Questions and Answers

What is the recommended time for the safety shut-off valve to close after the main burner test firing valve is closed for a gas burner with an interrupted pilot?

  • Exactly four seconds
  • Less than four seconds (correct)
  • More than four seconds
  • Depends on the scanner operation
  • What should be done if the ultraviolet scanner fires excessively when exposed to ambient light?

  • It does not require any action
  • Clean the scanner lens regularly
  • Replace the scanner (correct)
  • Increase the ambient light exposure
  • How often does ASME CSD-1 recommend replacing flame rods and scanners?

  • Monthly
  • Bi-monthly
  • Bi-annually
  • Annually (correct)
  • What is the purpose of the post-purge and safety shut-down/lockout in the programmed combustion control?

    <p>To clear any remaining combustible gases</p> Signup and view all the answers

    What is the recommended frequency for testing the low gas pressure cut-off switch according to ASME CSD-1?

    <p>Monthly</p> Signup and view all the answers

    How can the low gas pressure cut-off be tested during the operation of the boiler?

    <p>By quickly closing the main gas valve upstream of the low gas pressure switch</p> Signup and view all the answers

    What is recommended for testing combustion air proving switches?

    <p>Developing approved, safe, site-specific procedures for testing airflow proving switches</p> Signup and view all the answers

    What should be done prior to performing a pop test on safety valves?

    <p>Performing a try lever test to ensure the safety valve is not seized</p> Signup and view all the answers

    What is important before conducting a manual try lever test for heating boilers in steam service?

    <p>Ensuring that all personnel are cleared from the area near the safety valve before conducting a manual try lever test</p> Signup and view all the answers

    What should be done if a safety valve continues to simmer during a manual try lever test?

    <p>The valve must be replaced or repaired by an authorized valve repair agency</p> Signup and view all the answers

    What is the purpose of rapidly draining the float chamber in a boiler?

    <p>To discharge sediment from the base of the float chamber</p> Signup and view all the answers

    How often should the float chamber blowdown test be completed for power boilers according to ASME CSD-1?

    <p>Daily</p> Signup and view all the answers

    What is the recommended frequency for completing the slow drain test for boilers according to ASME CSD-1?

    <p>Semi-annually</p> Signup and view all the answers

    How can the operation of a feedwater solenoid valve be checked?

    <p>By observing the levels at which the feedwater system starts and stops</p> Signup and view all the answers

    What should be done annually as part of the maintenance and inspection of water level controls?

    <p>Inspecting electrical contacts for cleanliness</p> Signup and view all the answers

    What should be done if the safety valve fails to open at the required pressure?

    <p>Apply the try lever test a few times and repeat the pop test</p> Signup and view all the answers

    What is the acceptable range for the safety valve to open during the pop test according to ASME BPVC?

    <p>13 to 17 psi (85 to 115 kPa)</p> Signup and view all the answers

    What does ASME BPVC state regarding the blowdown of safety valves?

    <p>Blowdown should be between 2 to 4 psi (15 to 30 kPa)</p> Signup and view all the answers

    What is the purpose of an accumulation test for safety valves?

    <p>To verify if the installed safety valve capacity is sufficient</p> Signup and view all the answers

    What is the maximum acceptable pressure during an accumulation test for a boiler with a MAWP of 1380 kPa and a safety valve set to 1310 kPa?

    <p>1389 kPa</p> Signup and view all the answers

    What is the recommended frequency for testing the boiler flame failure detection systems?

    <p>Weekly</p> Signup and view all the answers

    When testing the flame failure device on a boiler, what is necessary to simulate?

    <p>Flame failure condition</p> Signup and view all the answers

    According to ASME BPVC VI, what does the recommended procedure describe the testing of?

    <p>Flame safeguard devices</p> Signup and view all the answers

    What should be closed to test the gas burner with a thermocouple or thermopile flame sensor?

    <p>Main burner test firing valve</p> Signup and view all the answers

    What is important to follow when testing various devices according to the text?

    <p>Manufacturer testing instructions</p> Signup and view all the answers

    What is the purpose of the flow switch in a copper tubular and copper fin-tube boiler?

    <p>To provide positive water circulation to protect heat transfer surfaces</p> Signup and view all the answers

    How can the flow switch in a copper tubular and copper fin-tube boiler be tested?

    <p>By slowly closing the boiler outlet valve and observing the burner</p> Signup and view all the answers

    What is a recommended means for testing the operation of the external low-water fuel cut-off without draining the entire system?

    <p>Installing special combination test and check valves</p> Signup and view all the answers

    How often does ASME BPVC VI recommend testing the low water cut-off of hot water heating boilers?

    <p>Monthly</p> Signup and view all the answers

    What is the purpose of the high temperature cut-off in a boiler?

    <p>To protect against overheating by shutting off power to the controls</p> Signup and view all the answers

    Study Notes

    Gas Burner and Flame Failure Detection

    • Safety shut-off valve should close within recommended time after main burner test firing valve is closed for a gas burner with an interrupted pilot.
    • If ultraviolet scanner fires excessively when exposed to ambient light, adjust scanner or relocate it to reduce exposure.
    • ASME CSD-1 recommends replacing flame rods and scanners every 1-2 years or as specified by manufacturer.

    Combustion Control and Safety Shut-down/Lockout

    • Post-purge and safety shut-down/lockout in programmed combustion control prevent fuel leaks and ensure burner safety.
    • Low gas pressure cut-off switch should be tested every 30 days according to ASME CSD-1.
    • To test low gas pressure cut-off during boiler operation, observe gauge or alarm when simulating low gas pressure.

    Testing and Maintenance

    • Combustion air proving switches should be tested every 30 days according to ASME CSD-1.
    • Before performing a pop test on safety valves, ensure all relevant safety procedures are followed.
    • Before conducting a manual try lever test for heating boilers in steam service, ensure boiler is in operation and pressure is at minimum.
    • If safety valve continues to simmer during manual try lever test, it may be faulty and should be replaced.
    • Rapidly draining the float chamber in a boiler helps prevent corrosion and sediment buildup.
    • Float chamber blowdown test should be completed every 31 days for power boilers according to ASME CSD-1.
    • Slow drain test should be completed every 366 days for boilers according to ASME CSD-1.

    Feedwater Solenoid Valve and Water Level Controls

    • Feedwater solenoid valve operation can be checked by observing valve action when energized and de-energized.
    • Annually, inspect and test water level controls, including connections, as part of maintenance.

    Safety Valve Testing and Maintenance

    • If safety valve fails to open at required pressure, it may be faulty and should be replaced.
    • Safety valve should open between 1.03 and 1.10 MAWP during pop test according to ASME BPVC.
    • ASME BPVC requires blowdown of safety valves to prevent accumulation of sediment.
    • Accumulation test for safety valves simulates operating conditions to ensure proper opening.
    • Maximum acceptable pressure during accumulation test is 1.1 MAWP for boilers with a MAWP of 1380 kPa and a safety valve set to 1310 kPa.

    Boiler Flame Failure Detection and Testing

    • Boiler flame failure detection systems should be tested every 30 days according to ASME CSD-1.
    • When testing flame failure device, simulate flame failure to observe system reaction.
    • ASME BPVC VI describes recommended procedure for testing flame failure detection systems.

    Testing Various Devices

    • To test gas burner with thermocouple or thermopile flame sensor, close burner valve.
    • Follow recommended procedures and manufacturer's instructions when testing various devices.

    Flow Switch and Low Water Cut-off

    • Flow switch in copper tubular and copper fin-tube boiler ensures adequate water flow for safe operation.
    • Flow switch can be tested by simulating no-flow or low-flow conditions.
    • External low-water fuel cut-off can be tested without draining entire system by isolating and simulating low-water conditions.
    • ASME BPVC VI recommends testing low water cut-off of hot water heating boilers every 31 days.

    High Temperature Cut-off

    • High temperature cut-off in a boiler prevents overheating and ensures safe operation.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz covers the procedure for testing a boiler safety valve, including recording the opening and closing pressures and steps to take if the valve fails to open at the required pressure.