To measure VST, it is required to cut the PMMA specimen before annealing?

True

The temperature conditions for the injection machine should be set according to the grade?

True

Collecting the specimen is recommended after the first 5 shots?

False

It is necessary to start the program before cutting the specimen for VST measurement?

<p>True</p> Signup and view all the answers

What is the last step to stop the operation of the injection machine?

<p>Switch off the pump motor, switch off the heating, and shut off the supply of cooling water</p> Signup and view all the answers

What should be done in order to empty the cylinder during the operation of the injection machine?

<p>Switch off the pump motor, switch off the heating, and shut off the supply of cooling water</p> Signup and view all the answers

What is the first step to retract the nozzle to the mechanical end limit?

<p>Press this key and select 'manual' mode</p> Signup and view all the answers

What is the purpose of the work instruction PMMA - Vicat Softening Temperature?

<p>To describe the process for measuring VST and provide quality control support</p> Signup and view all the answers

Who is responsible for reviewing the work instruction PR/QCD/QCP2/WI-309?

<p>Muhammad Hasbi J. Rajab</p> Signup and view all the answers

What is the effective date of the work instruction PMMA - Vicat Softening Temperature?

<p>12/17/2022</p> Signup and view all the answers

What is the job title of Rakeshkumar P. Thakkar?

<p>Confidential Government</p> Signup and view all the answers

What should be done in order to empty the cylinder during the operation of the injection machine?

<p>Stop the operation of the injection machine</p> Signup and view all the answers

When is it recommended to collect the specimen for VST measurement?

<p>After the first 5 shots</p> Signup and view all the answers

How should the temperature conditions for the injection machine be set?

<p>According to the grade</p> Signup and view all the answers

What is the purpose of measuring the Vicat Softening Temperature of PMMA test specimen?

<p>To assess the thermal stability of the PMMA</p> Signup and view all the answers

What is the responsibility of the SSV in the QCD Polymer II Section?

<p>Monitor the proper implementation of work instructions</p> Signup and view all the answers

What should be used during the Vicat Softening Temperature measurement for safety?

<p>Safety goggles, heat resistance gloves, and safety shoes</p> Signup and view all the answers

What is the purpose of the silicone oil with viscosity 100 CST?

<p>To lubricate the test specimen</p> Signup and view all the answers

What is the significance of recording the Vicat Softening Temperature?

<p>To track changes in thermal properties of PMMA</p> Signup and view all the answers

What is the responsibility of the Laboratory Technician in step 5.8?

<p>Enter the results of VST in °C as a whole number and in LIMS</p> Signup and view all the answers

What must be ensured about the test specimens before testing in step 5.2?

<p>They should have flat and parallel surfaces without bending or flash</p> Signup and view all the answers

What is the purpose of dipping the specimen in oil bath in step 5.4?

<p>To provide uniform heating to the specimen</p> Signup and view all the answers

Study Notes

Starting Up the Injection Machine

  • Turn the main switch to the "ON" position to switch on the chiller.
  • Press the left-side bottom key on the display.

Powering On the Machine

  • Turn the main switch to the "I" position or "ON".
  • Press the reset key.

Initializing the Machine

  • Press the key on the first control panel to switch on the pump motor.
  • Switch on the chiller automatically and set the temperature to 50°C.
  • Press the key on the first control panel to switch on the heating.

Uploading the TPO Program

  • Select the option to upload the TPO program from the Compact Flash disk.
  • Read in the complete program and select "Y" to confirm.

Preparing for Injection

  • Check the cylinder temperature before proceeding.
  • Clean the nozzle tip to ensure proper function.

Purging and Measuring

  • Purge the system with a sample at least 3 times to ensure proper function.
  • Measure the sample capacity to ensure accurate results.

Setting Up the Mold

  • Use the injection unit to touch the mold for zero setting.
  • Close the mold and ensure it reaches the position 0.00.

Running the First Cycle

  • Close the mold after measuring the sample.
  • Press the manual/auto key to switch to automatic mode (LED lights up).
  • Open the safety door and immediately close it to start the first cycle.

Harvesting Specimens

  • When the mold opens, open the safety door and remove the specimen.
  • Approximately 20 pieces are needed for the process.

Changing Materials

  • After preparing the necessary specimens, change the material.

Switching to Manual Mode

  • Select "manual" mode (f042) and press the corresponding key.
  • The nozzle will retract and stop.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

Description

This quiz covers the process of setting up an injection molding machine, including switching on the chiller, main power, and heaters. It also involves collecting specimens after the first 10 shots and the requirements for measuring VST using an Instron AN-50.

More Like This

The Injection Molding Process Quiz
8 questions
Injection Molding Quiz
5 questions
Molding and Plastic Injection with A. BEROUAKEN
10 questions
Use Quizgecko on...
Browser
Browser