Grid Integration Study and Variable Renewable Energy Resources Quiz
9 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is a primary goal of a grid integration study?

  • Eliminating all variability and uncertainty in power systems
  • Maximizing electricity demand
  • Addressing stakeholder concerns about reliability and cost-effectiveness under high-RE scenarios (correct)
  • Promoting only hydropower resources
  • Why do grid integration studies typically focus on wind and solar resources?

  • Because they are the least variable renewable energy resources
  • Because they pose distinct operational challenges for power systems (correct)
  • Because they are the most expensive renewable energy resources
  • Due to their stability and predictability
  • What makes wind and solar resources challenging for power systems?

  • Their high predictability
  • Their variability and uncertainty (correct)
  • Their low cost
  • Their constant output
  • What is a primary objective of a grid integration study?

    <p>Identifying future generation and transmission portfolios for achieving RE targets</p> Signup and view all the answers

    In a grid integration study, what aspect does a grid impact study typically focus on?

    <p>Assessing the technical feasibility of interconnecting a single wind or solar power plant</p> Signup and view all the answers

    What distinguishes a grid integration study from a grid connection study?

    <p>Grid integration studies focus on system-level impacts, while grid connection studies focus on individual power plants</p> Signup and view all the answers

    Which statement best describes the purpose of a grid impact study?

    <p>Assessing the technical feasibility of interconnecting a single wind or solar power plant</p> Signup and view all the answers

    What key aspect does a grid integration study assess?

    <p>Reliability constraints associated with different renewable energy scenarios</p> Signup and view all the answers

    What is NOT a primary purpose of a grid integration study?

    <p>Simulating the operation of a single wind power plant at different timescales</p> Signup and view all the answers