Construction Project Delivery Methods
27 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is one of the primary reasons for the evolution of project delivery methods in the construction industry?

  • Decreased technology use
  • Less competition among firms
  • Increased labor costs
  • Increased owner requirements (correct)
  • Integrated project delivery (IPD) is a new concept that has been widely used for decades.

    False

    What does the term 'design-construction project delivery' encompass?

    The comprehensive process used to successfully complete the design and construction of buildings and facilities

    Building information modeling (BIM) is an innovation in __________.

    <p>technology</p> Signup and view all the answers

    Match the following project delivery innovations with their definitions:

    <p>Integrated Project Delivery (IPD) = A collaborative approach involving all stakeholders Public-Private Partnerships (P3) = Collaboration between government and private sector Building Information Modeling (BIM) = Using digital technology for design purposes Traditional Project Delivery = Sequential design and construction processes</p> Signup and view all the answers

    What is the primary aim of the integrated project delivery (IPD) method?

    <p>To enhance collaboration among parties</p> Signup and view all the answers

    The validation phase involves making a determination of the project’s feasibility.

    <p>True</p> Signup and view all the answers

    What does the PMT stand for in the integrated project delivery approach?

    <p>Project Management Team</p> Signup and view all the answers

    In the integrated project delivery method, collaboration is promoted through ______, planning, and implementation teams.

    <p>executive</p> Signup and view all the answers

    Match the following phases of the integrated project delivery approach with their descriptions:

    <p>Validation = Determining project feasibility and objectives Design = Coordinating design activities for implementation Implementation = Overseeing construction and utilizing lean methods Warrantee = Resolving deficiencies and distributing the risk pool</p> Signup and view all the answers

    What is the first phase in the life cycle of the architect in a traditional design-bid-build project?

    <p>Pre-design</p> Signup and view all the answers

    In a design-build project, the hiring of the design and construction team occurs at the end of the design phase.

    <p>False</p> Signup and view all the answers

    What method typically leads to overlapping design and construction project life cycles?

    <p>Construction management</p> Signup and view all the answers

    The term used for the traditional method of project delivery often referred to as 'design-bid-build' is ___.

    <p>Stipulated Price Construction Contract</p> Signup and view all the answers

    Match the following project phases or roles with their descriptions:

    <p>Architect = Engages engineering consultants and administers the construction contract Constructor = Starts with the tendering phase and ends with warranty period Integrated Project Delivery = Differentiates relationships between project stakeholders Schematic Design = Second phase in the architect's project life cycle</p> Signup and view all the answers

    Who typically certifies the payment of the contractor’s invoices in a design-bid-build project?

    <p>The architect</p> Signup and view all the answers

    The construction contract administration is a part of the architect's responsibilities in a design-bid-build project.

    <p>True</p> Signup and view all the answers

    What is one advantage of having a construction manager in a project?

    <p>Direct contractual relationship with the owner</p> Signup and view all the answers

    Construction usually commences after the total costs are known in fast-tracking projects.

    <p>False</p> Signup and view all the answers

    What is a potential risk when using fast tracking in construction?

    <p>Unknown total costs</p> Signup and view all the answers

    In design-build projects, the owner contracts with a single entity to provide both ______ and construction.

    <p>design</p> Signup and view all the answers

    Match the following advantages and disadvantages of hiring a construction manager:

    <p>Direct contractual relationship with the owner = Advantage Added costs for consultant selection = Disadvantage Fast tracking the project schedule = Advantage Less control over final cost = Disadvantage</p> Signup and view all the answers

    What is a disadvantage of having multiple construction contracts?

    <p>Increased administrative costs</p> Signup and view all the answers

    The construction manager can undertake some of the construction work without potential conflicts of interest.

    <p>False</p> Signup and view all the answers

    What role does the construction manager play regarding construction safety in a project?

    <p>Constructor's responsibility</p> Signup and view all the answers

    Careful monitoring of costs and schedule occurs because the architect, trade contractors, and ______ are independent entities.

    <p>construction manager</p> Signup and view all the answers

    Which factor complicates communication in a construction project?

    <p>Involvement of multiple parties</p> Signup and view all the answers

    Study Notes

    Introduction

    • The construction industry is changing due to social, environmental, and economic factors.
    • Multiple project delivery methods exist, each with their own features, benefits, and drawbacks.
    • The integration of design and construction activities has increased due to technological advancements in BIM and process innovations in IPD and P3s.
    • Architects are responsible for the design, alteration, and expansion of buildings.

    Design-Bid-Build

    • The most common project delivery method.
    • The owner hires an architect for design and a contractor for construction through competitive bidding.
    • The architect administers the construction contract and oversees the project.

    Advantages:

    • Direct contractual relationship between the owner and the construction manager.
    • Constructability and cost advice are available to the design team during design.
    • Fast-tracking the project schedule is possible.
    • Careful monitoring of costs and schedule can occur.

    Disadvantages

    • Project work can begin before total costs are known.
    • Selection of an additional consultant can increase time and cost.
    • Complex relationships require additional communication.
    • The owner has less control over the final cost.
    • Conflicts of interest may arise.
    • Multiple construction contracts increase administrative costs and coordination problems.

    Design-Build

    • The owner contracts with a single entity for both design and construction.
    • The design team is retained by the design-builder.
    • The design-builder is responsible for both design and construction, typically under a single contract.

    Integrated Project Delivery (IPD)

    • A collaborative approach involving all project stakeholders, including the owner, architect, engineers, and major trades.
    • Aims to break down communication barriers between design and construction.
    • Encourages collaboration through executive, planning, and implementation teams.

    Four Major Phases

    • Validation: Objectives, scope, quality, costs, schedule, and feasibility are determined.
    • Design: Design activities are coordinated and implementation is planned.
    • Implementation: Construction is overseen by the project management team. Lean construction methods are promoted.
    • Warranty: Deficiencies are resolved and the risk pool is distributed.

    Design-Build Stipulated Price Contract

    • The owner contracts with one entity for design and construction using a single contract.
    • May cause disagreements over the scope of work and construction details.
    • The prime contract is between the owner and the design-builder.
    • The design-builder's consultants are the only recognized consultants under the contract.

    Cost Plus Contract

    • The contractor is compensated for actual costs plus a fixed fee or percentage of costs.
    • Suitable for small, complex projects where total costs are difficult to determine.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Description

    Explore the various project delivery methods in the construction industry, focusing on Design-Bid-Build. Learn about the advantages and disadvantages of this common method, along with the roles of architects and contractors. This quiz examines the impact of technological advancements in construction.

    More Like This

    Mastering Integrated Project Delivery
    30 questions
    Project Delivery Methods Overview
    10 questions
    Construction Project Delivery Methods
    30 questions
    Use Quizgecko on...
    Browser
    Browser