Questions and Answers

During the annual testing of the pump, the pressure achieved should be what percentage of the design pressure?

  • 65% (correct)
  • 75%
  • 100%
  • 50%

What is the required flow rate during the annual testing compared to the design flow rate?

  • 150% of the design flow rate (correct)
  • 175% of the design flow rate
  • 125% of the design flow rate
  • 100% of the design flow rate

What is the design flow rate if the pressure is 600 kPa and the flow rate is 15,000 L/m?

  • 12,000 L/m
  • 10,000 L/m
  • 15,000 L/m (correct)
  • 20,000 L/m

What is the required flow rate during the annual testing if the pressure achieved is 390 kPa?

<p>22,500 L/m (C)</p> Signup and view all the answers

What is the normal practice for testing fire pumps, in addition to the annual capacity testing?

<p>Running the fire pumps for a short time on a regular schedule (C)</p> Signup and view all the answers

What is the minimum requirement for testing fire pumps?

<p>Annual capacity testing (C)</p> Signup and view all the answers

Which of the following components is NOT involved in the annual testing of the pump?

<p>Storage tank (C)</p> Signup and view all the answers

What is the pressure required to be achieved during the annual testing if the design pressure is 500 kPa?

<p>325 kPa (D)</p> Signup and view all the answers

What is the required flow rate during the annual testing if the design flow rate is 20,000 L/m?

<p>30,000 L/m (D)</p> Signup and view all the answers

How often is it recommended to test run the fire pumps (not a capacity test) to ensure they are ready and able to start in an emergency?

<p>Weekly (A)</p> Signup and view all the answers

During the annual testing of the pump, what is the required flow rate if the pressure achieved is 455 kPa?

<p>27,000 L/m (C)</p> Signup and view all the answers

What is the design pressure if the required pressure during the annual testing is 390 kPa?

<p>600 kPa (D)</p> Signup and view all the answers

What is the required flow rate during the annual testing if the design pressure is 520 kPa?

<p>18,000 L/m (B)</p> Signup and view all the answers

What is the required pressure during the annual testing if the design flow rate is 20,000 L/m?

<p>520 kPa (D)</p> Signup and view all the answers

What is the design flow rate if the required pressure during the annual testing is 715 kPa?

<p>18,000 L/m (D)</p> Signup and view all the answers

What is the required pressure during the annual testing compared to the design pressure?

<p>65% (C)</p> Signup and view all the answers

What is the required flow rate during the annual testing compared to the design flow rate?

<p>85% (C)</p> Signup and view all the answers

Which of the following components is involved in the annual testing of the pump?

<p>Orifice (A)</p> Signup and view all the answers

What is the minimum requirement for testing fire pumps?

<p>Annual capacity testing (D)</p> Signup and view all the answers

How often is it recommended to test run the fire pumps (not a capacity test) to ensure they are ready and able to start in an emergency?

<p>Weekly (D)</p> Signup and view all the answers

During the annual testing of the pump, what is the required flow rate if the pressure achieved is 520 kPa?

<p>25,000 L/m (B)</p> Signup and view all the answers

What is the design flow rate if the required pressure during the annual testing is 390 kPa?

<p>10,000 L/m (D)</p> Signup and view all the answers

What is the required pressure during the annual testing compared to the design pressure?

<p>65% (B)</p> Signup and view all the answers

What is the normal practice for testing fire pumps, in addition to the annual capacity testing?

<p>Testing the pump speed (A)</p> Signup and view all the answers

How often is it recommended to test run the fire pumps (not a capacity test) to ensure they are ready and able to start in an emergency?

<p>Weekly (B)</p> Signup and view all the answers

What is the required flow rate during the annual testing if the design flow rate is 20,000 L/m?

<p>25,000 L/m (C)</p> Signup and view all the answers

What is the required flow rate during the annual testing compared to the design flow rate?

<p>65% (D)</p> Signup and view all the answers

What is the required pressure during the annual testing if the design flow rate is 20,000 L/m?

<p>260 kPa (C)</p> Signup and view all the answers

What is the required flow rate during the annual testing if the design pressure is 520 kPa?

<p>25,000 L/m (B)</p> Signup and view all the answers

What is the required pressure during the annual testing if the design flow rate is 15,000 L/m?

<p>520 kPa (A)</p> Signup and view all the answers

Related Documents

Fire Protection Systems PDF

More Like This

3A2E3 C15 Obj 1
30 questions
3A2E3 C15 Obj 4
40 questions
3A2E3 C15 Obj 6
15 questions
3A2E3 C15 Obj 7
21 questions
Use Quizgecko on...
Browser
Browser