What is required from the Owner when additional services are rendered by the Architect?

  • No additional payment is required
  • A percentage of the total project cost must be paid
  • Additional compensation must be provided (correct)
  • A fee for consultation must be paid
  • Who is responsible for recommending additional service providers for the project?

  • The Owner
  • The local government
  • The contractor
  • The Architect (correct)
  • What must the Owner do if the Architect's work is abandoned or suspended?

  • The Owner must pay a fine
  • The Architect must refund the Owner for previous payments
  • The Owner must pay for services rendered up to that point (correct)
  • The Owner is not liable for any payments
  • Which of the following is a condition that should be stated in the contract?

    <p>Charges for additional sets of Contract Documents must be paid by the Owner</p> Signup and view all the answers

    What is required for travel expenses when the Architect works beyond 50 kilometers from their office?

    <p>Both per diem and travel expenses are chargeable</p> Signup and view all the answers

    What happens if the Owner orders changes after approving the Architect’s outputs?

    <p>The Owner must pay for extra time and resources</p> Signup and view all the answers

    What is the condition regarding the charges for services rendered during different construction periods?

    <p>Charges must be adjusted proportionately based on work burden</p> Signup and view all the answers

    Which type of presentation is recommended by the Architect for Owner’s approval if necessary?

    <p>Scale and 3D models, and walk-thru presentations</p> Signup and view all the answers

    What is the main focus of the Project Definition Phase?

    <p>Defining the project requirements</p> Signup and view all the answers

    During which phase is the initial statement of probable construction cost prepared?

    <p>Project Definition Phase</p> Signup and view all the answers

    What is created in the Schematic Design Phase?

    <p>Conceptual plans and design studies</p> Signup and view all the answers

    Which document outlines specifications for size and character of the project?

    <p>Design Development Documents</p> Signup and view all the answers

    What is expected to be submitted to the Owner at the end of the Design Development Phase?

    <p>Updated Statement of the Probable Project Construction Cost</p> Signup and view all the answers

    Which phase primarily involves consultation to define project requirements?

    <p>Project Definition Phase</p> Signup and view all the answers

    What key activity occurs during the Schematic Design Phase?

    <p>Evaluating the Owner’s program and proposing project methods</p> Signup and view all the answers

    What is the basis for the Contract Document Phase?

    <p>Approved Design Development Documents</p> Signup and view all the answers

    What is the primary role of the Architect during the construction phase concerning claims made by the Owner and Contractors?

    <p>Making decisions on all claims related to work execution</p> Signup and view all the answers

    Which action is NOT part of the Architect's responsibilities during the construction phase?

    <p>Carrying out full-time inspections personally</p> Signup and view all the answers

    How can the Architect enter into a contract with the Owner?

    <p>Through a combination of single and sub-consultancy contracts</p> Signup and view all the answers

    What characterizes the classification of professional architectural work?

    <p>The complexity and creative skill required</p> Signup and view all the answers

    What is a responsibility of the Architect concerning periodic site visits during the construction phase?

    <p>To ensure work proceeds according to the Contract Documents</p> Signup and view all the answers

    What should be provided to the Owner when the Contractor is required to give written guarantees?

    <p>Written guarantees from Contractors and Sub-Contractors</p> Signup and view all the answers

    When extensive inspection is required, what is the protocol followed by the Architect?

    <p>Hire a full-time construction supervisor in agreement with the Owner</p> Signup and view all the answers

    How are the charges for architectural services determined?

    <p>According to the degree of project complexity and skill required</p> Signup and view all the answers

    Which of the following methods of compensation is primarily based on technical hours spent?

    <p>Direct Personnel Expenses</p> Signup and view all the answers

    What is the typical multiplier for compensation depending on the complexity of the project?

    <p>1.5 to 2.5</p> Signup and view all the answers

    Which group receives 10% of the Project Construction Cost according to the compensation groups?

    <p>Group 5</p> Signup and view all the answers

    For repetitive construction, what percentage does the second structure receive compared to the minimum basic fee?

    <p>80%</p> Signup and view all the answers

    In which group is the fee for a housing project defined as a percentage of the Project Construction Cost?

    <p>Group 7</p> Signup and view all the answers

    What is the minimum fee for expert testimony according to the compensation structure?

    <p>PHP 500 per hour</p> Signup and view all the answers

    What is considered reimbursable expense under the methods of compensation?

    <p>Per diem and transportation costs</p> Signup and view all the answers

    Which group is assigned a fee of 15% of the Project Construction Cost for extensive details?

    <p>Group 8</p> Signup and view all the answers

    Which group includes buildings such as auditoriums and hospitals?

    <p>Group 3</p> Signup and view all the answers

    What types of buildings are categorized under Group 2?

    <p>Art galleries and nursing homes</p> Signup and view all the answers

    In which group would you classify a nursing home?

    <p>Group 2</p> Signup and view all the answers

    Which group is meant for repetitive construction of similar buildings?

    <p>Group 6</p> Signup and view all the answers

    What characterizes the buildings in Group 5?

    <p>Monumental and specialized</p> Signup and view all the answers

    Which group encompasses alterations and renovations to existing buildings?

    <p>Group 9</p> Signup and view all the answers

    What is the primary basis for the architect's compensation?

    <p>Type and level of services</p> Signup and view all the answers

    Group 8 projects involve which of the following?

    <p>Extensive detail in design</p> Signup and view all the answers

    Which of the following buildings would NOT be found in Group 1?

    <p>Banks</p> Signup and view all the answers

    What does the method of compensation described as 'MULTIPLE OF DIRECT PERSONNEL EXPENSES' apply to?

    <p>Non-creative work</p> Signup and view all the answers

    What type of buildings are included in Group 7?

    <p>Housing projects with multiple units</p> Signup and view all the answers

    Which project classification group includes recreational facilities?

    <p>Group 2</p> Signup and view all the answers

    Which group includes both simple loft-type buildings and industrial buildings?

    <p>Group 1</p> Signup and view all the answers

    What type of project is classified as Group 10?

    <p>Technical advice on architectural works</p> Signup and view all the answers

    More Like This

    Untitled Quiz
    6 questions

    Untitled Quiz

    AdoredHealing avatar
    AdoredHealing
    Untitled Quiz
    37 questions

    Untitled Quiz

    WellReceivedSquirrel7948 avatar
    WellReceivedSquirrel7948
    Untitled Quiz
    50 questions

    Untitled Quiz

    JoyousSulfur avatar
    JoyousSulfur
    Untitled Quiz
    48 questions

    Untitled Quiz

    StraightforwardStatueOfLiberty avatar
    StraightforwardStatueOfLiberty
    Use Quizgecko on...
    Browser
    Browser