What is the purpose of blocking in the 180 psig steam at the Stripper Tower Feed Preheater (13EX-2339)?

  • To prevent excessive temperatures in the Stripper Tower. (correct)
  • To increase the pressure within the Stripper Tower.
  • To prevent backflow through a possible failed check valve.
  • To ensure proper operation of the Stripper Tower.

What is the purpose of shutting down the Hydrogen Compressor (13C-101/102)?

  • To reduce the pressure within the Reactors.
  • To bring the Unit to a safe state. (correct)
  • To prevent excessive temperatures in the Stripper Tower.
  • To prevent backflow through a possible failed check valve.

What is the first step in the Supplementary Actions?

  • Close isolation valves on the lean amine supply.
  • Shut down all applicable pumps.
  • Block in the discharges of the Feed Charge Pumps. (correct)
  • Monitor instrument air pressure.

What is the purpose of closing the isolation valves on the lean amine supply to the Absorber (13PV-2306)?

<p>To isolate the Absorber from the rest of the unit. (A)</p> Signup and view all the answers

What is the primary concern after the Unit has been shut down and stabilized?

<p>Assessing the condition of the Unit. (C)</p> Signup and view all the answers

What is the first step to take in the event of a loss of instrument air in the #3 HDS unit?

<p>Close isolation valves for the lean amine supply and rich amine exiting the Absorber. (C)</p> Signup and view all the answers

What should be done once instrument air has returned, depending on the duration of the outage?

<p>Evaluate the unit condition to decide whether to continue shutting down or prepare for start-up. (A)</p> Signup and view all the answers

Which of the following procedures are referenced for unit shutdown and start-up after an emergency shutdown?

<p>SOP-3HDS-201 and SOP-3HDS-102 (C)</p> Signup and view all the answers

What is the primary purpose of the Sinclair LOTO procedure?

<p>To safely isolate and energy sources to equipment before starting maintenance. (A)</p> Signup and view all the answers

What is the recommendation regarding this document after the procedure is completed?

<p>It should be discarded. (B)</p> Signup and view all the answers

Where should non-essential personnel go when there is a loss of instrument air in the #3 HDS Unit?

<p>To the nearest safe location outside the unit area (C)</p> Signup and view all the answers

What is the initial action to take when the unit depressurizing valve malfunctions and goes to a failed open position?

<p>Block the inlet valve to the depressurizing valve (B)</p> Signup and view all the answers

What happens to the control valves on the #3 HDS Unit when instrument air is removed?

<p>They automatically revert to a fail-safe position (D)</p> Signup and view all the answers

Which of the following departments should NOT be notified in case of instrument air loss in the #3 HDS Unit?

<p>Production Department (D)</p> Signup and view all the answers

What is the primary concern in cases of extreme pressure drop in the #3 HDS Unit?

<p>Major liquid swing throughout the entire unit (D)</p> Signup and view all the answers

Flashcards

Instrument Air Loss Notification

Immediate notification to all personnel to evacuate the unit area.

Departments to Notify

Key departments that must be informed about the loss of instrument air.

Control Valve Fail Safe

Control valves revert to a safe position when air pressure is lost.

Immediate Actions on Valve Failure

Block the inlet valve if the depressurizing valve fails open.

Signup and view all the flashcards

Condition Assessment

Check the unit's condition and block fuel gas valves after air loss.

Signup and view all the flashcards

Closing Isolation Valves

Shut off lean and rich amine supply to the Absorber.

Signup and view all the flashcards

Evaluating Unit Condition

Assess unit state after instrument air restoration to decide next steps.

Signup and view all the flashcards

Preparation for Maintenance

Use Sinclair LOTO and safety policies before equipment work.

Signup and view all the flashcards

SOP-3HDS-201

Standard Operating Procedure for Normal Unit Shutdown.

Signup and view all the flashcards

SOP-3HDS-102

Standard Operating Procedure for Normal Unit Start-up after Emergency Shut Down.

Signup and view all the flashcards

Hydrogen Compressor Shutdown

The action of shutting down Hydrogen Compressors (13C-101/102) during an emergency.

Signup and view all the flashcards

Pump Shutdown

The process of shutting down all applicable pumps to ensure safety during emergencies.

Signup and view all the flashcards

Monitor Reactor Temperatures

Closely observing temperatures in the reactors (13PV-2301/2302) during an emergency.

Signup and view all the flashcards

Block Feed Charge Pumps

Blocking in the discharges of the Feed Charge Pumps (13P-101/102) to prevent backflow.

Signup and view all the flashcards

Close Isolation Valves

Shutting isolation valves for amine supply and exit to control chemical flow.

Signup and view all the flashcards

More Like This

Hydrogen Compression Systems Overview
45 questions
#3 HDS and #1 ARU Valves
23 questions

#3 HDS and #1 ARU Valves

ResoundingDystopia3669 avatar
ResoundingDystopia3669
Hydrogen Compression System in HDS Unit #3
36 questions
Use Quizgecko on...
Browser
Browser