Hoffman Estates Fire Department Standpipe Guidelines
22 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary reason for connecting the exterior standpipe siamese or storz connection?

  • To supply water to the initial attack companies
  • To maintain a continuous flow of water for the standpipe system (correct)
  • To test the building's plumbing system
  • To provide a means of escape for occupants
  • What type of connection should be used to connect the 5” LDH to the building's standpipe system?

  • Direct connection to the standpipe outlet
  • Storz connection (correct)
  • Siamese connection
  • Hydrant connection
  • How many people should be in a company when entering a building with standpipe equipped target hazard buildings?

  • At least three people
  • At least two people (correct)
  • At least one person
  • At least four people
  • What is the purpose of laying the backup line in the same stairwell as the initial attack line?

    <p>To ensure a clear escape route</p> Signup and view all the answers

    Where should the initial attack lines be connected to?

    <p>The standpipe outlet on the floor below the interior attack line</p> Signup and view all the answers

    What is the purpose of the 2 ½” apartment pack?

    <p>To support the interior attack line</p> Signup and view all the answers

    What is the preferred method of extinguishment in a standpipe equipped building?

    <p>Using the standpipe system</p> Signup and view all the answers

    Who determines the plan of attack in a standpipe equipped building?

    <p>The Company Officer</p> Signup and view all the answers

    What is the responsibility of the first engine company in a standpipe equipped building?

    <p>To connect to the exterior standpipe siamese or storz connection</p> Signup and view all the answers

    In what situation would the second engine company be responsible for supplying the siamese system?

    <p>When the initial engine is at 2 personnel</p> Signup and view all the answers

    What is used to connect directly to a storz connection?

    <p>A 5&quot; LDH</p> Signup and view all the answers

    Why may a second 1-3/4" or 2-1/2" apartment pack be added to the initial attack line?

    <p>To ensure reach in a large building</p> Signup and view all the answers

    What must be communicated if conditions do not allow the use of the standpipe on the fire floor?

    <p>Which standpipe the primary attack line used</p> Signup and view all the answers

    How many personnel should enter the building with a hand pump or water extinguisher?

    <p>Two</p> Signup and view all the answers

    What is the primary responsibility of the first engine company at a fire scene with standpipe systems?

    <p>To secure a continuous water supply and attach attack lines to the standpipe outlet on the fire floor.</p> Signup and view all the answers

    In the event that the standpipe cannot be used on the fire floor, what must be clearly communicated?

    <p>Which standpipe the primary attack line is being used from.</p> Signup and view all the answers

    What should the second engine company do during a fire scene operation involving standpipes?

    <p>Connect a backup line to the standpipe connection on the floor below the primary attack line.</p> Signup and view all the answers

    What defines the target hazard buildings in relation to standpipe operations?

    <p>Buildings equipped with standpipe systems, as outlined in response guidelines.</p> Signup and view all the answers

    What is the fundamental premise underlying the guidelines for engine companies responding to a fire scene?

    <p>Engine company personnel must function as a single attack team.</p> Signup and view all the answers

    When was the Standpipe Guidelines effective as per the stated guidelines?

    <p>January 1, 2022</p> Signup and view all the answers

    According to the Standpipe Guidelines, what should be done if the first engine company has inadequate manpower?

    <p>Use the standpipe only if conditions allow.</p> Signup and view all the answers

    Which connection option must the first engine company use to secure a water supply for the standpipe system?

    <p>Standpipe siamese or storz connection.</p> Signup and view all the answers

    Study Notes

    Standpipe Guidelines

    Purpose

    • These guidelines are for engine companies and fire suppression units involved in interior attacks on buildings with standpipe systems.
    • The goal is for engine company personnel to function as a single attack team.

    Policy

    • The first engine company is responsible for securing a continuous water supply to the standpipe system through the standpipe siamese or storz connection.
    • They must attach interior attack lines to the standpipe outlet on the fire floor.
    • If the standpipe on the fire floor cannot be used, the primary attack line must be communicated.
    • The second engine company is responsible for connecting a backup line to the standpipe connection on the floor below the primary attack line.
    • They must also secure a continuous water supply to the standpipe siamese or storz connection for target hazard buildings.

    Procedure

    First Engine Company

    • Connect to the exterior standpipe siamese or storz connection and maintain a continuous water supply.
    • Enter the building with a hand pump or water extinguisher and two 1-3/4" apartment packs (with two personnel).
    • Connect a 1-3/4" interior attack line to a standpipe outlet on the fire floor and attack the fire.

    Second Engine Company

    • Take over supplying the siamese system if the first engine has only two personnel (no matter the building type).
    • Connect the exterior standpipe siamese or storz connection and maintain a continuous water supply for target hazard buildings.
    • Enter the building with two 1-3/4" apartment packs and one 2-1/2" apartment pack (with at least two personnel).
    • Connect two 1-3/4" (and/or a 2-1/2" line) interior attack lines to the standpipe outlet on the floor below the primary attack line and backup the initial attack companies.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Description

    This quiz tests your knowledge of the Hoffman Estates Fire Department's Standard Operating Guidelines for Fire Scene Operations, specifically focusing on standpipe operations.

    More Like This

    TN 101.1.5- Standpipe Operations
    58 questions

    TN 101.1.5- Standpipe Operations

    ProtectiveJackalope4164 avatar
    ProtectiveJackalope4164
    Chapter 06: pg 148-156 Sprinkler Systems
    73 questions
    Standpipe Operations Basics Quiz
    10 questions
    Ch 6 pg 152-156
    31 questions

    Ch 6 pg 152-156

    HeavenlyAntimony5079 avatar
    HeavenlyAntimony5079
    Use Quizgecko on...
    Browser
    Browser