According to UDCPR, what is the minimum number of indigenous trees to be planted per hectare in an ITP?

  • 150 (correct)
  • 100
  • 50
  • 200

What percentage of the estimated development cost is required to be submitted as a bank guarantee by the project proponent?

  • 10%
  • 20%
  • 5%
  • 15% (correct)

Which of the following amenities is NOT included under basic infrastructure for ITP as per General Stipulations?

  • Swimming Pools (correct)
  • Trunk installations for power supply
  • Internal roads
  • Fire Station

If the ITP is located in a Planning Authority area, how is the scrutiny fee distributed?

<p>50% to Planning Authority and 50% to Government (A)</p> Signup and view all the answers

Unless extended by the Government, what is the maximum time allowed to complete an ITP project?

<p>10 years (C)</p> Signup and view all the answers

Under the General Stipulations of ITP, is it mandatory to provide amenity space as per Regional Plan norms?

<p>No, not mandatory (B)</p> Signup and view all the answers

Who is responsible for deciding whether infrastructure development in a phase of an ITP is satisfactory?

<p>Collector / Authority (B)</p> Signup and view all the answers

What type of trees are required to be planted in the ITP area?

<p>Indigenous trees (C)</p> Signup and view all the answers

What is the primary purpose of the bank guarantee submitted by the developer in an ITP?

<p>To ensure basic infrastructure development (D)</p> Signup and view all the answers

For how long must the developer maintain internal street lights, roads, and infrastructure in an ITP?

<p>Until the entire ITP project is completed (D)</p> Signup and view all the answers

Flashcards

Trees per Hectare (ITP)

Minimum 150 indigenous trees per hectare.

Bank Guarantee Percentage

15% of estimated development cost, as a bank guarantee.

Not Basic Infrastructure

Swimming Pools.

ITP Scrutiny Fee Distribution

50% to Planning Authority, 50% to Government.

Signup and view all the flashcards

ITP Completion Time

Maximum 10 years.

Signup and view all the flashcards

Amenity Space per Regional Plan

Not mandatory.

Signup and view all the flashcards

Satisfactory Infrastructure Decider

Collector / Authority.

Signup and view all the flashcards

Type of Trees

Indigenous trees.

Signup and view all the flashcards

Purpose of Bank Guarantee

To ensure basic infrastructure development.

Signup and view all the flashcards

Maintenance Responsibility

Until entire ITP project is completed.

Signup and view all the flashcards

Study Notes

  • These study notes cover General Stipulations for Integrated Township Projects (ITP) based on UDCPR (Unified Development Control and Promotion Regulations).
  • They include 10 Multiple Choice Questions (MCQs) relevant for the MPSC ATP (Maharashtra Public Service Commission Assistant Town Planner) Level exam.

Key Stipulations and Requirements for ITPs

  • A minimum of 150 indigenous trees per hectare must be planted in an ITP.
  • The project proponent needs to submit a bank guarantee equivalent to 15% of the estimated development cost.
  • Basic infrastructure for ITP includes a fire station, internal roads, and trunk installations for power supply, but excludes amenities such as swimming pools.
  • If the ITP is located within a Planning Authority area, the scrutiny fee is distributed with 50% going to the Planning Authority and 50% to the State Government.
  • The maximum time allowed to complete an ITP project is 10 years, unless an extension is granted by the Government.
  • Providing amenity space as per Regional Plan norms is not mandatory under the General Stipulations of ITP.
  • The Collector/Authority decides whether infrastructure development in a phase is satisfactory.
  • Only indigenous trees are required to be planted in the ITP area.
  • The bank guarantee submitted by the developer ensures the development of basic infrastructure.
  • The developer must maintain internal street lights, roads, and infrastructure until the entire ITP project is completed.