What is the purpose of the post-purge in the shutdown sequence described in the text?

  • To ignite the flame
  • To de-energize the SSOVs
  • To cool down the system after shutdown
  • To ensure complete combustion and clear out any remaining combustible gases (correct)
  • In the shutdown sequence described, what does the programming controller do if the SSOV proof-of-closure switches do not close within 5 seconds during standby?

  • Shuts down the burner immediately
  • Ignites the flame again
  • Continues with the post-purge
  • Remains in standby until the condition is corrected (correct)
  • What initiates the shutdown sequence for the burner as per the text?

  • Flame extinguishing
  • Call for heat
  • Permissive or a burner safety switch (correct)
  • Manual on-off switch
  • During the shutdown sequence, what action causes the flame to be extinguished?

    <p>De-energizing the SSOVs</p> Signup and view all the answers

    What happens if there is a call for heat during the shutdown sequence?

    <p>Startup sequence is repeated</p> Signup and view all the answers

    What component in the shutdown sequence allows 5 seconds for proof-of-closure switches to close?

    <p>Programming controller</p> Signup and view all the answers

    If the steam pressure rises above the set point of the operating control, what occurs next in the shutdown sequence?

    <p>Call for heat ends</p> Signup and view all the answers

    What action signifies that all permissives and pre-ignition interlocks are satisfied in the startup sequence?

    <p>'Call for heat' is initiated</p> Signup and view all the answers

    'Shutdown Sequence' mentioned in the text is initiated when:

    <p>'Steam pressure' rises above set point</p> Signup and view all the answers

    In case of an error where 'proof-of-closure switches' do not close, what will happen to the 'programming controller'?

    <p>Remains in standby until switches close.</p> Signup and view all the answers

    More Like This

    Boiler Inspection and Compliance Quiz
    30 questions
    Ohio Boiler Test Flashcards
    100 questions

    Ohio Boiler Test Flashcards

    WellRegardedObsidian1129 avatar
    WellRegardedObsidian1129
    Boiler Systems and Safety Regulations
    60 questions
    Use Quizgecko on...
    Browser
    Browser