Earthwork Equipment Overview

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

What is the primary function of a hydraulic clamshell?

  • Excavation of foundation pits (correct)
  • Transporting materials over distances
  • Compacting materials
  • Pushing and digging soil

Which piece of equipment is best suited for leveling and finishing grade on construction projects?

  • Dumper
  • Dozer
  • Scaper
  • Grader (correct)

What is the main use of a roller compactor?

  • Transporting large amounts of materials
  • Cutting and collecting spoil
  • Compacting earth and materials (correct)
  • Excavating foundation pits

Which equipment is primarily used for cutting, collecting, and moving large spoil quantities?

<p>Scaper (A)</p> Signup and view all the answers

What selection criterion considers the weather conditions before equipment choice?

<p>Speed of excavation required (C)</p> Signup and view all the answers

What role do dozers mainly serve at a construction site?

<p>Pushing, digging, and leveling (D)</p> Signup and view all the answers

For what condition is dumper equipment most suitable?

<p>Transporting large amounts of material over long distances (D)</p> Signup and view all the answers

What factor is NOT part of the selection criteria for earthwork equipment?

<p>Type of vegetation in the area (C)</p> Signup and view all the answers

What is a primary function of a backhoe?

<p>Loading and unloading materials (C)</p> Signup and view all the answers

Which piece of earthwork equipment is best suited for bulk excavation?

<p>Dragline (D)</p> Signup and view all the answers

What is one of the required actions for persons granted temporary permits during construction?

<p>Paint the ends of the hoardings white (B)</p> Signup and view all the answers

Which of the following is NOT a type of earthwork equipment?

<p>Compactor (C)</p> Signup and view all the answers

What primary function does a roller compactor serve in construction?

<p>Compacting earth (B)</p> Signup and view all the answers

When might vehicular access to a construction site be restricted?

<p>To avoid obstructing traffic flow (A)</p> Signup and view all the answers

Which earthwork equipment is primarily used for leveling uneven ground?

<p>Roller compactor (A)</p> Signup and view all the answers

What is a key factor to consider when selecting construction equipment related to social impacts?

<p>Nuisance from noise and dust (B)</p> Signup and view all the answers

Which factor is NOT considered when selecting construction equipment?

<p>Aesthetic appeal of the equipment (A)</p> Signup and view all the answers

What must a person do if they wish to deposit building materials on the street without permission?

<p>Obtain a temporary permit (C)</p> Signup and view all the answers

Which aspect is crucial when considering safety requirements during equipment selection?

<p>Existing statutory regulations (B)</p> Signup and view all the answers

What is one consequence of not properly securing deposited building materials?

<p>Possible legal penalties from the local authority (C)</p> Signup and view all the answers

Which method can typically reduce carbon emissions when selecting equipment?

<p>Regular maintenance of machinery (B)</p> Signup and view all the answers

What type of permit is required for the erection of scaffolding on a street?

<p>Temporary permit (D)</p> Signup and view all the answers

Which of the following is a requirement for materials deposited on the street?

<p>They must be adequately fenced and enclosed (C)</p> Signup and view all the answers

Flashcards are hidden until you start studying

Study Notes

Earthwork Equipment

  • Hydraulic Clamshell used for excavating foundation pits, deep confined spaces, and loose soils.
  • Dozers primary function is to push, dig, excavate, and level materials, also used for clearing trees and vegetation, can act as towing tractors.
  • Roller Compactor compacts earth and other materials.
  • Scraper cuts, collects, and moves large quantities of spoil across construction sites, also used for site leveling, loading, and hauling.
  • Dumper best suited for transporting large amounts of material over distances both on and off site.
  • Grader primarily used to level and flatten soil surfaces, removing unnecessary layers of soil, dozers are typically used for rough grading while graders are used for finishing.

Earthwork Selection Criteria

  • Quantities of Material: Consider the volume of material to be excavated.
  • Soil Type and Condition: Impact the type of equipment required.
  • Weather Conditions: Poor weather can affect equipment performance and safety.
  • Excavation Speed: The timeline for excavation will influence equipment choice.
  • Excavation Depth: Depending on the depth, certain equipment may be more suitable.
  • Material Disposal Method: How the excavated material is disposed of impacts the process.

Types of Earthwork Equipment

  • Backhoe: Also known as a rear actor, performs digging holes and trenches, excavation, landscaping, breaking up asphalt and concrete, loading and unloading materials, and leveling uneven ground.
  • Front Shovel: Excavates various soil types, digs and loads earth or fragmented rock, depth limitations.
  • Dragline: Best suited for bulk excavation in loose or waterlogged soils below its own track level.
  • Hydraulic Clamshell: See above
  • Dozers: See above
  • Roller Compactor: See above
  • Scraper: See above
  • Dumper: See above
  • Grader: See above

Factors on Selection

  • Labour Consideration: Trained labor availability is key.
  • Safety Requirements: Site safety is essential.
  • Environmental Considerations: Carbon emissions, noise, vibration, and dust impact the environment.
  • Authority Requirements: Adherence to relevant statutory standards, regulations, and guidelines is crucial.

Uniform Building By-Laws

  • Part II (Submission of Plans for Approval) Temporary permits are required for:
    • Erection of builders' working sheds or stores
    • Depositing building materials on streets
    • Erection of scaffolding
    • Hoarding on streets
  • Part IV (Temporary Works in Connection With Building Operations) Commencement of building operation is regulated by By-Laws 48.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

More Like This

Use Quizgecko on...
Browser
Browser