What is the first step in the LP1 process flow for raw materials?
What is the first step in the LP1 process flow for raw materials?
How long are the raw materials mixed and heated in the reaction vessel labeled 'LPI'?
How long are the raw materials mixed and heated in the reaction vessel labeled 'LPI'?
Which of the following materials is added to the LP1 process at the quickest rate?
Which of the following materials is added to the LP1 process at the quickest rate?
After the materials are cooled, what is the next stage in the LP1 process?
After the materials are cooled, what is the next stage in the LP1 process?
Signup and view all the answers
What type of salt is incorporated in the LP2 material handler process?
What type of salt is incorporated in the LP2 material handler process?
Signup and view all the answers
Which stage follows granulation in the LP1 process?
Which stage follows granulation in the LP1 process?
Signup and view all the answers
What is the purpose of the 'GRI' stage in both LP1 and LP2 processes?
What is the purpose of the 'GRI' stage in both LP1 and LP2 processes?
Signup and view all the answers
How is condensate treated after being collected from the drying stage in LP1?
How is condensate treated after being collected from the drying stage in LP1?
Signup and view all the answers
Study Notes
Process Flow Diagram
- A diagram of a chemical manufacturing process
- Shows raw materials, equipment, and intermediate products
- Raw materials include water, acrylamide, ATN, acrylic acid, and caustic salt
Raw Materials & Quantities
- Water
- Acrylamide (26,500 kg)
- ATN
- Acetic Acid
- MBA-brandning agent
- Vazo-thermal catalyst
- Versenex-chelating agent
- TBHP oxidizer
- Monrs-initiator salt
Equipment & Processes
- Different types of reactors (indicated by numbers like 20, 51)
- Tanks (D-Tank)
- Heat exchangers (indicated by the symbol)
- A variety of pumps and conveyors (different types of lines/tubes and arrows)
- Screens (GRI with numbers like 52, 53)
- Fluidized bed dryers
- Cyclones
- Evaporators
Key Process Steps
- 30-minutes of MBA-braninng agent
- 30-minutes of Vazo-thermal processes
- 3 minutes of Versenex-chelating agent
- 5 minutes of Hypo-chain Transfer
- 5 minutes of Va044-Thermo Catalyst
- Different lengths of time with other oxidizers, and initiators
- 10mm screens and 6mm screens
Product Specifications and Amounts
- 28,000 kg of Giyul
- 13,000 kg of something else (likely a product)
- Product percentages like 28-30% shown at different stages of processing
General Process Information
- Various percentages like 10-12% BW and 9-10% are indicated for various stages of the process
- Data regarding times and chemical concentrations presented
- Different types of cooling units are referenced (indicated by a number)
- Locations/labels like LP, SU, RX, and FM are present marking different sections within the facility
- Different types of pumps and conveyors represented by icons and descriptions
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
Test your knowledge on the chemical manufacturing process with this quiz focusing on raw materials, equipment, and key process steps. From reactors to various chemicals, see how well you understand the intricacies of chemical production.