Cementing Operations Quiz

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the purpose of mud conditioning before a cementing job?

  • To increase displacement efficiency by preparing the drilling fluid for removal (correct)
  • To reduce the need for pipe movement during cementing
  • To decrease displacement efficiency by preparing the drilling fluid for removal
  • To prevent the need for high pump rates during cementing operations

Why is it recommended to circulate at least 2 1/2 hole volumes before cementing job?

  • To reduce the need for mud conditioning
  • To decrease the displacement efficiency of the drilling fluid
  • To clean the hole of formation cutting and gas (correct)
  • To increase the static time and improve mud gel formation

Why is pipe movement important during cementing job?

  • To increase the need for high pump rates during cementing operations
  • To break gelled mud and offset negative effects from poorly centralized pipe (correct)
  • To prevent the need for mud conditioning
  • To decrease the displacement efficiency of the cement slurry

How can pipe movement be used for cementing highly deviated or horizontal liners?

<p>Either through rotation or reciprocation before settling the liner hanger (B)</p> Signup and view all the answers

What is the recommended period between mud conditioning and cementing job to avoid high mud gel?

<p>At least after 15 minutes (C)</p> Signup and view all the answers

Flashcards are hidden until you start studying

More Like This

Cementing Operations Quiz
5 questions

Cementing Operations Quiz

BuoyantMountainPeak avatar
BuoyantMountainPeak
Cementování v ropném průmyslu
13 questions
Use Quizgecko on...
Browser
Browser