

    Study Notes

    Maximum Speed for First Train

    • The maximum speed permitted for the first train in OS mode when passing a defective signal with authority to proceed is not provided in the text.

    Sheet Requirements

    • The text states that every sheet must include specific information at the top according to User Railway's practices.
    • Every sheet must include a section for tracking changes made to the sheet.

    Table References

    • The tables referenced for Absolute and Automatic block sections for Indian Railways are not specified.
    • The distance specified for approaching signals from the first diverging point is not provided.

    Permanent Speed Restrictions

    • The 'A' designation in a permanent speed restriction signifies a specific type of restriction, but the text does not elaborate on its meaning.

    Speed Restriction Distance Calculations

    • An additional distance is added when calculating speed restriction distance from the foot of the approaching signal outside the station, but the amount of this additional distance is not specified.

    Gradient

    • The type of gradient specified in the context of engineering gradient is not provided.
    • A gradient value of '1 in 400' indicates a specific slope, but the text does not explain its practical significance.

    Track Profile Table

    • The track profile table must include the permitted speeds for turnouts and loop lines.

    Speed Restriction Types

    • The speed restriction type designated as 'U' is not defined in the provided text.

    Permanent Speed Restriction Length

    • The permissible length of the permanent speed restriction is not specified in the document.

    Modified Clause

    • The specific condition that must be mandatorily implemented according to the modified clause is not mentioned.

    Effective Date

    • The document specifies its effective date, but it is not provided in the text.

    Signaling Territories

    • The document provides guidelines for specific types of signaling territories, but this information is not provided.

    Digital Signer

    • The digital signer for the document is not mentioned.

    Guidelines Updates

    • On 25.05.2024, updates were added to the guidelines, but the specific content of the updates is not given.

    ISO Certification

    • The ISO certification mentioned in the document is not provided.

    Document Title

    • The title of the document referenced is not specified.

    Control Sheet Information

    • The information that should be included at the top of the control sheet is not stated.

    Manish Kumar Gupta

    • Manish Kumar Gupta's specific role is not mentioned in the text.

    Version Control Format

    • The version control format X.Y.Z represents different versions of the document, but the text does not elaborate on its meaning.

    Terminal Yard Signal

    • In terminal yards, a signal is treated as a RED aspect permanently kept at 'ON'.

    Distance Measurement

    • According to the guidelines, distances should be measured in a specific way, but this method is not described in the text.

    Section Types

    • The text mentions various section types, but the text does not specify which one is NOT included.

    Control Table Entry Signal

    • The aspect of the entry signal is indicated in the control tables, but the text does not clarify what this aspect represents.

    Control Table Route

    • The part of the control table that describes the route for a signal is not described.

    Automatic Block Section Movement Authority

    • In case of an automatic block section regarding Movement Authority, the text does not specify what should be done.

    ABS Abbreviation

    • In the context of the station layout, the abbreviation 'ABS' refers to a specific location, but the text does not specify what it represents.

    GGD COMM START Station ID

    • The station ID at which GGD COMM START occurs is not provided.

    Nominal Values

    • The text mentions measured nominal values at the station but does not specify which value is NOT measured.

    Distance from ABS to GGD COMM START

    • The approximate distance from the ABS to the GGD COMM START in kilometers is not provided.

    Reverse Nominal Value

    • The closest operational signal to the reverse nominal value is not specified.

    'S' Notation

    • In the station layout, 'S' signifies a specific point, but the text does not explain its meaning.

    DN MAIN Section Running Length

    • The maximum running length indicated for the DN MAIN section is not specified.

    P13 Station Point Signal ID

    • The signal ID corresponding to a signal related to the P13 station point is not provided.

    Signal ID 'R'

    • In the signal IDs, 'R' signifies a specific aspect, but the text does not explain its meaning.

    HBL SECTION START

    • The section labeled 'HBL SECTION START' typically indicates the beginning of a specific section, but the text does not specify what this section represents.

    Reading '129.065'

    • The reading '129.065' specifies a specific location or measurement in the station layout, but the text does not explain its significance.

    Coordinate '128.399'

    • The significance of the coordinate '128.399' in the layout is not explained.

    UP COMM LOOP-DN Section

    • The letter representing the UP COMM LOOP-DN section in the layout is not specified.

    N-70

    • 'N-70' signifies a specific location or condition in the layout, but the text does not explain its meaning.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge on the KAVACH control table guidelines for various signaling territories. This quiz covers the format, distance measurements, and key components necessary for implementing Absolute, Automatic, and Modified Automatic Block Signalling. Perfect for railway signal engineers and transport professionals.

    More Like This

    Indian Railway ATP Speed Guidelines
    43 questions
    Functional Requirements of KAVACH System
    14 questions
    Stationary KAVACH Units Overview
    118 questions

    Stationary KAVACH Units Overview

    SolicitousOklahomaCity avatar
    SolicitousOklahomaCity
    Use Quizgecko on...
    Browser
    Browser