🎧 New: AI-Generated Podcasts Turn your study notes into engaging audio conversations. Learn more

Cementing Operations Quiz
5 Questions
0 Views

Cementing Operations Quiz

Created by
@BuoyantMountainPeak

Podcast Beta

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the purpose of mud conditioning before a cementing job?

  • To increase displacement efficiency by preparing the drilling fluid for removal (correct)
  • To reduce the need for pipe movement during cementing
  • To decrease displacement efficiency by preparing the drilling fluid for removal
  • To prevent the need for high pump rates during cementing operations
  • Why is it recommended to circulate at least 2 1/2 hole volumes before cementing job?

  • To reduce the need for mud conditioning
  • To decrease the displacement efficiency of the drilling fluid
  • To clean the hole of formation cutting and gas (correct)
  • To increase the static time and improve mud gel formation
  • Why is pipe movement important during cementing job?

  • To increase the need for high pump rates during cementing operations
  • To break gelled mud and offset negative effects from poorly centralized pipe (correct)
  • To prevent the need for mud conditioning
  • To decrease the displacement efficiency of the cement slurry
  • How can pipe movement be used for cementing highly deviated or horizontal liners?

    <p>Either through rotation or reciprocation before settling the liner hanger</p> Signup and view all the answers

    What is the recommended period between mud conditioning and cementing job to avoid high mud gel?

    <p>At least after 15 minutes</p> Signup and view all the answers

    More Quizzes Like This

    Concrete Materials and Processes Quiz
    39 questions
    Use Quizgecko on...
    Browser
    Browser