Building Systems Design Regulations Quiz
37 Questions
2 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What type of specifications primarily describes how components of a product are assembled?

  • Proprietary Specifications
  • Reference Specifications
  • Descriptive Specifications (correct)
  • Automated Specifications
  • Which specification allows general contractors to substitute products they believe are equivalent?

  • Proprietary Specifications
  • Automated Specifications
  • Base-Bid Specifications (correct)
  • Reference Specifications
  • What is the primary feature of Reference Specifications?

  • Focus on trade names and manufacturers
  • Employ recognized standards for quality (correct)
  • Facilitate the use of automated document creation
  • Detail the assembly process of components
  • Which type of specifications are most likely to describe the components and their assembly without requiring extensive testing?

    <p>Descriptive Specifications</p> Signup and view all the answers

    In the context of specifications, what would be considered a characteristic of Proprietary Specifications?

    <p>They specify products by trade name and model number.</p> Signup and view all the answers

    Which type of specifications is characterized by the use of digital libraries to create project specifications?

    <p>Automated Specifications</p> Signup and view all the answers

    What aspect is primarily covered in Division 01 of the CSI division format?

    <p>General Requirements</p> Signup and view all the answers

    What is the minimum ceiling height for habitable rooms with artificial ventilation?

    <p>2.40 meters</p> Signup and view all the answers

    Which of the following specifications would potentially provide the most control over quality?

    <p>Base-Bid Specifications</p> Signup and view all the answers

    For a building with two stories, what is the minimum ceiling height required for the first storey?

    <p>2.70 meters</p> Signup and view all the answers

    What is the easement along waterways in urban areas?

    <p>3.00 meters per side</p> Signup and view all the answers

    What is the minimum size required for a kitchen in terms of area?

    <p>3.00 sq.meters</p> Signup and view all the answers

    What is the minimum air space requirement for habitable rooms per person?

    <p>14.00 cu.meters</p> Signup and view all the answers

    What differentiates bid documents from contract documents?

    <p>Bid documents apply before the contract is signed.</p> Signup and view all the answers

    Which element is NOT part of the contract documents?

    <p>Instruction to bidder</p> Signup and view all the answers

    What is the least dimension required for a room designated for human habitation?

    <p>2.00 meters</p> Signup and view all the answers

    In agricultural areas, what is the required easement along waterways?

    <p>20.00 meters per side</p> Signup and view all the answers

    What is the minimum air space required for workshop spaces per person?

    <p>12.00 cu.meters</p> Signup and view all the answers

    Which of the following items is included in bid documents?

    <p>Drawings</p> Signup and view all the answers

    What is the minimum ceiling height required for mezzanine floors?

    <p>1.80 meters</p> Signup and view all the answers

    What is the minimum size and dimension for a bathroom and toilet?

    <p>1.20 sq.meters with 900 millimeters</p> Signup and view all the answers

    What is the main purpose of technical specifications in a project?

    <p>To provide requirements for materials and workmanship</p> Signup and view all the answers

    In forest areas, how wide is the easement along waterways?

    <p>40.00 meters per side</p> Signup and view all the answers

    How are specifications organized in technical documentation?

    <p>In divisions and sections representing trades</p> Signup and view all the answers

    What are the three primary parts that make up a section in section format?

    <p>General, Product, Execution</p> Signup and view all the answers

    Which of the following is NOT an advantage of using section format?

    <p>Increases chances for omissions</p> Signup and view all the answers

    What term is used for a major subject within a part of a section?

    <p>Article</p> Signup and view all the answers

    What does 'Quality Assurance' refer to in the context of section format?

    <p>Procedures for guarding against defects during execution</p> Signup and view all the answers

    How is a 'Section' defined in the context of construction specifications?

    <p>A portion of one or more segments of the total project</p> Signup and view all the answers

    Which part of the section format describes administrative and procedural requirements?

    <p>General Requirements</p> Signup and view all the answers

    What is the role of a 'Division' in a project manual?

    <p>To standardize construction specifications</p> Signup and view all the answers

    What is a 'Subparagraph' in the context of section format?

    <p>One or more statements related to a paragraph</p> Signup and view all the answers

    What is one limitation of traditional estimation methods mentioned in the content?

    <p>They often neglect creative solutions or project-specific issues.</p> Signup and view all the answers

    What is the primary focus of value engineering?

    <p>Maximizing value while addressing necessary functions at the lowest cost.</p> Signup and view all the answers

    Which of the following is NOT a step involved in value engineering?

    <p>Ignoring the functions of those elements.</p> Signup and view all the answers

    How does value engineering relate to sustainability?

    <p>It aims to enhance functions and reduce life cycle costs while minimizing waste.</p> Signup and view all the answers

    What is the estimated cost per square meter for the commercial building if the total cost was Php 5,400,000.00 for 450 square meters?

    <p>Php 12,000</p> Signup and view all the answers

    Study Notes

    Building Systems Design Regulations

    • Administrative Fines and Building Permits: Essential for compliance and project initiation.
    • Appeals: Provide a structured process for disputing administrative decisions.

    Light and Ventilation Standards

    • Ceiling Heights:
      • Habitable rooms with artificial ventilation: Minimum 2.40 meters from floor to ceiling.
      • First storey minimum: 2.70 meters; second storey: 2.40 meters; succeeding stories: 2.10 meters clearance.
      • Natural ventilation rooms: Minimum 2.70 meters ceiling height.
      • Mezzanine floors require at least 1.80 meters clear height.

    Room Size and Air Space Requirements

    • Minimum Room Sizes:
      • Rooms for human habitation: 6.00 sq.m. with 2.00 meters least dimension.
      • Kitchen: 3.00 sq.m. with 1.50 meters least dimension.
      • Bath and Toilet: 1.20 sq.m. with 900 millimeters least dimension.
    • Air Space Requirements:
      • School rooms: 3.00 cu.m. air space per person; 1.00 sq.m. floor area per person.
      • Workshops, factories, and offices: 12.00 cu.m. air space per person.
      • Habitable rooms: 14.00 cu.m. air space per person.

    Easement Regulations near Water Bodies

    • Easement Widths:
      • Urban areas: 3.00 meters per side of waterway.
      • Agricultural areas: 20.00 meters per side.
      • Forest areas: 40.00 meters per side.

    Bid and Contract Documents

    • Bid Documents: Include invitation to bid, instructions for bidders, bid forms, drawings and specifications, bonds, and insurance requirements.
    • Contract Documents: Comprise the signed contract agreement, bonds, insurance, drawings, specifications, and change orders.

    Technical Specifications in Construction

    • Defined as written requirements for materials and services for projects.
    • Organized into divisions and sections based on the involved trades.
    • Factors affecting specifications include the nature of work, material availability, and strength requirements (e.g., 2500 PSI for concrete).

    Types of Specifications

    • Descriptive Specifications: Detail product components and assembly methods.
    • Reference Specifications: Use established standards (CSI, ASTM, NSCP).
    • Proprietary Specifications: Specify materials and equipment by trade name and model.
    • Base-Bid Specifications: Allow substitution of equal products while specifying certain materials.
    • Automated Specifications: Utilize computer systems to expedite the drafting of specifications, incorporating model documents.

    Section Format in Specifications

    • Structure: Organized into General, Product, and Execution sections.
    • Advantages: Enhances information accessibility, reduces omissions, and facilitates documentation coordination.

    Project Manual Definitions

    • Project Manual: Compiles bidding requirements, contract forms, and specifications for a construction project.
    • Division and Section: Standard categories and subcategories for organizing specification content.

    Estimating Project Costs

    • Cost Estimation: Involves determining the probable cost of a project, for example, calculating unit costs based on square meters.
    • Example Case: Total cost of Php 5,400,000.00 for a 450 sq.m. building leads to unit cost calculations for estimating similar establishments.

    Value Engineering Approach

    • A systematic method to maintain necessary functions in a project at minimal costs.
    • Focuses on substituting materials and methods to enhance functionality without compromising quality.
    • Involves identifying key elements, analyzing functions, developing alternatives, and assessing costs for successful solutions.
    • Sustainability Impact: Aims to maximize value by eliminating waste and improving lifecycle costs, not just reducing costs.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge on essential building regulations, including administrative fines, building permits, and ventilation standards. This quiz assesses your understanding of room sizes, air space requirements, and compliance for habitable structures.

    More Like This

    NBC 2015 - Section 9.32 - 02
    30 questions
    Building Light and Ventilation Requirements
    8 questions
    TE007 Ord.Mun Hostelería
    74 questions
    National Building Code Sec. 808 Quiz
    18 questions
    Use Quizgecko on...
    Browser
    Browser