What is the main condition for the legality of an engineering contract?
What is the main condition for the legality of an engineering contract?
- There must be an offer from one party and acceptance from the other party. (correct)
- The contract should only be based on verbal agreement.
- The contract must be written in a foreign language.
- The contract must involve at least three parties.
Which organization defines the duties and rights of both parties to an engineering contract?
Which organization defines the duties and rights of both parties to an engineering contract?
- World Trade Organization
- World Bank
- International Federation of Consulting Engineers (correct)
- United Nations
In what ways can the drafting of engineering contracts differ from each other?
In what ways can the drafting of engineering contracts differ from each other?
- According to the type and nature of those who prepare the contracts and the laws (correct)
- According to the political climate
- According to the availability of technology
- According to the weather conditions
What should be the basis for reaching an agreement in an engineering contract?
What should be the basis for reaching an agreement in an engineering contract?
When is an engineering contract considered illegal?
When is an engineering contract considered illegal?
What is meant by specifications in construction contracts according to the text?
What is meant by specifications in construction contracts according to the text?
What are the main contents to write a contract according to the text?
What are the main contents to write a contract according to the text?
What is one of the main contract documents according to the text?
What is one of the main contract documents according to the text?
Which entity is responsible for making details of the drawings according to the text?
Which entity is responsible for making details of the drawings according to the text?
What is imperative for the designer writing project specifications according to the text?
What is imperative for the designer writing project specifications according to the text?