What is the installed capacity of the Tg Kidurong Power Station?
What is the installed capacity of the Tg Kidurong Power Station?
- 105 MW
- 413 MW
- 492 MW (correct)
- 117 MW
Which power plant has been in commercial operation since 1991?
Which power plant has been in commercial operation since 1991?
- Unit 12 & 13 CCGT (GT26 + STF 30)
- Unit 1 to 5 (GE Frame 6 Gas Turbine) (correct)
- Unit 7,8 & 9 CCGT (Frame 9 + STG)
- Unit 10 & 11 CCGT (GT26 + STF 30)
Which power plant has the latest view of New Block 1 & 2 CCGT?
Which power plant has the latest view of New Block 1 & 2 CCGT?
- Unit 10 & 11 CCGT (GT26 + STF 30) (correct)
- Unit 1 to 5 (GE Frame 6 Gas Turbine)
- Unit 12 & 13 CCGT (GT26 + STF 30)
- Unit 7,8 & 9 CCGT (Frame 9 + STG)
Which company operates the Tg Kidurong Power Station?
Which company operates the Tg Kidurong Power Station?
What is the capacity of Unit 12 & 13 in the Tg Kidurong Power Station?