EIA Report of Mumbai Coastal Road: Project Overview and Environmental Impacts
10 Questions
44 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What has resulted from the high growth in the number of vehicles in Mumbai?

  • Reduced traffic congestion
  • No significant impact on the city
  • Long commute times and serious impact on productivity (correct)
  • Improved productivity in the city
  • What is the population of Mumbai?

  • 12.4 million (correct)
  • 15 million
  • 8 million
  • 10 million
  • What has made Mumbai the densest metropolis in the world?

  • High growth in the number of vehicles
  • Presence of sea around the city
  • Lack of comprehensive traffic studies
  • Geographical constraints and inability to expand (correct)
  • What is the main reason behind Mumbai witnessing the worst kind of transport related pollution?

    <p>Extreme traffic congestion</p> Signup and view all the answers

    What were the objectives of the Comprehensive Traffic Studies (CTS) carried out for Mumbai?

    <p>To identify transportation requirements and eliminate existing problems</p> Signup and view all the answers

    What type of soil is found in the suburbs of Mumbai?

    <p>Alluvial soil</p> Signup and view all the answers

    Which rivers drain the area near the Mumbai coast?

    <p>Mahim, Mithi, Dahisar, Polsar</p> Signup and view all the answers

    Who was appointed for the preparation of Feasibility Report, DPR Preparation, Environmental Clearance and Bid process management for the proposed Mumbai Coastal Road Project?

    <p>M/S STUP Consultants Pvt. Ltd and M/S Ernst &amp; Young Pvt. Ltd</p> Signup and view all the answers

    What was the Ministry of Environment, Forest and Climate Change's decision regarding the construction of coastal road by reclamation in Mumbai?

    <p>They allowed construction of coastal road by reclamation in exceptional cases.</p> Signup and view all the answers

    How long did it take to join the original seven islands of Mumbai?

    <p>150 years</p> Signup and view all the answers

    Study Notes

    Mumbai's Urbanization Challenges

    • High growth in the number of vehicles in Mumbai has resulted in severe traffic congestion and air pollution.

    Demographics of Mumbai

    • The population of Mumbai has contributed to it becoming the densest metropolis in the world.

    Environmental Concerns

    • The high volume of vehicles in Mumbai is the main reason behind the city witnessing the worst kind of transport-related pollution.

    Urban Planning Initiatives

    • The Comprehensive Traffic Studies (CTS) were carried out for Mumbai to address urban transportation issues, with objectives including identifying solutions to traffic congestion and pollution.

    Geography of Mumbai

    • The suburbs of Mumbai have a unique type of soil.
    • The area near the Mumbai coast is drained by the Ulhas and Dahisar rivers, among others.

    Mumbai Coastal Road Project

    • The Municipal Corporation of Greater Mumbai (MCGM) appointed a consultant for the preparation of a Feasibility Report, DPR Preparation, Environmental Clearance, and Bid process management for the proposed Mumbai Coastal Road Project.
    • The Ministry of Environment, Forest and Climate Change decided not to allow the construction of a coastal road by reclamation in Mumbai.

    History of Mumbai

    • It took centuries to join the original seven islands of Mumbai.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Study the EIA report of Mumbai Coastal Road, covering the project overview, environmental impacts, ecological assessment, habitat mapping, and more. Understand the potential impacts and remediation measures through EMP, as well as the ecological assessment of the route alignment.

    More Like This

    Eia to London
    10 questions

    Eia to London

    FasterSagacity avatar
    FasterSagacity
    Mitigation in EIA Process
    14 questions

    Mitigation in EIA Process

    InfluentialHarpsichord avatar
    InfluentialHarpsichord
    EIA Topic 4
    41 questions

    EIA Topic 4

    TolerableGyrolite5918 avatar
    TolerableGyrolite5918
    Use Quizgecko on...
    Browser
    Browser