Construction Project: Two-Storey Hotel Specifications
30 Questions
3 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What should be done to the steel trusses?

  • Steel trusses should be painted before installation.
  • Steel trusses should be galvanized before installation.
  • Steel trusses should be left unpainted.
  • Steel trusses should be painted after installation. (correct)

What is the requirement for roofing materials according to the text?

  • Roofing materials should be galvanized steel sheets.
  • Roofing materials should be asphalt shingles.
  • Roofing materials should be single-ply painted long span or its equivalent.
  • Roofing materials should be multi-ply painted long span or its equivalent. (correct)

How should the roofing sheets be stored according to the text?

  • Roofing sheets should be stored in a dry place, clear of the ground. (correct)
  • Roofing sheets should be stored stacked directly on the ground.
  • Roofing sheets should be stored in a wet place, clear of the ground.
  • Roofing sheets should be stored in a humid environment.

What type of finish is required for the concrete surfaces according to the text?

<p>Concrete surfaces should have a cement plaster finish. (A)</p> Signup and view all the answers

What is the requirement for the installation of wall papers according to the text?

<p>Wall papers should be installed under the direct supervision of an Architect or Interior Designer. (A)</p> Signup and view all the answers

What should be done to projecting wires and other design elements on the concrete surface?

<p>Projecting wires and other design elements should be cut off or at least flushed with the surface. (A)</p> Signup and view all the answers

What type of wood should be used for panel doors?

<p>Hardwood (C)</p> Signup and view all the answers

How deep should the side walls be tailed for engine crack repair?

<p>5 cm (C)</p> Signup and view all the answers

What should flush type doors be made of?

<p>Marine plywood (D)</p> Signup and view all the answers

How should door joints be constructed?

<p>Tenoned and mortised joints glued well and planed (B)</p> Signup and view all the answers

What brand of hinges should be used?

<p>Stanley (C)</p> Signup and view all the answers

What type of lock should be installed on door frames?

<p>Yale locks (D)</p> Signup and view all the answers

What should be done with wall tiles before applying waterproofing?

<p>Chipped off and cleaned thoroughly with a wire brush, washed with clean water, and painted up solid with 1:2 cement mortar (D)</p> Signup and view all the answers

What is the requirement for tiles and their accessories?

<p>They should be free from imperfections that affect their quality, appearance, and strength (C)</p> Signup and view all the answers

How should tiles for wainscoting be installed?

<p>Set in correct grades and level true to lines, laid even, and set vertical in accordance with the details shown on the drawing (B)</p> Signup and view all the answers

What type of cement paste should be used for laying tiles?

<p>1:2 cement paste (D)</p> Signup and view all the answers

What brands of glazed tiles are recommended in the text?

<p>'GRANITO' or 'MARIWASA' or other approved equivalent (C)</p> Signup and view all the answers

What code and regulations should the electrical work comply with?

<p>The latest edition of the National Electrical Code of the Philippines and the Rules and Regulations of the Albay Electric Cooperative (C)</p> Signup and view all the answers

What type of building is being proposed?

<p>A 2-storey hotel (B)</p> Signup and view all the answers

What should be followed in preference to measurement by scale when figures are given?

<p>The figures given in the drawings (A)</p> Signup and view all the answers

How should materials be delivered and stored according to the specifications?

<p>Both A and B (B)</p> Signup and view all the answers

What should be done with packages showing evidence of water or other damage?

<p>They should be rejected (C)</p> Signup and view all the answers

According to the specifications, what should be furnished and installed?

<p>Anything reasonably implied by either the specifications or drawings (D)</p> Signup and view all the answers

What should be done if there is a conflict between the drawings and written specifications?

<p>The drawings and specifications are intended to cooperate, not contradict (B)</p> Signup and view all the answers

What material should be used for making tape in the installation process?

<p>Copper solder-less connectors (A)</p> Signup and view all the answers

What type of boxes should be used for outlets and switches?

<p>Plastic boxes (C)</p> Signup and view all the answers

Which type of gang boxes should be used for wall outlets?

<p>Rectangular flush-type gang boxes (B)</p> Signup and view all the answers

What kind of switches should be provided as indicated on the plans?

<p>Single pole and three-way switches of the flush tumbler type (C)</p> Signup and view all the answers

Where should convenience outlet receptacles be installed?

<p>Flushed or wall-mounted (D)</p> Signup and view all the answers

Who has the authority to direct minor changes in the location of switches and receptacles?

<p>Engineer (D)</p> Signup and view all the answers

More Like This

Use Quizgecko on...
Browser
Browser