For a building project, the types and quality of materials, methods of construction, and location of the structure are included in the?

specifications

Which of the following would not be shown on a floor plan?

  • Doors
  • Walls
  • Footings (correct)
  • Windows
  • Which of the following drawings show the location of floor openings for stairways?

  • Roof plan
  • Site plan
  • Elevation plan
  • Floor plan (correct)
  • When constructing wall panels for a platform-framed structure, the wall panels?

    <p>are assembled on the subfloor</p> Signup and view all the answers

    After raising a wall panel for a platform frame, the panel should first be fastened to the?

    <p>subfloor</p> Signup and view all the answers

    The type of construction where each floor of a structure is built as an individual unit is?

    <p>platform framing</p> Signup and view all the answers

    Sill plates are normally made from?

    <p>2 x 8 lumber</p> Signup and view all the answers

    Building codes require any components in contact with the ground, masonry, or concrete, such as sill plates, to be?

    <p>made from treated lumber</p> Signup and view all the answers

    For a given size, the type of support with the most strength is the?

    <p>steel I-beam</p> Signup and view all the answers

    A rule of thumb for constructing girder pockets is that the pocket should be at least ___ wider than the girder and the girder must have a bearing on the wall of at least?

    <p>1&quot;; 4&quot;</p> Signup and view all the answers

    Which of the following is not an advantage of the metal web floor truss?

    <p>They are more widely used than wood web trusses</p> Signup and view all the answers

    Before starting to install sill plates,?

    <p>check the foundation for squareness</p> Signup and view all the answers

    Why is the first floor usually framed before the foundation is backfilled?

    <p>To help the foundation withstand lateral pressure</p> Signup and view all the answers

    The level of the building's floors and walls will be affected if the sill plate is?

    <p>not level</p> Signup and view all the answers

    To check for level of a sill plate, which tool is not typically recommended?

    <p>Plumb bob</p> Signup and view all the answers

    When nailing a rim joist to the sill plate, use?

    <p>8d nails at 6&quot; OC</p> Signup and view all the answers

    When installing a built-up beam, the joints should be positioned?

    <p>directly over support columns</p> Signup and view all the answers

    When installing a joist, end-nail it to the header joist and toenail it to the?

    <p>sill plate</p> Signup and view all the answers

    In which of the following situations would double floor joists not be needed?

    <p>Under loadbearing interior walls running perpendicular to the joists</p> Signup and view all the answers

    The two header joists and the two end joists form the?

    <p>rim joist</p> Signup and view all the answers

    When framing a floor opening, the short pieces installed parallel to the common joists are called?

    <p>tail joists</p> Signup and view all the answers

    The bottom ends of cross-bridging are not nailed in place until?

    <p>the subfloor is installed</p> Signup and view all the answers

    When installing 4' x 8' subfloor panels, how far should you measure in from one side of the rim joist?

    <p>4'</p> Signup and view all the answers

    Decks or porches that are extending over a foundation wall, and are unsupported beyond the wall, are called?

    <p>cantilevered</p> Signup and view all the answers

    The document listing the types and dimensions of materials needed for a job is called the?

    <p>material takeoff</p> Signup and view all the answers

    How many lineal feet of 2 x 8 sill material are needed for a 60'x28'?

    <p>176'</p> Signup and view all the answers

    How many lineal feet of 2 x 12s are needed for 60' of beam? Use three 2x12s.

    <p>180'</p> Signup and view all the answers

    How many 4' x 8' panels of subflooring are needed for a 60'x28'?

    <p>53</p> Signup and view all the answers

    Long pans or dome pans are used to form voids on the underside of slabs in?

    <p>concrete joist systems</p> Signup and view all the answers

    Modular panel and pedestal (access floor) systems are used?

    <p>where a large amount of cabling is required</p> Signup and view all the answers

    Study Notes

    Building Specifications and Planning

    • Specifications include the types and quality of materials, construction methods, and structure location.
    • Floor plans show the layout of spaces but do not display footings.

    Floor Layout and Construction

    • Floor plans indicate the location of floor openings for stairways.
    • Wall panels in platform-frame structures are assembled on the subfloor.
    • After raising a wall panel, secure it first to the subfloor.

    Types of Framing and Materials

    • Platform framing features individual units for each floor, enhancing construction flexibility.
    • Sill plates are typically made from 2 x 8 lumber and must be treated when in contact with ground-related materials.
    • Steel I-beams provide the greatest strength for structural support compared to other materials.

    Construction Guidelines

    • Girder pockets should be at least 1 inch wider than the girder, with a minimum wall bearing of 4 inches.
    • The foundation's squareness should be checked before installing sill plates to ensure proper alignment.
    • The first floor is framed prior to backfilling to help the foundation bear lateral pressure.

    Leveling and Installation Techniques

    • A level sill plate is crucial as any imbalance affects the overall structure.
    • A plumb bob is not the recommended tool for checking a sill plate’s level.
    • Use 8d nails at 6-inch on-center spacing when nailing a rim joist to the sill plate.

    Joist and Beam Installation

    • Joints of built-up beams should align over support columns for optimal strength.
    • Joists should be end-nailed to the header joist and toenailed to the sill plate.
    • Double floor joists are unnecessary under load-bearing interior walls that run perpendicular to joists.

    Framing Openings and Components

    • The rim joist is formed by two header joists and two end joists.
    • Tail joists are short pieces installed parallel to common joists when framing floor openings.

    Bridging and Subfloor Installation

    • Bottom ends of cross-bridging remain un-nailed until after subfloor installation.
    • When placing 4' x 8' subfloor panels, measure 4 feet from one side of the rim joist for proper alignment.

    Structural Features

    • Cantilevered decks or porches extend unsupported over foundation walls, requiring specific construction techniques.
    • A material takeoff document summarizes required materials with dimensions for a job.

    Measurement and Material Requirements

    • For a 60' x 28' construction, 176 feet of 2 x 8 sill material is needed.
    • Three 2 x 12s for a 60-foot beam necessitate 180 feet of material.
    • A total of 53 panels of 4' x 8' subflooring is required for the same 60' x 28' area.

    Advanced Systems

    • Concrete joist systems use long pans or dome pans to create voids underneath slabs.
    • Modular panel and pedestal systems are optimal in environments demanding extensive cabling infrastructures.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge of floor system terminology with these flashcards. Each card presents a word related to building construction, along with its definition, helping you grasp essential concepts in the field. Perfect for students and professionals alike.

    More Like This

    HR OPS GROUND FLOOR OPS 67-81
    44 questions
    Post Tension Concrete Floor Systems
    42 questions

    Post Tension Concrete Floor Systems

    SweetheartMandelbrot1035 avatar
    SweetheartMandelbrot1035
    Use Quizgecko on...
    Browser
    Browser