Construction Equipment Types Quiz
10 Questions
3 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary function of a power shovel?

  • Compacting earth and asphalt
  • Excavating hard earth and loading haul units (correct)
  • Mixing concrete and asphalt
  • Grading and finishing earth surfaces

What are the basic parts of a power shovel?

  • Blade, Ripper, Track frame, Rollers, Idlers
  • Chassis, Boom, Arm, Bucket, Undercarriage
  • Mounting, Cab, Boom Dipper stick, Stick, Bucket, Hoist line Dipper (correct)
  • Engine, Transmission, Axles, Wheels, Steering system

What is the primary difference between crawler-mounted and wheel-mounted power shovels?

  • Size of the bucket and hoist line dipper
  • Mounting type (crawler or wheel) and travel speed (correct)
  • Type of material they can excavate
  • Type of digging motion

What is the purpose of the hoist line dipper in a power shovel?

<p>To lift and lower the bucket (B)</p> Signup and view all the answers

Which type of excavator is suitable for digging in soft ground?

<p>Crawler Mounted Power Shovel (C)</p> Signup and view all the answers

What type of contract involves public work performed for some division of the government?

<p>Government contracts (C)</p> Signup and view all the answers

Which type of contract is best suited for small works and taken by small contractors?

<p>Piece work agreement (B)</p> Signup and view all the answers

What is a demerit of a piece work agreement?

<p>Rate of progress of the work is very low as there is no time condition (D)</p> Signup and view all the answers

Which type of contract involves performing private work for an individual citizen, a group of individuals, or an organization in private business?

<p>Privet contracts (C)</p> Signup and view all the answers

What type of contract involves payment based on a specified work or part of the work at specified rates without reference to quantity or time taken?

<p>Piecework Agreement (B)</p> Signup and view all the answers

More Like This

Use Quizgecko on...
Browser
Browser