Heritage Conservation: UDCPR Provisions

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

To which areas do the heritage conservation provisions of UDCPR apply?

  • Only notified urban areas
  • All areas within planning authorities and regional plans (correct)
  • Only Municipal Corporations
  • Only Regional Plan areas

Who is primarily responsible for preparing the list of heritage buildings?

  • Local Historical Society
  • Heritage Committee alone
  • State Government
  • Planning Authority on advice of Heritage Committee (correct)

What procedural step is essential before finalizing the heritage list?

  • Supreme Court approval
  • Public hearing after issuing notice to owners (correct)
  • No consultation is needed
  • Only government gazette publication

To whom is the finalized heritage list submitted for ultimate approval?

<p>State Government (B)</p> Signup and view all the answers

When listing a heritage structure, is modification under Section 37 (DP) or Section 20 (RP) generally required?

<p>No (D)</p> Signup and view all the answers

Under what conditions can a structure failing to meet defined heritage characteristics be included in the heritage list?

<p>No (C)</p> Signup and view all the answers

What is the designated name for the mandatory document created for each heritage building?

<p>Heritage List Card (C)</p> Signup and view all the answers

Who is responsible for authenticating the Heritage List Card?

<p>Authorized Heritage Conservationist (B)</p> Signup and view all the answers

What critical information must the Heritage Conservationist document during a site visit?

<p>Significance and grading justification (A)</p> Signup and view all the answers

What is the primary objective of grading a heritage building?

<p>To define its conservation and protection level (C)</p> Signup and view all the answers

Flashcards

UDCPR heritage provisions apply to which areas?

Applies to all areas within planning authorities and regional plans.

Who prepares the heritage building list?

The Planning Authority, advised by the Heritage Committee, prepares the list.

What process precedes finalizing the heritage list?

A public hearing after issuing notice to owners is required.

Who approves the finalized heritage list?

The finalized heritage list is sent to the State Government for approval.

Signup and view all the flashcards

Is modification required to list a heritage structure?

No modification is required to list a heritage structure.

Signup and view all the flashcards

Can non-compliant structures be listed?

A structure must comply with defined heritage characteristics to be included.

Signup and view all the flashcards

What document is created for each heritage building?

A 'Heritage List Card' must be created for each building.

Signup and view all the flashcards

Who authenticates the Heritage List Card?

An Authorized Heritage Conservationist must authenticate the Heritage List Card.

Signup and view all the flashcards

What does the Heritage Conservationist document?

The Heritage Conservationist includes significance and grading justification.

Signup and view all the flashcards

What is the main purpose of grading a heritage building?

To define its conservation and protection level.

Signup and view all the flashcards

Study Notes

  • These MCQs relate to heritage conservation provisions as per UDCPR (Unified Development Control and Promotion Regulations).

Application of Heritage Conservation Provisions

  • Heritage conservation rules apply to all areas within planning authorities and regional plans.

Heritage List Preparation

  • The Planning Authority, with advice from the Heritage Committee, is responsible for preparing the list of heritage buildings.

Process Before Finalizing Heritage List

  • Before finalizing the heritage list, a public hearing must be held after issuing a notice to owners.

Approval of Finalized Heritage List

  • The finalized heritage list is sent to the State Government for approval.

Modification Requirement for Listing

  • Listing a heritage structure does not require modification under Section 37 (DP) or Section 20 (RP).

Inclusion of Non-Compliant Structures

  • Structures not complying with defined heritage characteristics cannot be included in the list.

Heritage Building Documentation

  • A "Heritage List Card" must be created for each heritage building.

Authentication of Heritage List Card

  • An Authorized Heritage Conservationist must authenticate the Heritage List Card.

Site Visit Documentation by Conservationist

  • The Heritage Conservationist must include the significance and grading justification in their site visit documentation.

Purpose of Grading

  • The main purpose of grading a heritage building is to define its conservation and protection level.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

More Like This

UDCPR Regulations 7.2, 7.3, 7.4
20 questions
UDCPR Regulation 7.2: Land Surrender & FSI
20 questions
UDCPR Regulation 7: EWS/LIG Housing
10 questions
Use Quizgecko on...
Browser
Browser