Consider a scenario where a project manager must select a construction method for a high-rise residential building with stringent project timelines and limited on-site space. Which of the following construction methods would be MOST advantageous, considering both time efficiency and minimal on-site disruption, while also adhering to building codes and standards?
Consider a scenario where a project manager must select a construction method for a high-rise residential building with stringent project timelines and limited on-site space. Which of the following construction methods would be MOST advantageous, considering both time efficiency and minimal on-site disruption, while also adhering to building codes and standards?
- Conventional stick-built construction with extensive on-site fabrication and traditional project management techniques.
- Modular construction, employing volumetric modules manufactured off-site and assembled on-site, incorporating integrated mechanical, electrical, and plumbing (MEP) systems. (correct)
- Panelized construction, utilizing prefabricated wall, floor, and roof panels assembled on-site with a just-in-time delivery system.
- Hybrid construction approach, combining prefabrication of non-structural elements with conventional construction of the core structure and facade.
In a highly regulated urban environment, a developer is planning to build a hospital extension, requiring minimal disruption to existing hospital operations. What is the most critical factor to consider when deciding between prefabrication and modular construction?
In a highly regulated urban environment, a developer is planning to build a hospital extension, requiring minimal disruption to existing hospital operations. What is the most critical factor to consider when deciding between prefabrication and modular construction?
- The optimization of supply chain logistics to ensure timely delivery of prefabricated components, regardless of traffic congestion.
- The potential for cost savings through bulk purchasing of raw materials for on-site prefabrication of structural elements.
- The ability of modular construction to minimize on-site construction time and noise pollution, thereby reducing disturbance to patients and staff. (correct)
- The aesthetic flexibility offered by prefabrication to seamlessly integrate with the existing architectural style.
An architecture firm is commissioned to design a series of sustainable, rapidly deployable schools in a remote, underserved region with limited infrastructure. Considering both structural integrity and ease of assembly, which of the following strategies would BEST align with the project's dual objectives?
An architecture firm is commissioned to design a series of sustainable, rapidly deployable schools in a remote, underserved region with limited infrastructure. Considering both structural integrity and ease of assembly, which of the following strategies would BEST align with the project's dual objectives?
- Employing a traditional concrete frame structure, cast on-site using locally sourced materials to minimize transportation costs.
- Opting for modular construction using repurposed shipping containers, modified to meet building codes and equipped with renewable energy systems.
- Utilizing panelized construction with lightweight composite materials, designed for easy transport and rapid assembly by a local workforce with minimal training. (correct)
- Adopting a hybrid approach, combining prefabricated timber frames with locally sourced infill materials to balance structural performance and environmental impact.
A large hotel chain seeks to expand its portfolio by constructing multiple identical hotels across diverse geographic locations, each subject to varying local building codes and environmental regulations. Which of the following approaches to off-site construction would provide the GREATEST degree of standardization and adaptability, while ensuring compliance with local requirements?
A large hotel chain seeks to expand its portfolio by constructing multiple identical hotels across diverse geographic locations, each subject to varying local building codes and environmental regulations. Which of the following approaches to off-site construction would provide the GREATEST degree of standardization and adaptability, while ensuring compliance with local requirements?
Consider a scenario in which a developer is retrofitting an existing historic building with modern amenities while preserving its architectural heritage. Which off-site construction method is MOST appropriate to minimize alterations during the project?
Consider a scenario in which a developer is retrofitting an existing historic building with modern amenities while preserving its architectural heritage. Which off-site construction method is MOST appropriate to minimize alterations during the project?
An engineering firm is tasked with constructing a research facility in Antarctica. Material limitations and environmental conditions pose significant challenges. What off-site construction strategy would prove MOST effective given these constraints?
An engineering firm is tasked with constructing a research facility in Antarctica. Material limitations and environmental conditions pose significant challenges. What off-site construction strategy would prove MOST effective given these constraints?
Suppose an educational institution is seeking to build advanced research laboratories with stringent vibration and electromagnetic interference (EMI) requirements. Which of the following off-site construction methodologies would provide SUPERIOR control over these environmental factors during the construction process?
Suppose an educational institution is seeking to build advanced research laboratories with stringent vibration and electromagnetic interference (EMI) requirements. Which of the following off-site construction methodologies would provide SUPERIOR control over these environmental factors during the construction process?
A real estate developer aims to rapidly construct a series of luxury condominiums in a densely populated coastal area subject to frequent hurricanes. Evaluate the various construction methods and select the approach that MOST effectively balances speed of construction, resistance to extreme weather events, and aesthetic appeal to high-end buyers.
A real estate developer aims to rapidly construct a series of luxury condominiums in a densely populated coastal area subject to frequent hurricanes. Evaluate the various construction methods and select the approach that MOST effectively balances speed of construction, resistance to extreme weather events, and aesthetic appeal to high-end buyers.
A graduate student's final grade in a modular construction course is being calculated. If they achieve full marks on all assignments and participation, the term project mid-report, the reading report, and both quizzes, but score 80% on the final report of the term project, and 60% on the final exam, what will their overall percentage be?
A graduate student's final grade in a modular construction course is being calculated. If they achieve full marks on all assignments and participation, the term project mid-report, the reading report, and both quizzes, but score 80% on the final report of the term project, and 60% on the final exam, what will their overall percentage be?
In the course assessment structure, what is the ratio of the weighting of the final exam to the total weighting of all quizzes?
In the course assessment structure, what is the ratio of the weighting of the final exam to the total weighting of all quizzes?
A student is targeting a specific grade threshold in the modular construction course to maintain their GPA. They have already scored 100% on the assignments and participation, reading report and midterm. What minimum percentage score must they achieve on the combination of the term project (including mid-report and presentation), and final exam to achieve an overall course grade of at least 85%?
A student is targeting a specific grade threshold in the modular construction course to maintain their GPA. They have already scored 100% on the assignments and participation, reading report and midterm. What minimum percentage score must they achieve on the combination of the term project (including mid-report and presentation), and final exam to achieve an overall course grade of at least 85%?
Given the course structure, what is the latest possible date on which a student could submit a deliverable that contributes to their final grade?
Given the course structure, what is the latest possible date on which a student could submit a deliverable that contributes to their final grade?
Assuming Dr. Jun, Ahn's guest lecture occurs and focuses primarily on application and trends within the Canadian context, what aspect of MOC is being directly addressed?
Assuming Dr. Jun, Ahn's guest lecture occurs and focuses primarily on application and trends within the Canadian context, what aspect of MOC is being directly addressed?
If a student demonstrates exceptional prior knowledge of wall and floor framing design, and wishes to accelerate their learning in other areas, what is the earliest point in the course they could potentially complete approximately 50% of the total course credit?
If a student demonstrates exceptional prior knowledge of wall and floor framing design, and wishes to accelerate their learning in other areas, what is the earliest point in the course they could potentially complete approximately 50% of the total course credit?
A construction firm aims to optimize their modular production line using insights from the course. Given the topics covered, which sequence of subjects would yield quickest gains in production efficiency, while balancing worker satisfaction?
A construction firm aims to optimize their modular production line using insights from the course. Given the topics covered, which sequence of subjects would yield quickest gains in production efficiency, while balancing worker satisfaction?
A student realizes that they will be unable to submit their reading report on time due to unforeseen circumstances. Assuming they still aim for a final grade of 90%, and manage to score 100% on assignments and participation, the term project (mid-report, final report, and presentation), and all quizzes and the midterm, what minimum percentage must they achieve on the final exam to compensate?
A student realizes that they will be unable to submit their reading report on time due to unforeseen circumstances. Assuming they still aim for a final grade of 90%, and manage to score 100% on assignments and participation, the term project (mid-report, final report, and presentation), and all quizzes and the midterm, what minimum percentage must they achieve on the final exam to compensate?
In the context of modular and off-site construction (MOC), which strategy most effectively integrates manufacturing philosophies to optimize production workflows?
In the context of modular and off-site construction (MOC), which strategy most effectively integrates manufacturing philosophies to optimize production workflows?
Considering the design of modular components in buildings for optimized deconstruction and material reuse at the end-of-life phase, what strategy demonstrates the most comprehensive approach?
Considering the design of modular components in buildings for optimized deconstruction and material reuse at the end-of-life phase, what strategy demonstrates the most comprehensive approach?
When tasked with minimizing waste in modular and off-site construction (MOC) manufacturing processes to enhance productivity, which approach addresses the broadest range of waste categories and delivers the most sustainable improvements?
When tasked with minimizing waste in modular and off-site construction (MOC) manufacturing processes to enhance productivity, which approach addresses the broadest range of waste categories and delivers the most sustainable improvements?
Considering worker safety and ergonomics in a modular and off-site construction (MOC) manufacturing environment involving repetitive tasks, what intervention strategy offers the most holistic and proactive approach?
Considering worker safety and ergonomics in a modular and off-site construction (MOC) manufacturing environment involving repetitive tasks, what intervention strategy offers the most holistic and proactive approach?
Given the complexities of managing a multi-project modular construction company, what technology strategy offers the most comprehensive solution for integrating design, fabrication, and on-site assembly processes?
Given the complexities of managing a multi-project modular construction company, what technology strategy offers the most comprehensive solution for integrating design, fabrication, and on-site assembly processes?
Considering the adoption of circular economy principles in modular construction, which strategy constitutes the most innovative and sustainable approach to material management and waste reduction?
Considering the adoption of circular economy principles in modular construction, which strategy constitutes the most innovative and sustainable approach to material management and waste reduction?
In the context of scaling up modular construction operations to meet increasing market demand while maintaining quality and efficiency, which strategy represents the most comprehensive and adaptable approach?
In the context of scaling up modular construction operations to meet increasing market demand while maintaining quality and efficiency, which strategy represents the most comprehensive and adaptable approach?
When integrating sustainable design principles into modular construction projects, what approach holistically addresses environmental impact while optimizing energy efficiency and occupant well-being?
When integrating sustainable design principles into modular construction projects, what approach holistically addresses environmental impact while optimizing energy efficiency and occupant well-being?
Considering a highly complex modular construction project involving advanced material integration and stringent sustainability targets, assess which contractual delivery method would MOST optimally balance risk allocation, incentivize innovation, and ensure adherence to both budgetary and temporal constraints, given the inherent uncertainties in off-site fabrication and on-site integration?
Considering a highly complex modular construction project involving advanced material integration and stringent sustainability targets, assess which contractual delivery method would MOST optimally balance risk allocation, incentivize innovation, and ensure adherence to both budgetary and temporal constraints, given the inherent uncertainties in off-site fabrication and on-site integration?
Within the context of a large-scale modular construction endeavor, requiring the seamless integration of multiple geographically distributed fabrication facilities, elaborate a comprehensive risk mitigation strategy that addresses potential disruptions across the supply chain, logistical bottlenecks in module transportation, and unforeseen variations in on-site assembly conditions.
Within the context of a large-scale modular construction endeavor, requiring the seamless integration of multiple geographically distributed fabrication facilities, elaborate a comprehensive risk mitigation strategy that addresses potential disruptions across the supply chain, logistical bottlenecks in module transportation, and unforeseen variations in on-site assembly conditions.
Within the framework of modular construction projects, where the majority of building components are prefabricated off-site, how does Earned Value Management (EVM) need to be adapted to accurately reflect project performance, considering the unique challenges of tracking progress across both fabrication and on-site installation phases?
Within the framework of modular construction projects, where the majority of building components are prefabricated off-site, how does Earned Value Management (EVM) need to be adapted to accurately reflect project performance, considering the unique challenges of tracking progress across both fabrication and on-site installation phases?
In the context of sustainable modular construction, evaluate the life-cycle environmental impact of utilizing prefabricated volumetric modules compared to traditional stick-built construction, considering factors such as material waste, transportation emissions, energy consumption during fabrication, and potential for deconstruction and material reuse at the end of the building's lifespan.
In the context of sustainable modular construction, evaluate the life-cycle environmental impact of utilizing prefabricated volumetric modules compared to traditional stick-built construction, considering factors such as material waste, transportation emissions, energy consumption during fabrication, and potential for deconstruction and material reuse at the end of the building's lifespan.
Evaluate the legal and regulatory implications of deploying modular construction techniques across different jurisdictions, focusing specifically on the complexities arising from variations in building codes, inspection protocols, and liability frameworks governing off-site fabrication and on-site assembly.
Evaluate the legal and regulatory implications of deploying modular construction techniques across different jurisdictions, focusing specifically on the complexities arising from variations in building codes, inspection protocols, and liability frameworks governing off-site fabrication and on-site assembly.
Propose an innovative framework for integrating Building Information Modeling (BIM) with advanced sensor technologies and real-time data analytics to optimize the design, fabrication, and on-site assembly processes in modular construction, focusing on enhancing precision, minimizing errors, and improving overall project efficiency.
Propose an innovative framework for integrating Building Information Modeling (BIM) with advanced sensor technologies and real-time data analytics to optimize the design, fabrication, and on-site assembly processes in modular construction, focusing on enhancing precision, minimizing errors, and improving overall project efficiency.
Assuming a scenario where a modular construction project utilizing prefabricated bathroom pods experiences a significant plumbing defect discovered post-installation across multiple modules, analyze the optimal strategy for diagnosing the root cause, rectifying the defects, and preventing recurrence in future projects.
Assuming a scenario where a modular construction project utilizing prefabricated bathroom pods experiences a significant plumbing defect discovered post-installation across multiple modules, analyze the optimal strategy for diagnosing the root cause, rectifying the defects, and preventing recurrence in future projects.
In the context of a modular high-rise residential building, what are the critical considerations for fire safety design and engineering, given the unique challenges associated with compartmentation, fire resistance of module connections, and evacuation strategies in a prefabricated structure?
In the context of a modular high-rise residential building, what are the critical considerations for fire safety design and engineering, given the unique challenges associated with compartmentation, fire resistance of module connections, and evacuation strategies in a prefabricated structure?
Within the context of modular construction factory performance measurement, which of the following represents the MOST critical application of stochastic simulation?
Within the context of modular construction factory performance measurement, which of the following represents the MOST critical application of stochastic simulation?
In a modular construction factory aiming to optimize its material procurement plan and scheduling, what is the MOST sophisticated method to integrate real-time data and predictive analytics for lean manufacturing?
In a modular construction factory aiming to optimize its material procurement plan and scheduling, what is the MOST sophisticated method to integrate real-time data and predictive analytics for lean manufacturing?
If a modular construction factory wants to implement a comprehensive ergonomic risk assessment and control program, which approach represents the MOST proactive and holistic strategy?
If a modular construction factory wants to implement a comprehensive ergonomic risk assessment and control program, which approach represents the MOST proactive and holistic strategy?
Within the context of applying computer vision for quality assurance in modular construction, what presents the MOST significant technical challenge when inspecting welds on structural steel components?
Within the context of applying computer vision for quality assurance in modular construction, what presents the MOST significant technical challenge when inspecting welds on structural steel components?
Considering the integration of BIM (Building Information Modeling) with a cloud-based tracking system in modular construction, what exemplifies the MOST advanced use case for enhancing factory performance?
Considering the integration of BIM (Building Information Modeling) with a cloud-based tracking system in modular construction, what exemplifies the MOST advanced use case for enhancing factory performance?
When evaluating the sustainability of automation implementation in a modular construction process, what factors would MOST comprehensively assess its long-term viability?
When evaluating the sustainability of automation implementation in a modular construction process, what factors would MOST comprehensively assess its long-term viability?
Which of the following strategies MOST effectively leverages deep learning to enhance automation in modular construction factories?
Which of the following strategies MOST effectively leverages deep learning to enhance automation in modular construction factories?
In the context of noise exposure assessment within a modular construction factory, which intervention strategy demonstrates the MOST comprehensive approach to protecting worker hearing?
In the context of noise exposure assessment within a modular construction factory, which intervention strategy demonstrates the MOST comprehensive approach to protecting worker hearing?
Given advanced parametric modeling and automated CNC fabrication in modular construction, what is the MOST critical factor in optimizing material utilization while minimizing waste across a large-scale, multi-year project involving hundreds of unique module designs?
Given advanced parametric modeling and automated CNC fabrication in modular construction, what is the MOST critical factor in optimizing material utilization while minimizing waste across a large-scale, multi-year project involving hundreds of unique module designs?
In the context of modular construction, which of the following strategies would be MOST effective in mitigating the risks associated with unpredictable and disorganized scheduling on a production line, especially when integrating Lean manufacturing principles?
In the context of modular construction, which of the following strategies would be MOST effective in mitigating the risks associated with unpredictable and disorganized scheduling on a production line, especially when integrating Lean manufacturing principles?
Considering ergonomics and worker safety in a modular construction factory, which intervention strategy would BEST address the cumulative trauma disorders (CTDs) resulting from repetitive tasks, while simultaneously enhancing productivity and minimizing disruptions to the production schedule?
Considering ergonomics and worker safety in a modular construction factory, which intervention strategy would BEST address the cumulative trauma disorders (CTDs) resulting from repetitive tasks, while simultaneously enhancing productivity and minimizing disruptions to the production schedule?
When planning crane lift operations for modular construction, which of the following considerations represents the MOST sophisticated and integrated approach to ensure safety and maximize productivity, especially in congested urban environments with stringent regulatory constraints?
When planning crane lift operations for modular construction, which of the following considerations represents the MOST sophisticated and integrated approach to ensure safety and maximize productivity, especially in congested urban environments with stringent regulatory constraints?
Considering the interplay between design and on-site installation in modular construction, which of the following design strategies is MOST likely to minimize on-site adjustments and rework, thereby accelerating the overall construction schedule?
Considering the interplay between design and on-site installation in modular construction, which of the following design strategies is MOST likely to minimize on-site adjustments and rework, thereby accelerating the overall construction schedule?
In the context of factory operations for modular construction, what is the MOST effective approach to continuous process improvement, considering the dynamic nature of project requirements and the need for rapid adaptation?
In the context of factory operations for modular construction, what is the MOST effective approach to continuous process improvement, considering the dynamic nature of project requirements and the need for rapid adaptation?
When evaluating the safety performance of a modular construction project, which of the following metrics would provide the MOST comprehensive and actionable insights for preventing future incidents?
When evaluating the safety performance of a modular construction project, which of the following metrics would provide the MOST comprehensive and actionable insights for preventing future incidents?
Considering the transportation of modular units to the construction site, which strategy would BEST minimize costs and environmental impact while ensuring timely delivery and minimizing the risk of damage during transit?
Considering the transportation of modular units to the construction site, which strategy would BEST minimize costs and environmental impact while ensuring timely delivery and minimizing the risk of damage during transit?
In the context of optimizing HVAC layout and planning within modular units, which approach would MOST effectively balance energy efficiency, occupant comfort, and ease of maintenance while accounting for the constraints of modular construction?
In the context of optimizing HVAC layout and planning within modular units, which approach would MOST effectively balance energy efficiency, occupant comfort, and ease of maintenance while accounting for the constraints of modular construction?
When implementing Building Information Modeling (BIM) for modular and off-site construction, what constitutes the MOST advanced and integrated application, maximizing benefits across the entire project lifecycle?
When implementing Building Information Modeling (BIM) for modular and off-site construction, what constitutes the MOST advanced and integrated application, maximizing benefits across the entire project lifecycle?
Flashcards
Modular Construction
Modular Construction
A construction technique that involves prefabricating building components off-site and assembling them on-site.
Off-site Construction
Off-site Construction
A method where components are prefabricated away from the final construction site before being transported for assembly.
Lean Manufacturing
Lean Manufacturing
A production practice that considers the expenditure of resources in any aspect other than the direct creation of value for the end customer to be wasteful and thus a target for elimination.
Waste Management
Waste Management
Signup and view all the flashcards
Physical Demand Assessment
Physical Demand Assessment
Signup and view all the flashcards
Integration of Manufacturing Philosophy
Integration of Manufacturing Philosophy
Signup and view all the flashcards
Modular Component Design
Modular Component Design
Signup and view all the flashcards
Worker-friendly Workplace Design
Worker-friendly Workplace Design
Signup and view all the flashcards
Course Criteria
Course Criteria
Signup and view all the flashcards
Term Project Weight
Term Project Weight
Signup and view all the flashcards
Participation Weight
Participation Weight
Signup and view all the flashcards
Reading Report
Reading Report
Signup and view all the flashcards
Quizzes
Quizzes
Signup and view all the flashcards
Midterm Exam Date
Midterm Exam Date
Signup and view all the flashcards
Final Exam Weight
Final Exam Weight
Signup and view all the flashcards
Modular Building Definition
Modular Building Definition
Signup and view all the flashcards
Prefabrication Construction
Prefabrication Construction
Signup and view all the flashcards
Modular Construction Description
Modular Construction Description
Signup and view all the flashcards
Panelized Construction
Panelized Construction
Signup and view all the flashcards
Building Envelope in Modular
Building Envelope in Modular
Signup and view all the flashcards
Controlled Plant Conditions
Controlled Plant Conditions
Signup and view all the flashcards
Construction Codes and Standards
Construction Codes and Standards
Signup and view all the flashcards
Factory Performance Measurement
Factory Performance Measurement
Signup and view all the flashcards
Process Improvement
Process Improvement
Signup and view all the flashcards
Facility Layout
Facility Layout
Signup and view all the flashcards
Workplace Design
Workplace Design
Signup and view all the flashcards
Ergonomic Risk Assessment
Ergonomic Risk Assessment
Signup and view all the flashcards
Noise Exposure Assessment
Noise Exposure Assessment
Signup and view all the flashcards
Automation in Process Measurement
Automation in Process Measurement
Signup and view all the flashcards
Cloud-based Tracking System
Cloud-based Tracking System
Signup and view all the flashcards
Modular Construction Markets
Modular Construction Markets
Signup and view all the flashcards
Design-Bid-Build (DBB)
Design-Bid-Build (DBB)
Signup and view all the flashcards
Integrated Project Delivery (IPD)
Integrated Project Delivery (IPD)
Signup and view all the flashcards
Modular Off-site Construction (MOC)
Modular Off-site Construction (MOC)
Signup and view all the flashcards
Commercial General Liability Insurance
Commercial General Liability Insurance
Signup and view all the flashcards
Time Savings in Modular Construction
Time Savings in Modular Construction
Signup and view all the flashcards
Lump Sum Contract
Lump Sum Contract
Signup and view all the flashcards
Challenges of Modular Construction
Challenges of Modular Construction
Signup and view all the flashcards
Reduced Construction Schedule
Reduced Construction Schedule
Signup and view all the flashcards
Elimination of Weather Delays
Elimination of Weather Delays
Signup and view all the flashcards
Safer Construction Environment
Safer Construction Environment
Signup and view all the flashcards
Inefficient Machine Operation
Inefficient Machine Operation
Signup and view all the flashcards
Intelligent Crane Lift Analysis
Intelligent Crane Lift Analysis
Signup and view all the flashcards
Modular Drafting Design Tools
Modular Drafting Design Tools
Signup and view all the flashcards
Repetitive Activity Risks
Repetitive Activity Risks
Signup and view all the flashcards
Health and Safety in Construction
Health and Safety in Construction
Signup and view all the flashcards
Planning and Scheduling
Planning and Scheduling
Signup and view all the flashcards
Factory Productivity
Factory Productivity
Signup and view all the flashcards
Study Notes
Course Information
- Course code: BLDG 6641: Modular and Off-site Construction
- Lecture time: Monday, 14:45 – 17:30
- Location: H 507
- Instructor: Sang Hyeok Han
- Office: EV 6.223
- Phone: 514-848-2424 ext. 3942
- Email: [email protected]
- Office hours: Contact via email to schedule an appointment.
- Marker: Mizanoor Rahman ([email protected]) and Moaaz Aly Aly Elkabalawy ([email protected])
Course Description
- Introduces the benefits of modular and off-site construction (MOC).
- Focuses on modular and off-site facility components and production processes.
- Explores concepts, methods, and techniques in lean manufacturing to improve productivity and safety.
- Covers material waste management.
- Includes physical demand assessment and management in workplace design.
- Key topics include:
- Applying manufacturing systems to construction.
- Integrating manufacturing philosophy into MOC.
- Designing modular components in buildings.
- Eliminating waste in MOC for improved productivity.
- Designing worker-friendly workplaces for safety in MOC.
- Further topics will be discussed as needed.
Course Materials
- Suggested textbooks:
- Michael A. Mullens (2011). Factory design for modular homebuilding. Constructability Press.
- Tapping, D., Luyster, T., & Shuker, T. (2002). Value Stream Management: Eight steps to planning, Mapping, and Sustaining Lean Improvement, Productivity Press.
- Dennis, P. (2016). Lean Production Simplified, 3rd Edition, Productivity Press.
- Modular Building Institute (2015). Introduction to Commercial Modular Construction, Modular Building Institute.
- Additional reading materials will be announced or posted on the course website (Moodle).
Course Criteria
- Graduate Students:
- Assignments and Participation: 15%
- Term Project: 25% (Mid-report: 5%, Final report: 10%, Presentation: 8%)
- Reading Report: 10%
- Quizzes: 17%
- Exam: 33%
- Total: 100%
Reading Report Evaluation Criteria
- Abstract (10%): Literature appraisal and argument development
- Methodology (15%): Methodology
- Future Research (10%): Future research
- Citation (15%): Citation
- Format (10%): Format
- Total (100%): Overall weighting
Tentative Course Schedule
- Week 1: Introduction of Modular and Off-site Construction
- Week 2-3: Wall and Floor framing design, and Factory layout development
- Week 4: Worker-friendly workplace design
- Week 5: Process improvement using Lean Manufacturing
- Week 6: Guest Lectures (Application and Trends of MOC in Canada by Dr. Jun, Ahn (NRC)). Tentative schedule, may change.
- Week 7: Midterm Exam, Feb. 17th, 2025 (tentative)
- Week 8: Final Exam, March 31st, 2025 (tentative)
- Week 8/Final Week: Term Project Presentation, April 7th, 2025 (tentative)
Assignment and Quizzes Policy
- Assignments: Collected on due date via Moodle. Represent details and calculations, but not only answers. Handwritten softcopy with a signed "Expectations of Originality" form. Do not accept late submissions.
- Quizzes: Dates will be announced later on Moodle. Multiple choice, short answer/questions, and calculations.
Exam Policy
- Specific calculators allowed by Concordia University.
- Covers lectures, handouts, slides, and assignments.
- Closed-book, closed-notes.
- Online exam details will be announced.
Academic Code of Conduct
- Plagiarism: Presenting another person's work as your own or without proper acknowledgement is a common violation of the Academic Code of Conduct.
- Copying from books, journals, internet sites, or professor's notes verbatim.
- Paraphrasing material closely resembling the original source.
- Using another student's work (quiz answers, assignments, etc.).
- Purchasing papers.
Attendance Policy
- Regular attendance is expected and encouraged.
- Each student is responsible for all material and instructions provided during lectures. Information isn't repeated outside of class.
- Eating, chewing, talking, cell phone use, or working on other assignments is not allowed during class.
- Students are responsible for missing important announcements, quizzes, assignments, and term projects.
Course Material Announcement
- A quiz is scheduled for January 20th, 2025 (2:45PM – 3:05PM). It will cover the Academic Code of Conduct.
Example Quiz Questions
- Question 1: The Academic Code of Conduct is the University's official policy on academic integrity. (True/False)
- Question 2: Instructors, students, and administrators are expected to be honest and responsible in their academic conduct and fair in their assessment of academic matters. (True/False)
List of Services
- BCEE academic advisor
- Concordia Counselling and Development
- Advocacy and Support Services
- New Student Program
- Access Centre for Students with Disabilities
- Student Success Centre
- Financial Aids & Awards
- Health Services
Reading Report
- Wikipedia defines a literature review as "a text of a scholarly paper, which includes the current knowledge including substantive findings, as well as theoretical and methodological contributions to a particular topic."
- Aims:
- Identify each work in the context of its contribution to understanding current problems and trends.
- Identify important works in interesting topics.
Topics for Reading Report
- Application of building information modeling in MOC
- Process improvement in MOC
- Automation in MOC
- Process mapping in MOC
- Industry 4.0 applications and challenges in MOC
- Lean methodologies and techniques for MOC
- Digitalization of MOC
- MOC scheduling
- Logistic methods and plans for MOC
- Site planning and layout for MOC
- Performance evaluation in MOC
Reading Report Requirements
- Review at least 10 papers (journals, conference proceedings).
- 5-page maximum with single spacing (except for references). Feel free to add appendices if needed.
- 12-point Times New Roman font.
- Submission due date: February 9th, 2025, 2:45 PM.
- Format and cite references using provided examples (e.g., Zhang, P., Harris, F. C., Olomolaiye, P. O., & Holt, G. D. (1999)).
What is Modular?
- Modular Building Institute (MBI) defines modular as a process where a building is constructed off-site in controlled conditions. Materials and design follow the same codes as conventional buildings but take about half the time.
- Modular building units form complete buildings or parts of a buildings. This usually involves the building enclosure.
Term Definitions
- Off-site Construction: Planning, design, fabrication, and assembly of building elements take place at a location different from the final installation site, enabling more rapid and efficient permanent construction.
- Prefabrication Construction: Part of a structure is built in a factory, then assembled on-site.
- Modular Construction: Buildings are assembled from prefabricated, box-like modules, which are transported and assembled on-site.
- Panelized Construction: Buildings are assembled from prefabricated panels (walls, floors, roofs) that are transported and assembled on-site.
MOC vs On-site Construction
- Conventional construction requires multiple phases (design, bidding, construction).
- Modular construction involves designing and fabricating modules in a factory, and then installing them on-site, potentially saving time.
Common MOC Misconceptions
- MOC may be perceived to be compromised in quality standards
- MOC may be perceived to be temporary
- MOC may not comply with the same building codes as traditional construction
- MOC may have fewer architectural design choices
- MOC may be too new a construction process
Modular Benefits
- Less site disturbance and material waste.
- Minimized on-site workers, equipment, suppliers.
- Better flexibility and reusable material.
- Reduced construction schedule. Completes 30–50% faster than traditional construction. Less weather delays (60%-90% of construction is done in a factory.)
- SAFER construction environment indoor.
Modular Challenges
- Inefficient or outdated CAD/CAM tools and CNC code generation.
- Loss of productivity within the factory.
- Poor factory control system.
- Unpredictable and disorganized scheduling.
- Inefficient machine operations.
- Non-compliance to modular construction requirements.
- Workers' safety issues.
Topics for MOC Productivity and Safety
- Planning and scheduling (sequencing of modules).
- Factory performance measurement (a process-oriented framework to evaluate and improve factory performance in modular construction)
- Process improvement and tracking/control to balance the factory performance.
- Facility layout and workplace design.
- Material procurement plan and scheduling.
- Ergonomic risk assessment (physical demand analysis).
- Noise/exposure assessment.
How to Evaluate and Predict MOC Performance
- Automation in process analysis, assessment, design and performance measurement.
- Optimization, Simulation, Stochastic Modeling, Deep Learning, Lean Manufacturing techniques.
- Modern technologies like cloud-base tracking systems, Computer vision tracking, RFID, and BIM.
Goal of MOC
- (Visual representation of a large factory floor with automated modular construction processes).
References
- Modular Building Institute (2015). Introduction to Commercial Modular Construction
- McGraw Hill Construction (2011). Prefabrication and Modularization: Increasing Productivity in the Construction Industry
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
Explore selecting optimal construction methods considering project timelines, on-site space constraints, and sustainability. Evaluate the balance between prefabrication, modular construction, and sustainable practices in various scenarios. The best strategies for rapid deployment and structural integrity are considered.