34 Questions
What is the maximum height allowed for garden masonry walls under the construction requirements?
1.2 meters
Which of the following is NOT a requirement for obtaining a construction permit if the lot is owned?
Contract of Lease or Deed of Absolute Sale
Who is liable for 15 years from the completion of the building if it collapses due to defects in the plans or the ground?
The engineer or architect who drew up the plans and specifications
What is the minimum number of sets of plans and specifications required for obtaining a construction permit if the lot is not owned?
5
How long does it take for the issuance of a construction permit after payment of the required fees?
15 days
Who is liable if a building collapses due to defects in construction or the use of inferior materials?
The contractor and the construction supervisor
What is the main purpose of renovation, according to the text?
To increase the value and utility of a building
What is the key difference between renovation and conversion, as described in the text?
Renovation involves physical changes, while conversion involves a change in use or occupancy
What is the main responsibility of the Building Official?
To enforce the Building Code in their jurisdiction
What is the purpose of the fees collected by the Building Official, as mentioned in the text?
To cover the cost of building inspections and permits
What is the maximum cost of a 'traditional family dwelling' that is exempt from fees, according to the text?
PHP15,000
What is the main difference between a 'renovation' and a 'repair', as described in the text?
Renovation involves physical changes, while repair is limited to remedial work
What is required before using or occupying a building?
All of the above
What is the consequence of not commencing construction within one year from the date of issue of the building permit?
The building permit expires
Which type of construction is allowed in non-fire restricted zones?
All types of construction are allowed
Which type of construction is NOT allowed in fire restrictive zones?
Type I construction
What is required for the full-time inspection and supervision of construction?
The services of a licensed architect or civil engineer
Which type of construction has incombustible interiors (ceilings and walls)?
Type IV construction
What is the minimum clearance required for service drop conductors from the crown of the street or sidewalk?
5.50m
What is the minimum width requirement for the access road?
3.0 meters
What is the maximum inclination allowed for escalators?
30° from horizontal
Which of the following should not be allowed within the minimum 3.0-meter wide access road?
Trees or plants
What is the minimum width between ballustrades for escalators?
560mm
What is the minimum clear height requirement for the RROW (Road Right-of-Way) above grade?
4.27 meters
What is the maximum speed allowed for escalators?
38 meters per minute
If the RROW below grade is utilized for any purpose, what must the proponent do?
Lease or pay the government for the usage
What is the minimum size of the hoistway pit for elevators?
600mm
What is the minimum sidewalk width requirement for a RROW width of 9.00 meters or more?
1.2 meters on each side
Who determines whether a street should have an open sidewalk, an arcaded sidewalk, or a combination of both?
The local planning authority
What is the maximum number of elevators allowed in a single hoistway?
4
What is the minimum temperature required for comfortable cooling standards?
20°C
What is the maximum humidity required for comfortable cooling standards?
60%
What is the minimum air movement required for comfortable cooling standards?
4.60 meters per minute
What is the minimum distance required between film storage and steam pipes, chimneys, or other sources of heat?
600mm