What type of fire involves ordinary combustible materials such as wood, cloth, rubber, and plastics?

  • Class C Fire
  • Class B Fire
  • Class D Fire
  • Class A Fire (correct)

Which class of fire involves energized electrical equipment?

  • Class C Fire (correct)
  • Class D Fire
  • Class A Fire
  • Class B Fire

What is the maximum height between landings of fire exit stairs?

  • 2.56 m
  • 4.0 m
  • 3.66 m (correct)
  • 1.80 m

What is the required interval for fire escape ladders to be supported by a rigid connection to the building?

<p>2.5 m (B)</p> Signup and view all the answers

What width must any exit access corridor serving fifty (50) or more persons not be less than?

<p>1.12 m (A)</p> Signup and view all the answers

What does a fire signal do?

<p>Alerts occupants to the presence or danger of fire (D)</p> Signup and view all the answers

In a space not protected by an approved sprinkler system, what is the maximum travel distance to an exit?

<p>35 meters (B)</p> Signup and view all the answers

What is the maximum travel distance to an exit in a space protected by a supervised sprinkler system?

<p>75 meters (B)</p> Signup and view all the answers

What is the maximum cost of a structure that is exempt from payment of building permit fees?

<p>Twenty five thousand pesos (B)</p> Signup and view all the answers

How many sets of plans and specifications are required for a building permit application?

<p>4 (B)</p> Signup and view all the answers

What document is required before any changes in the use or occupancy classification of a building can be made?

<p>Certificate of Occupancy (B)</p> Signup and view all the answers

What is the required distance from the property line for Group A dwellings on an inside lot?

<p>1 meter (A)</p> Signup and view all the answers

What is the minimum thickness of footings required for dwelling support?

<p>200 millimeters (A)</p> Signup and view all the answers

How far below the surface of the ground must footings extend?

<p>200 millimeters (D)</p> Signup and view all the answers

What is the maximum percentage of a corner lot that Group A dwellings can occupy?

<p>90% (A)</p> Signup and view all the answers

When must the Building Official issue a document for changes in usage or occupancy classification?

<p>Before occupancy is granted (C)</p> Signup and view all the answers

What is the maximum length for such tailpiece connections?

<p>0.4 m (B)</p> Signup and view all the answers

What diameter opening should the top of the deep seal trap have?

<p>19 mm (A)</p> Signup and view all the answers

Which system is an integrated network of hydraulically designed piping that automatically discharges water when activated by heat?

<p>Sprinkler System (D)</p> Signup and view all the answers

Which term defines a parcel of land on which a principal building and its accessories are placed?

<p>Lot (C)</p> Signup and view all the answers

Which device is used to prevent the spread of fire or smoke inside HVAC ducts?

<p>Damper (A)</p> Signup and view all the answers

How many days does the building official have to issue a building permit after the required fees are paid?

<p>15 (A)</p> Signup and view all the answers

What is the term for the process of supplying or removing air to or from any space?

<p>Ventilation (D)</p> Signup and view all the answers

Which of the following is NOT a qualification of a Building Official?

<p>A member of a prestigious academic society (C)</p> Signup and view all the answers

Fires involving flammable liquids and gases are classified as which type?

<p>Class B Fire (A)</p> Signup and view all the answers

What is the purpose of a siphon breaker in a deep seal trap?

<p>Break siphoning action (D)</p> Signup and view all the answers

According to the National Building Code, how is an 'additional indigenous family dwelling' defined?

<p>A dwelling for the owner's family only, made from native materials (A)</p> Signup and view all the answers

Which system provides a means for attaching fire hoses on each floor of a building?

<p>Standpipe System (A)</p> Signup and view all the answers

What happens to a building permit if the construction is not started within a specific time frame?

<p>It expires and becomes null and void (D)</p> Signup and view all the answers

If the building or work is suspended or abandoned, how long can it take for the permit to become void?

<p>120 days from suspension (C)</p> Signup and view all the answers

What is the minimum time a building permit remains valid before expiration if work has started?

<p>2 years (D)</p> Signup and view all the answers

What is required for a lot to meet the standards for economic and socialized housing?

<p>Adequate open spaces (A)</p> Signup and view all the answers

When down-feed riser pipe is used, the barrel of the double sanitary tee fitting should be at least how much larger than the largest inlet?

<p>3 inches (A)</p> Signup and view all the answers

How many fixture units shall water closets be computed as when determining septic tank size?

<p>4 fixture units (A)</p> Signup and view all the answers

For a continuous flow into a drainage system, how much flow is allowed for every 2 fixture units?

<p>0.75 L/s (C)</p> Signup and view all the answers

Closet rings must be fastened with corrosive resistant fasteners up to a height above the finish floor of how much?

<p>6.4 mm (A)</p> Signup and view all the answers

Which fittings may serve two fixtures set back-to-back within the required distance between a trap and its vent?

<p>Double sanitary tee (C)</p> Signup and view all the answers

What is the minimum height that galvanized wrought iron or steel pipe must be kept above ground?

<p>152 mm (D)</p> Signup and view all the answers

Which type of pipe is prohibited from being used for building drain or sewer above ground?

<p>PVC (B)</p> Signup and view all the answers

Each wet-vented section must be what size in relation to the required minimum waste pipe size?

<p>At least 1 pipe size larger (A)</p> Signup and view all the answers

What is the minimum pressure that can be provided for water service yard piping?

<p>40 psi (B)</p> Signup and view all the answers

What is the correct distance that the bottom of the water pipe must be above the sewer or drain line?

<p>0.6 m (D)</p> Signup and view all the answers

In order to have a proper installation, how should water service yard piping be placed below ground level?

<p>0.6 m (A)</p> Signup and view all the answers

What is the range of opening sizes for screens used in the vents of gravity supply tanks?

<p>14 to 18 mess (A)</p> Signup and view all the answers

Where should control gate valves be installed?

<p>Before each water supplied appliance (A)</p> Signup and view all the answers

What is the maximum distance for covering gravity tanks with a vented return-bend vent pipe?

<p>Not less than the area of the down-feed riser pipe (D)</p> Signup and view all the answers

What is the maximum allowable fitting configuration for inlets?

<p>At every branch interval (B)</p> Signup and view all the answers

What is the required construction feature for each shower receptor?

<p>Finished dam at least 25.4 mm lower than the outside floor (C)</p> Signup and view all the answers

Flashcards

Class A Fire

Fires involving ordinary combustible materials like wood, cloth, rubber, and plastics.

Class B Fire

Fires involving combustible liquids, such as gasoline, oil, and grease.

Class C Fire

Fires involving energized electrical equipment.

Class D Fire

Fires involving combustible metals, such as sodium, magnesium, and potassium.

Signup and view all the flashcards

Fire signal

A visual or audible signal used to alert occupants during a fire.

Signup and view all the flashcards

Maximum height between landings

The greatest allowable vertical distance between two floors where stairways lead.

Signup and view all the flashcards

Exit access corridor width

Minimum width needed for exit corridors serving 50 or more people.

Signup and view all the flashcards

Exit travel length

Maximum distance people must travel to reach an exit; varies depending on if the area is protected by sprinkler systems or not.

Signup and view all the flashcards

Parcel of Land

A piece of land on which a building and its accessories are situated or can be situated, along with necessary open spaces.

Signup and view all the flashcards

Site Location

The specific location of a building on a parcel of land.

Signup and view all the flashcards

Building Permit Processing Time

The time frame for issuing a building permit after the applicant pays required fees, as per National Building Code.

Signup and view all the flashcards

Building Permit Expiration

A building permit becomes invalid if the building project isn't started or completed within a given period.

Signup and view all the flashcards

Additional Indigenous Family Dwelling

A house intended only for the owner's family, made from local materials (e.g., bamboo, nipa).

Signup and view all the flashcards

Building Official Qualifications

A building official needs to be a Filipino citizen, registered architect or engineer, a member of a professional organization, and have relevant experience in building and design.

Signup and view all the flashcards

RA 1378

A law, possibly related to the rules and standards for housing projects.

Signup and view all the flashcards

Building Permit Expiration Time

A building permit becomes invalid (expires) if construction isn't started or isn't completed within a specific time frame.

Signup and view all the flashcards

Building Permit Exemption Cost

Structures costing less than PHP 15,000 are exempt from building permit fees.

Signup and view all the flashcards

Building Permit Application Plans

Applications require at least four sets of submitted plans, signed by engineers (mechanical and electrical) for mechanical and electrical portions respectively, unless the Building Official waives these requirements.

Signup and view all the flashcards

Group A Dwellings Corner Lot Limit

Group A dwellings should occupy no more than ninety percent of a corner lot.

Signup and view all the flashcards

Group A Dwellings Inside Lot Limit

Group A dwellings should occupy no more than eighty percent of the inside lot. They must also meet setback requirements (at least 1 meter from the property line).

Signup and view all the flashcards

Building Permit Issuance

Changes in structure or use cannot be made until a Certificate of Occupancy is obtained from the Building Official.

Signup and view all the flashcards

Footing Thickness

Footings must be strong enough to support the structure and must be at least a minimum thickness (in mm) beneath the ground level. This depth varies.

Signup and view all the flashcards

Minimum Property Setback

Group A Dwellings must be at least 1.5 meters from the property line to comply with setback, sunlight, and views regulations.

Signup and view all the flashcards

Electrical and Mechanical Plans

Building plans specifically for electrical and mechanical components MUST be signed and sealed by a registered electrical or mechanical engineer respectively, unless exempt by the Building Official.

Signup and view all the flashcards

Shower Receptor Height

Shower receptors must have a dam, curb, or threshold at least 25.4mm lower than the surrounding floor.

Signup and view all the flashcards

Water Pipe Elevation

The bottom of any water pipe must be at least 0.6 meters above the top of any sewer or drain line.

Signup and view all the flashcards

Water Service Yard Piping Depth

Water service yard piping must be at least 0.6 meters below the finished ground level.

Signup and view all the flashcards

Vent Pipe Screen Openings

Gravity supply tank vents require screened openings of between 12mm and 14mm, and between 16mm and 20mm respectively for different dimensions of mesh.

Signup and view all the flashcards

Control Valve Placement

Control gate valves should be placed before each water-supplied appliance, or every 15 meters.

Signup and view all the flashcards

Valve Accessibility

All required shut-off or control valves must be readily accessible for maintenance.

Signup and view all the flashcards

Tank Vent Pipe Area

Tank vent pipe area shouldn't be smaller than the down-feed riser pipe area.

Signup and view all the flashcards

Multiple Inlet Fitting Restriction

Fittings with multiple inlets should prevent discharge from one inlet from entering another.

Signup and view all the flashcards

Sanitary Tee Size

The barrel of a double sanitary tee fitting needs to be at least one pipe size larger than its largest inlet.

Signup and view all the flashcards

Water Closet Fixture Units

Water closets are counted as 3 fixture units for septic tank sizing.

Signup and view all the flashcards

Continuous Flow Fixture Units

For continuous flow (e.g., sump pump), 2 fixture units are allowed for every 0.75 L/s of flow.

Signup and view all the flashcards

Back-to-Back Fixtures

Two fixtures close together can share a single drain pipe if they drain separately into a double sanitary tee.

Signup and view all the flashcards

Drainage Branch Line Entry

Horizontal drainage lines must enter a vertical stack using a combination wye and 1/8 bend, or an equivalent fitting.

Signup and view all the flashcards

Underground Galvanized Pipe Height

Galvanized pipes must be kept a minimum of 600 mm above ground.

Signup and view all the flashcards

Above-Ground Piping Materials

Building drain or sewer piping should never use galvanized materials above ground or when pressurized.

Signup and view all the flashcards

Closet Ring Fastening Height

Closet rings must be fastened with corrosive-resistant fasteners to the floor, with the top surface at least 7.62 mm above the finish floor.

Signup and view all the flashcards

Deep Seal Trap Diameter

The top of a deep seal trap has a specific diameter opening at its highest point, acting as a siphon breaker.

Signup and view all the flashcards

Tailpiece Length Limit

Connections, also known as tailpieces, should be as short as possible, and in no case exceed a certain length.

Signup and view all the flashcards

Standpipe System

A system of vertical pipes in a building, allowing fire hose connections on each floor to provide water as needed, during a fire.

Signup and view all the flashcards

Fire Damper

A device in HVAC ducts that prevents fire and smoke spread, automatically closing upon heat or smoke detection.

Signup and view all the flashcards

Flammable Liquid Fire

Fires involving flammable liquids and gases.

Signup and view all the flashcards

Fire Suppression

A system designed to stop the spread of fires through a network of piping with automatically releasing water when activated by heat or combustion.

Signup and view all the flashcards

Ventilation

The act of providing or removing air in a particular space; can be natural or mechanical. This process involves supplying or removing conditioned and refreshing air to a space.

Signup and view all the flashcards

Fire

The active principle of burning, characterized by heat and light of combustion.

Signup and view all the flashcards

Study Notes

Building Codes and Regulations

  • Wall Types: Walls used to resist lateral displacement, subsurface walls resisting internal loads. Types include parapets, retaining walls, foundation walls, and firewalls.
  • Natural Light: Openings in walls for natural light, examples include ledges, doorways, windows
  • Storey: A floor level or structure between upper and lower floors. The topmost storey is the highest one.
  • Floor Level: The portion of a building between floor surfaces.
  • Masonry: Construction using various building blocks, like stone, brick, concrete block, set in mortar. Other relevant constructions were also mentioned.
  • Parcel of Land/Lot: Property where a building and its accessories are placed or can be placed.
  • Egress: Continuous passages, doorways, corridors, balconies, ramps, stairs, and yards in a building, allowing safe exit.
  • Building: A structure for shelter, enclosure, and support.
  • Philippine Building Codes: PD 1096, RA 9514, BP 220, RA 1378 are mentioned as Philippine building standards or codes.
  • Economic and Socialized Housing Projects: Mentioned in relation to building codes.
  • National Plumbing Code of the Philippines: mentioned in relation to building codes.
  • Building Official Qualifications: A Filipino citizen; of good character; duly registered architect or civil engineer; member of a professional organization for at least two years; building design and construction experience; and additional qualifications for specialized building professions.
  • Additional Indigenous Family Dwelling: Dwelling for use by the owner’s family that must be built with native materials, cost not exceeding P30,000.00 , exempt from building permit fees.
  • Building Permit Application: Requires submitted plans and specifications signed by architects, civil, mechanical, or electrical engineers.
  • Building Permits: Expiring permits require commencement within a certain period, otherwise the permit becomes void.
  • Building Codes: Local pressure must be less than specific kPa values or a pressure reducing regulator might be required. If local water pressure is insufficient, other pressure solutions, like elevated tanks or pumps, are part of the requirements. Piping requirements including elevation, minimum sizes, and spacing are included in the provided codes.
  • **Sanitary Requirements:**Minimum room sizes and standards for different parts of a building (habitable rooms, bathrooms, kitchens, toilet). Dimensions and sizes are provided for specific room types. Regulations for vent requirements are also provided.
  • Fire safety and structural components: Fire codes regarding building structures and fire safety aspects are included.
  • Other codes: Specific codes address things like sanitary drains, storm water drains, and general building requirements.

Additional Structural Details

  • Building elevation: Measurements on plans, base elevations, and other elevation-related measurements are regulated. Sections with rough-ins, stub outs, stubs, and other pertinent aspects are regulated.
  • Plumbing installations: Fixtures, water pipes, and pipe installations must meet requirements for accessibility, functionality, and safety.
  • Water pipes: Requirements for the minimum distance from pipes to the ground or other structures. Specifics were included.
  • Plumbing fixtures: Requirements for how particular fixtures like showers, receptors should be installed and measured.
  • Gravity tanks: Relevant to fire safety.
  • Building exits and fire safety: Code requirements dictate acceptable egress distances and total travel distances, as well as the need for supervised sprinkler systems, and other fire safety standards.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

Building Code PDF

More Like This

Building Construction Requirements
30 questions
Building Code Enforcement and Regulations
29 questions
Building Codes and Regulations Quiz
20 questions