Cementing Operations Quiz

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the purpose of pipe movement during cementing job?

  • To increase static time and improve mud gel formation
  • To facilitate the setting of the liner hanger
  • To enhance the cement slurry displacement efficiency
  • To break gelled mud and help offset the negative effects from poorly centralized pipe (correct)

What is the recommended minimum circulation volume before a cementing job?

  • 2 1/2 hole volumes (correct)
  • 1/2 hole volume
  • 1 hole volume
  • 3 hole volumes

Why is it important to begin the period between mud conditioning and cementing job as soon as possible?

  • Increase static time causes high mud gel and difficult removal from annulus (correct)
  • To prevent excessive pressure buildup in the wellbore
  • To minimize the risk of cement slurry contamination
  • To allow for more thorough conditioning of the drilling fluid

For cementing highly deviated or horizontal liners, what is one of the options for using pipe movement?

<p>Use a rotation liner hanger and set it before conditioning the drilling fluid (B)</p> Signup and view all the answers

What can poorly centralized pipe during cementing job negatively affect?

<p>Cement slurry displacement efficiency (B)</p> Signup and view all the answers

Flashcards are hidden until you start studying

More Like This

Cementing Operations Quiz
5 questions

Cementing Operations Quiz

BuoyantMountainPeak avatar
BuoyantMountainPeak
Cementing Risks and Failures in Oil Wells
7 questions
Cementování v ropném průmyslu
13 questions
Use Quizgecko on...
Browser
Browser