What document provides details of land ownership for an application to the government regarding a project?

  • Certificate from Forest Officer
  • NOC from Divisional Head
  • 7-12/property card (correct)
  • Village map

Which of the following is a required certificate from a specified officer?

  • Certificate from the Sanitation Inspector
  • Certificate from Director Archaeological Department (correct)
  • Certificate from Software Engineer
  • Certificate from Electrical Engineer

What type of plan is required as part of the application to the government?

  • Part plan of sanctioned RP/DP (correct)
  • Full plan of future projects
  • Rough sketch of the idea
  • Blueprint of surrounding houses

What does 'NOC' stand for in the context of governmental applications?

<p>No Objection Certificate (D)</p> Signup and view all the answers

What type of map is required as part of the application?

<p>Village map (A)</p> Signup and view all the answers

What officer provides a required certificate related to tribal land?

<p>Concerns Water Resource Officer (C)</p> Signup and view all the answers

What is the term for the fee that must be paid per hectare?

<p>Processing fee (B)</p> Signup and view all the answers

What type of statement includes details such as total area under ITP?

<p>Area statement (C)</p> Signup and view all the answers

What is the full form of ITP?

<p>Integrated Township Project (D)</p> Signup and view all the answers

The government consults with which committee before granting Locational Clearance?

<p>High Power Committee (HPC) (C)</p> Signup and view all the answers

Under which section(s) can the government declare a project to be an 'Integrated Township Project'?

<p>Section 18(3) or 44(2) (B)</p> Signup and view all the answers

How much is the processing fee per hectare?

<p>Rs. 5000 (D)</p> Signup and view all the answers

Which document includes total area under ITP?

<p>Area Statement (D)</p> Signup and view all the answers

Where does the government publish the Locational Clearance notification?

<p>Official Gazette (A)</p> Signup and view all the answers

Which document includes the name of the owner as per record of rights?

<p>Self-attested list of Survey No. / G. No. / CTS (C)</p> Signup and view all the answers

Flashcards

ITP Application Documents

Application to the government with land ownership details, survey numbers, RP/DP plan, NOCs, village map, and certificates from various departments.

Area Statement Details

A statement detailing the total area, areas covered by environmental restrictions (hilltops, CRZ, ESZ), reservations, amenity spaces and mandatory town-level amenities.

High Power Committee (HPC)

A committee appointed by the State Government to scrutinize, monitor, promote, transition, and review Integrated Township Projects (ITPs).

Locational Clearance & Declaration

Government grants this clearance after consulting with the HPC, officially declaring the project as an "Integrated Township Project."

Signup and view all the flashcards

Study Notes

  • Applications for Integrated Township Projects (ITP) require specific details and documents for submission to the government.
  • Land ownership details are needed, including 7-12 extracts or property cards and power of attorney if relevant.
  • A self-attested list of Survey numbers, Gat numbers, or CTS numbers showing the owner's name as per the record of rights is necessary.
  • A part plan of the sanctioned Regional Plan (RP) or Development Plan (DP) must be included.
  • A No Objection Certificate (NOC) from the Divisional Head of the Command Area is required.
  • A village map must be provided.
  • Certificates from various officers are required, including:
    • Forest Officer.
    • Concerned Water Resource Officer.
    • Revenue Officer/Tahsildar (regarding tribal land).
    • Director of Archaeological Department (not required for land below a certain size).
  • Processing fees are applicable, set at ₹5000 per hectare, with an additional annual increase of ₹500 per hectare.
  • An area statement containing:
    • Total area under the ITP.
    • Area covered by Hill Top, Hill slope, CRZ, ESZ etc.
    • Area under various D.P./R.P. Reservations.
    • Plot Area of 2% Amenity Space (if any).
    • Plot Area and Built-Up Area Allocations of Each Mandatory Town Level Amenities.
  • After receiving the application, the government consults with a High Power Committee (HPC).
  • The HPC is responsible for scrutiny, monitoring, promotions, transitions, and review of ITPs.
  • Following HPC consultation, the government may grant Locational Clearance.
  • The declaration of the project as an "Integrated Township Project" is made under sections 18(3) or 44(2) through official notification.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

More Like This

ITP Project Permissions and Declarations
14 questions
ITP Amenities & FSI as per UDCPR Table 14J
15 questions
ITP General Stipulations as per UDCPR
10 questions
Use Quizgecko on...
Browser
Browser