Boiler Safety Valve Testing Procedure
30 Questions
4 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the recommended time for the safety shut-off valve to close after the main burner test firing valve is closed for a gas burner with an interrupted pilot?

  • Exactly four seconds
  • Less than four seconds (correct)
  • More than four seconds
  • Depends on the scanner operation

What should be done if the ultraviolet scanner fires excessively when exposed to ambient light?

  • It does not require any action
  • Clean the scanner lens regularly
  • Replace the scanner (correct)
  • Increase the ambient light exposure

How often does ASME CSD-1 recommend replacing flame rods and scanners?

  • Monthly
  • Bi-monthly
  • Bi-annually
  • Annually (correct)

What is the purpose of the post-purge and safety shut-down/lockout in the programmed combustion control?

<p>To clear any remaining combustible gases (C)</p> Signup and view all the answers

What is the recommended frequency for testing the low gas pressure cut-off switch according to ASME CSD-1?

<p>Monthly (C)</p> Signup and view all the answers

How can the low gas pressure cut-off be tested during the operation of the boiler?

<p>By quickly closing the main gas valve upstream of the low gas pressure switch (D)</p> Signup and view all the answers

What is recommended for testing combustion air proving switches?

<p>Developing approved, safe, site-specific procedures for testing airflow proving switches (D)</p> Signup and view all the answers

What should be done prior to performing a pop test on safety valves?

<p>Performing a try lever test to ensure the safety valve is not seized (C)</p> Signup and view all the answers

What is important before conducting a manual try lever test for heating boilers in steam service?

<p>Ensuring that all personnel are cleared from the area near the safety valve before conducting a manual try lever test (D)</p> Signup and view all the answers

What should be done if a safety valve continues to simmer during a manual try lever test?

<p>The valve must be replaced or repaired by an authorized valve repair agency (D)</p> Signup and view all the answers

What is the purpose of rapidly draining the float chamber in a boiler?

<p>To discharge sediment from the base of the float chamber (C)</p> Signup and view all the answers

How often should the float chamber blowdown test be completed for power boilers according to ASME CSD-1?

<p>Daily (A)</p> Signup and view all the answers

What is the recommended frequency for completing the slow drain test for boilers according to ASME CSD-1?

<p>Semi-annually (B)</p> Signup and view all the answers

How can the operation of a feedwater solenoid valve be checked?

<p>By observing the levels at which the feedwater system starts and stops (D)</p> Signup and view all the answers

What should be done annually as part of the maintenance and inspection of water level controls?

<p>Inspecting electrical contacts for cleanliness (B)</p> Signup and view all the answers

What should be done if the safety valve fails to open at the required pressure?

<p>Apply the try lever test a few times and repeat the pop test (A)</p> Signup and view all the answers

What is the acceptable range for the safety valve to open during the pop test according to ASME BPVC?

<p>13 to 17 psi (85 to 115 kPa) (D)</p> Signup and view all the answers

What does ASME BPVC state regarding the blowdown of safety valves?

<p>Blowdown should be between 2 to 4 psi (15 to 30 kPa) (D)</p> Signup and view all the answers

What is the purpose of an accumulation test for safety valves?

<p>To verify if the installed safety valve capacity is sufficient (B)</p> Signup and view all the answers

What is the maximum acceptable pressure during an accumulation test for a boiler with a MAWP of 1380 kPa and a safety valve set to 1310 kPa?

<p>1389 kPa (D)</p> Signup and view all the answers

What is the recommended frequency for testing the boiler flame failure detection systems?

<p>Weekly (B)</p> Signup and view all the answers

When testing the flame failure device on a boiler, what is necessary to simulate?

<p>Flame failure condition (B)</p> Signup and view all the answers

According to ASME BPVC VI, what does the recommended procedure describe the testing of?

<p>Flame safeguard devices (C)</p> Signup and view all the answers

What should be closed to test the gas burner with a thermocouple or thermopile flame sensor?

<p>Main burner test firing valve (B)</p> Signup and view all the answers

What is important to follow when testing various devices according to the text?

<p>Manufacturer testing instructions (D)</p> Signup and view all the answers

What is the purpose of the flow switch in a copper tubular and copper fin-tube boiler?

<p>To provide positive water circulation to protect heat transfer surfaces (B)</p> Signup and view all the answers

How can the flow switch in a copper tubular and copper fin-tube boiler be tested?

<p>By slowly closing the boiler outlet valve and observing the burner (A)</p> Signup and view all the answers

What is a recommended means for testing the operation of the external low-water fuel cut-off without draining the entire system?

<p>Installing special combination test and check valves (C)</p> Signup and view all the answers

How often does ASME BPVC VI recommend testing the low water cut-off of hot water heating boilers?

<p>Monthly (D)</p> Signup and view all the answers

What is the purpose of the high temperature cut-off in a boiler?

<p>To protect against overheating by shutting off power to the controls (B)</p> Signup and view all the answers

Flashcards

Gas Burner Safety Shut-off

The safety valve needs to close within a specified time after the burner's pilot valve is shut off.

UV Scanner Adjustment

If a UV scanner is reacting excessively to ambient light, adjust its position or relocate it for better performance.

Flame Rod/Scanner Replacement

These components should be replaced every 1-2 years or as per manufacturer's instructions.

Post-Purge and Safety Shutdown

This process prevents gas leaks and ensures safe operation of the burner.

Signup and view all the flashcards

Low Gas Pressure Cut-off Test

Test this switch every 30 days by simulating low gas pressure (observe gauge/alarm).

Signup and view all the flashcards

Combustion Air Proving Switch Test

Test this switch every 30 days as per ASME CSD-1.

Signup and view all the flashcards

Safety Valve Pop Test Procedure

Follow all safety procedures before performing a pop test on safety valves.

Signup and view all the flashcards

Heating Boiler Try Lever Test

Ensure the boiler is operating and has minimum pressure before manually testing the try lever.

Signup and view all the flashcards

Faulty Safety Valve Indication

A safety valve that continues to simmer during the manual test might be faulty and needs replacement.

Signup and view all the flashcards

Float Chamber Blowdown

Drain the float chamber regularly to prevent corrosion and sediment buildup.

Signup and view all the flashcards

Float Chamber Blowdown Frequency

Power boilers must have a float chamber blowdown test every 31 days.

Signup and view all the flashcards

Slow Drain Test Frequency

Slow drain tests should be conducted every 366 days in boilers.

Signup and view all the flashcards

Feedwater Solenoid Valve Check

Observe the valve's action when energized and de-energized to check operation.

Signup and view all the flashcards

Water Level Controls Inspection

Inspect and test water level controls (connections) annually during maintenance.

Signup and view all the flashcards

Safety Valve Failure

A safety valve that doesn't open at the required pressure might be faulty and needs replacement.

Signup and view all the flashcards

Safety Valve Opening Pressure Range

Safety valves should open between 1.03 and 1.10 MAWP during a pop test (per ASME BPVC).

Signup and view all the flashcards

Safety Valve Blowdown

ASME BPVC requires blowdown of safety valves to remove sediment.

Signup and view all the flashcards

Safety Valve Accumulation Test

This test simulates operating conditions to ensure proper opening of the safety valve.

Signup and view all the flashcards

Safety Valve Accumulation Test Pressure

Maximum acceptable pressure for accumulation test is 1.1 MAWP for 1380 kPa MAWP boilers with a 1310 kPa set safety valve.

Signup and view all the flashcards

Boiler Flame Failure Detection Test Frequency

Test the system every 30 days, according to ASME CSD-1.

Signup and view all the flashcards

Flame Failure Simulation

Simulate flame failure to observe the system's response during flame failure testing.

Signup and view all the flashcards

Gas Burner Thermocouple/Thermopile Test

To test the burner with thermocouple or thermopile sensors close the burner valve.

Signup and view all the flashcards

Device Testing Procedure

Follow recommended manufacturer's instructions when testing any device.

Signup and view all the flashcards

Flow Switch Function

Flow switch for copper tubular and fin-tube boilers ensures sufficient water flow during operation.

Signup and view all the flashcards

Flow Switch Test

Simulate no-flow or low-flow conditions to test the flow switch.

Signup and view all the flashcards

External Low-Water Cut-off Test

Test the external low-water fuel cut-off by isolating and simulating low water conditions without draining the entire system.

Signup and view all the flashcards

External Low-Water Cut-off Test Frequency

Test the low water cut-off every 31 days for hot water heating boilers per ASME BPVC VI.

Signup and view all the flashcards

High-Temperature Cut-off Function

This cut-off system prevents boiler overheating, ensuring safety.

Signup and view all the flashcards

Study Notes

Gas Burner and Flame Failure Detection

  • Safety shut-off valve should close within recommended time after main burner test firing valve is closed for a gas burner with an interrupted pilot.
  • If ultraviolet scanner fires excessively when exposed to ambient light, adjust scanner or relocate it to reduce exposure.
  • ASME CSD-1 recommends replacing flame rods and scanners every 1-2 years or as specified by manufacturer.

Combustion Control and Safety Shut-down/Lockout

  • Post-purge and safety shut-down/lockout in programmed combustion control prevent fuel leaks and ensure burner safety.
  • Low gas pressure cut-off switch should be tested every 30 days according to ASME CSD-1.
  • To test low gas pressure cut-off during boiler operation, observe gauge or alarm when simulating low gas pressure.

Testing and Maintenance

  • Combustion air proving switches should be tested every 30 days according to ASME CSD-1.
  • Before performing a pop test on safety valves, ensure all relevant safety procedures are followed.
  • Before conducting a manual try lever test for heating boilers in steam service, ensure boiler is in operation and pressure is at minimum.
  • If safety valve continues to simmer during manual try lever test, it may be faulty and should be replaced.
  • Rapidly draining the float chamber in a boiler helps prevent corrosion and sediment buildup.
  • Float chamber blowdown test should be completed every 31 days for power boilers according to ASME CSD-1.
  • Slow drain test should be completed every 366 days for boilers according to ASME CSD-1.

Feedwater Solenoid Valve and Water Level Controls

  • Feedwater solenoid valve operation can be checked by observing valve action when energized and de-energized.
  • Annually, inspect and test water level controls, including connections, as part of maintenance.

Safety Valve Testing and Maintenance

  • If safety valve fails to open at required pressure, it may be faulty and should be replaced.
  • Safety valve should open between 1.03 and 1.10 MAWP during pop test according to ASME BPVC.
  • ASME BPVC requires blowdown of safety valves to prevent accumulation of sediment.
  • Accumulation test for safety valves simulates operating conditions to ensure proper opening.
  • Maximum acceptable pressure during accumulation test is 1.1 MAWP for boilers with a MAWP of 1380 kPa and a safety valve set to 1310 kPa.

Boiler Flame Failure Detection and Testing

  • Boiler flame failure detection systems should be tested every 30 days according to ASME CSD-1.
  • When testing flame failure device, simulate flame failure to observe system reaction.
  • ASME BPVC VI describes recommended procedure for testing flame failure detection systems.

Testing Various Devices

  • To test gas burner with thermocouple or thermopile flame sensor, close burner valve.
  • Follow recommended procedures and manufacturer's instructions when testing various devices.

Flow Switch and Low Water Cut-off

  • Flow switch in copper tubular and copper fin-tube boiler ensures adequate water flow for safe operation.
  • Flow switch can be tested by simulating no-flow or low-flow conditions.
  • External low-water fuel cut-off can be tested without draining entire system by isolating and simulating low-water conditions.
  • ASME BPVC VI recommends testing low water cut-off of hot water heating boilers every 31 days.

High Temperature Cut-off

  • High temperature cut-off in a boiler prevents overheating and ensures safe operation.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Description

This quiz covers the procedure for testing a boiler safety valve, including recording the opening and closing pressures and steps to take if the valve fails to open at the required pressure.