Diverter Switch Insert Handling Guidelines
80 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the first step in connecting the plug connector for tap-change supervisory control?

  • Lift part B of the plug connector out of the bracket. (correct)
  • Place plug connector back in the bracket.
  • Secure leads in retaining clamps.
  • Insert the tap position indicator disc.
  • What is the purpose of the countersunk head screws in the installation of the tap position indicator disc?

  • To attach the panel to the indicator drive shaft.
  • To ensure the tap position indicator disc is horizontally aligned.
  • To secure the tap position indicator disc. (correct)
  • To secure the plug connector in place.
  • Which component is used to secure leads once the plug connector is connected?

  • Retaining clamps. (correct)
  • M5x12/SW8 hexagon screws.
  • Countersunk head screws.
  • Lock tab.
  • How should the tap position indicator disc be inserted during installation?

    <p>Horizontally between the panel and bracket.</p> Signup and view all the answers

    What is required to secure the countersunk head screws during installation?

    <p>Center-punching.</p> Signup and view all the answers

    What hardware is used to secure the panel with bracket onto the indicator drive shaft?

    <p>M5x12/SW8 hexagon screws.</p> Signup and view all the answers

    Which of the following is NOT a step in installing the VACUTAP® VM® diverter switch insert?

    <p>Lift part A of the plug connector out of the bracket.</p> Signup and view all the answers

    What is the final step in the installation process of the tap position indicator?

    <p>Center-punch the countersunk head screws.</p> Signup and view all the answers

    What is the first step in removing the tap position indicator for the version with a multiple coarse change-over selector and a long panel?

    <p>Remove both countersunk head screws.</p> Signup and view all the answers

    Which tool is suggested to lever off the cover disk in the short panel version?

    <p>Flat screwdriver</p> Signup and view all the answers

    What should be done after removing the countersunk head screw in the short panel version?

    <p>Pull the tap position indicator disc out horizontally.</p> Signup and view all the answers

    What component must be removed after pulling the tap position indicator disc out horizontally?

    <p>Hexagon screws and lock tab</p> Signup and view all the answers

    In the long panel version, what is the action to take after removing both countersunk head screws?

    <p>Pull panel and bracket up and off the indicator drive shaft.</p> Signup and view all the answers

    What is the last step mentioned for removing the tap position indicator in both versions?

    <p>Remove both hexagon screws and associated lock tab.</p> Signup and view all the answers

    What is true about the design of the tap position indicator for the version with a short panel?

    <p>It utilizes a single countersunk head screw.</p> Signup and view all the answers

    Which of the following steps is NOT necessary when removing the tap position indicator with a long panel?

    <p>Remove the panel and bracket out from underneath the driving mechanism.</p> Signup and view all the answers

    What should be done to ensure safety when lifting the diverter switch insert?

    <p>Secure the diverter switch insert to prevent it from tipping.</p> Signup and view all the answers

    What is a consequence of not securing the diverter switch insert properly?

    <p>It can result in severe injuries due to tipping.</p> Signup and view all the answers

    How long can the open diverter switch oil compartment be exposed to ambient humidity without causing damage?

    <p>Up to 10 hours can be allowed.</p> Signup and view all the answers

    What is necessary for the proper placement of the diverter switch insert after removal?

    <p>It must be secured against tipping on a level surface.</p> Signup and view all the answers

    What should be removed if the OILTAP® M was supplied before 1981?

    <p>The cover plate above the indicator gear.</p> Signup and view all the answers

    What is the purpose of inserting lifting gear into the diverter switch insert eyebolts?

    <p>To facilitate the removal of the insert safely.</p> Signup and view all the answers

    What can happen if the diverter switch insert remains unstable during handling?

    <p>It can damage the insert or surrounding parts.</p> Signup and view all the answers

    What key precaution should be taken to protect the diverter switch's oil compartment?

    <p>Prevent exposure to ambient humidity for extended periods.</p> Signup and view all the answers

    What is the reversal value for a normal operating time of a VACUTAP® VM® diverter switch?

    <p>7-7.5 hand crank revolutions</p> Signup and view all the answers

    What action should be taken if the protective relay has a tripping value other than 1.2 m/s?

    <p>Replace it with an RS 2001 relay with a tripping value of 1.2 m/s.</p> Signup and view all the answers

    Which monitoring system requires changes for operation with a VACUTAP® VM® diverter switch insert?

    <p>TM100 system</p> Signup and view all the answers

    How many hand crank revolutions correspond to half operating time for a complete diverter switch operation?

    <p>16.5 hand crank revolutions</p> Signup and view all the answers

    What is the purpose of centering the motor-drive unit?

    <p>To ensure the motor-drive unit is properly aligned for optimal performance.</p> Signup and view all the answers

    What should be done if the motor-drive unit's reversal value does not match the specified value?

    <p>Contact Maschinenfabrik Reinhausen Technical Service for assistance.</p> Signup and view all the answers

    What type of relay should be used if the protective relay does not meet the required specifications?

    <p>RS 2001 relay</p> Signup and view all the answers

    What is indicated by the operational instructions concerning TAPMOTION® TD?

    <p>It requires consultation with technical service for transformer ratio tests.</p> Signup and view all the answers

    What immediate action should be taken if there is a fault detected on the on-load tap-changer?

    <p>Ensure there is no damage before using the equipment again.</p> Signup and view all the answers

    Which document should be consulted for additional information regarding the RS 2001 protective relay?

    <p>The operating instructions for the RS 2001 protective relay.</p> Signup and view all the answers

    What should be done if the RS 2001 protective relay or other protective devices have tripped?

    <p>Inform an authorized MR representative or manufacturer.</p> Signup and view all the answers

    Which action is specifically advised after the tripping of a protective relay?

    <p>Remove the diverter switch insert following specific maintenance instructions.</p> Signup and view all the answers

    In the event of tripping the pressure relief device, what should be the next step?

    <p>Remove the diverter switch insert as per maintenance instructions.</p> Signup and view all the answers

    Where can one find the contact information for Maschinenfabrik Reinhausen?

    <p>In the operating instructions or the company’s website.</p> Signup and view all the answers

    What is a recommended protocol if faults on the motor-drive unit cannot be rectified on site?

    <p>Consult the service department or authorized representative.</p> Signup and view all the answers

    What does the presence of faults in the system indicate regarding equipment usage?

    <p>Equipment should be immediately powered off until checked.</p> Signup and view all the answers

    The packaging is suitable for transportation with a stackability of 2000 kg/m2 top surface.

    <p>False</p> Signup and view all the answers

    The wooden crate used for packaging does not allow any parts to touch the loading surface during transport.

    <p>True</p> Signup and view all the answers

    Desiccant is added to the packaged goods to promote moisture retention.

    <p>False</p> Signup and view all the answers

    The packaging symbols include a warning to protect against moisture and indicate that the items are heavy.

    <p>False</p> Signup and view all the answers

    Only authorized personnel should select the sling gear and secure loads exceeding 500 kg in weight.

    <p>True</p> Signup and view all the answers

    The sealed packaging is bonded after the air is fully extracted and the drying agent is added.

    <p>True</p> Signup and view all the answers

    The packaging should allow for impermissible changes in position of the goods inside the crate.

    <p>False</p> Signup and view all the answers

    Walking under a suspended load is permitted only if the load is less than 500 kg.

    <p>False</p> Signup and view all the answers

    In the version with a multiple coarse change-over selector, long panel, both countersunk head screws are removed before pulling the tap position indicator disc out horizontally.

    <p>True</p> Signup and view all the answers

    The tap position indicator disc can be removed vertically from between the panel and the bracket.

    <p>False</p> Signup and view all the answers

    The cover disk can be levered off using a flat screwdriver in the long panel version.

    <p>False</p> Signup and view all the answers

    After removing both hexagon screws, no additional components need to be taken out before pulling the panel and bracket off the indicator drive shaft.

    <p>False</p> Signup and view all the answers

    The procedure for removing the tap position indicator involves pulling the tap position indicator disc outwards instead of horizontally.

    <p>False</p> Signup and view all the answers

    In the removal process of the tap position indicator, workers should use a screwdriver to remove the tap position indicator disc cover.

    <p>True</p> Signup and view all the answers

    Both versions of the tap position indicator require the removal of a lock tab after hexagon screws are taken out.

    <p>True</p> Signup and view all the answers

    The operation of the tap position indicator disc is independent of the type of panel used (long or short).

    <p>False</p> Signup and view all the answers

    The tap-change supervisory control must always use a plug connector in an OILTAP® M with VACUTAP® VM® diverter switch insert.

    <p>True</p> Signup and view all the answers

    The tap-change supervisory control terminal connection can be directly used with a VACUTAP® VM® diverter switch insert.

    <p>False</p> Signup and view all the answers

    It is safe to ensure that there is no supply voltage on the tap-change supervisory control while working on it without additional precautions.

    <p>False</p> Signup and view all the answers

    Red markings on the diverter switch insert must align with yellow markings on the on-load tap-changer head.

    <p>False</p> Signup and view all the answers

    The spring clip is attached to the tap position indicator disc to secure it in place.

    <p>True</p> Signup and view all the answers

    A protective sleeve is installed on the indicator drive shaft to enhance durability.

    <p>True</p> Signup and view all the answers

    It is advised to pull the panel and bracket straight down from the indicator drive shaft.

    <p>False</p> Signup and view all the answers

    One must always contact Maschinenfabrik Reinhausen Technical Service for any assistance with the tap-change supervisory control.

    <p>False</p> Signup and view all the answers

    Securing the carrier plate of the diverter switch insert is one of the initial steps in the installation process.

    <p>False</p> Signup and view all the answers

    Maschinenfabrik Reinhausen Technical Service should be contacted if further clarification is needed regarding the terminal connection's installation.

    <p>True</p> Signup and view all the answers

    The tap position indicator does not contain any spring mechanisms.

    <p>False</p> Signup and view all the answers

    The installation of a VACUTAP® VM® diverter switch insert involves the use of lifting gear in the lugs of the diverter switch insert carrier plate.

    <p>True</p> Signup and view all the answers

    The tap-change supervisory control's terminal connection can remain intact when the VACUTAP® VM® diverter switch insert is installed.

    <p>False</p> Signup and view all the answers

    The diverter switch insert should be pulled out horizontally during its removal process.

    <p>False</p> Signup and view all the answers

    Pulling the tap position indicator disc must be done carefully to avoid damaging the connecting lead.

    <p>True</p> Signup and view all the answers

    The installation manual specifies that the diverter switch insert can be lowered at any speed.

    <p>False</p> Signup and view all the answers

    The minimum permissible dielectric strength Ud during operation for the diverter switch oil is 30 kV/2.5 mm.

    <p>True</p> Signup and view all the answers

    When protective devices have tripped, it is safe to energize the transformer immediately.

    <p>False</p> Signup and view all the answers

    Using conductive and grounded hoses approved for flammable liquids is recommended during maintenance operations.

    <p>True</p> Signup and view all the answers

    The presence of explosive gases is a danger that can occur under the on-load tap-changer cover.

    <p>True</p> Signup and view all the answers

    Impact wrenches can be safely operated during maintenance of the tap-changer.

    <p>False</p> Signup and view all the answers

    The maximum allowable water content in the diverter switch oil is 30 ppm.

    <p>False</p> Signup and view all the answers

    Damage to the on-load tap-changer can occur if the protective relay has not tripped.

    <p>False</p> Signup and view all the answers

    De-energizing all auxiliary circuits is an essential step before removing the on-load tap-changer cover.

    <p>True</p> Signup and view all the answers

    Study Notes

    Removing OILTAP® M Diverter Switch Insert

    • The tap position indicator can be removed through different methods depending on the panel's design.

    • For long panels: Remove both countersunk head screws, then pull the tap position indicator disc horizontally from the panel.

    • After removing the tap position indicator disc, remove hexagon screws and lock tabs before lifting the panel and bracket off the indicator drive shaft.

    • For short panels: Disconnect using a countersunk head screw, then use a flat screwdriver to lever off the cover disk, and pull the tap position indicator disc out horizontally as well.

    Lifting and Handling Precautions

    • Use lifting gear securely attached to the eyebolts before lifting the diverter switch insert.
    • Ensure to lift the insert slowly and vertically while placing it on a level surface to prevent tipping and injuries.
    • The diverter switch oil compartment should not be exposed to humidity for more than 10 hours to protect dielectric strength.

    Installing VACUTAP® VM® Diverter Switch Insert

    • Supervision of tap-change control involves connecting a plug connector and securing it in its bracket.
    • Installation steps include placing a panel with the bracket onto the indicator drive shaft, followed by securing it with hexagon screws.
    • The tap position indicator disc is inserted and secured using countersunk head screws, with a specific method to ensure they are tightened.

    Reversal Values

    • Different operating times are outlined for normal (33 hand crank revolutions corresponds to 1 complete diverter switch operation) and half operations (16.5 hand crank revolutions).
    • Consult technical service if there’s a mismatch in motor-drive unit reversal values.

    Protective Relay and Monitoring Systems

    • A protective relay should be replaced if the tripping value is not 1.2 m/s, with the RS 2001 relay being the recommended replacement.
    • Monitoring systems like TM100 or TAPGUARD® 260 may require modifications for compatibility with the VACUTAP® VM® diverter switch.

    Fault Detection and Troubleshooting

    • Precautionary checks are recommended if faults occur in the on-load tap-changer or motor-drive unit to avoid further damage.
    • For tripping issues involving protective devices, follow the prescribed maintenance instructions and contact Maschinenfabrik Reinhausen GmbH for further assistance.

    Contact Information

    • Maschinenfabrik Reinhausen GmbH offers technical support through various channels, including email and phone, for maintenance and troubleshooting queries.

    Suitability of Packaging

    • Designed for all common types of transportation.
    • Capable of withstanding stackability of up to 1000 kg/m² on the top surface.
    • Packaged in a stable wooden crate, ensuring security during transit and preventing contact with loading surfaces or the ground post-unloading.
    • Inside stabilization of goods to maintain position during movement.
    • Sealed with PE foil completely enclosing the goods, bonded after the inclusion of desiccant and air removal.

    Markings and Symbols

    • Packaging features mandatory symbols for safe transport and storage.
    • Symbols include instructions to protect against moisture and indicate fragile contents.

    Safety Guidelines for Handling Shipments

    • Strict warning against the risk of death or severe injury due to load tipping or falling.
    • Only trained personnel may select sling gear and secure loads.
    • Prohibition against walking under suspended loads.
    • Use only transport equipment with a capacity exceeding 500 kg for lifting operations.

    Instructions for Removing Tap Position Indicator

    • Detailed steps for removing various versions of tap position indicators, involving the removal of screws and careful pulling of components.

    Disconnecting Tap-Change Supervisory Control Lead

    • Warnings regarding fatal risks from explosive gases; ensure no supply voltage is present before disconnecting.
    • Guidelines for handling connection leads safely during maintenance procedures.
    • Special instructions for transitioning connection types when installing specific components.

    Installation of VACUTAP® VM® Diverter Switch Insert

    • Steps for aligning and securing the diverter switch insert during installation are specified for various transformer designs.

    Oil Limit Values for Diverter Switch

    • Established dielectric strength values during operation: minimum of 30 kV and maximum water concentration of 30 ppm.

    Troubleshooting Warnings

    • Emphasis on extreme caution due to risk of explosions and the presence of flammable materials during inspections.
    • Procedures to follow when protective relays indicate potential damage, including checks before re-energizing the transformer.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz covers the procedures for removing and handling the OILTAP® M Diverter Switch Insert. You'll learn about the necessary steps for both long and short panels, as well as important lifting precautions to ensure safety during the process. Test your knowledge on the best practices for maintaining equipment integrity and operator safety.

    More Like This

    Electrical Engineering Methods Quiz
    9 questions

    Electrical Engineering Methods Quiz

    SelfRespectOrientalism6979 avatar
    SelfRespectOrientalism6979
    General_CDS
    94 questions

    General_CDS

    ValuableSugilite avatar
    ValuableSugilite
    Energy Accumulator Setup Instructions
    76 questions
    Electrical Maintenance Procedures
    38 questions
    Use Quizgecko on...
    Browser
    Browser