ASI Field Training Guidelines Quiz
5 Questions
164 Views

ASI Field Training Guidelines Quiz

Created by
@FlawlessPlutonium

Questions and Answers

If you complete a preliminary inspection but are unable to complete a final estimate, a preliminary estimate should be uploaded within what timeframe?

  • Same calendar day
  • By COB at the end of that week
  • Within 48 hours
  • Within 24 hours (correct)
  • What is the roof threshold for slope/total roof replacement?

  • 25%, known as the 25% rule
  • Judgement call by the adjuster
  • 75% (correct)
  • Anything over 50%
  • In what instance should an Other Structure be provided RCV coverage?

  • The other structure has four walls and a roof (correct)
  • The other structure is a total loss
  • The other structure is highly valuable
  • The dwelling limit exceeds $500,000
  • The DWELLING DP 04 76 12 02 endorsement does what?

    <p>Changes the coverage to ACV</p> Signup and view all the answers

    In order to be considered damaged, shingles must be:

    <p>Torn, missing, or showing clear signs of granular loss</p> Signup and view all the answers

    Study Notes

    Claim Inspection Timelines

    • Inspections and estimates must be uploaded in XM8 within 4 calendar days from claim receipt.
    • Preliminary estimates must be uploaded on the same calendar day if a final estimate cannot be completed.

    Roof Replacement Threshold

    • The threshold for slope/total roof replacement is set at 25%, referred to as the 25% rule.
    • Adjusters may make judgment calls, but anything above 50% typically necessitates a total replacement.

    Coverage for Other Structures

    • Generally, Other Structures are covered at Actual Cash Value (ACV).
    • Replacement Cost Value (RCV) coverage is warranted if:
      • The other structure is highly valuable.
      • The dwelling limit exceeds $500,000.
      • The structure is a total loss.

    DP 04 76 12 02 Endorsement Features

    • This endorsement changes coverage to Replacement Cost Value (RCV).
    • It provides $5,000 coverage for sump backup or overflow incidents.
    • It does not exclude coverage for Other Structures.

    Shingle Damage Criteria

    • Shingles are considered damaged if they are:
      • Torn, missing, or exhibiting clear signs of granular loss.
      • Creased, delaminated, or missing, indicating compromised integrity.
    • Missing shingles typically cannot be repaired.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge on ASI Field Training guidelines, particularly focusing on estimate submission timelines and inspection protocols. This quiz will help reinforce understanding of the procedural requirements in the field. Perfect for those preparing for ASI-related tasks.

    More Quizzes Like This

    Liens in Insurance Claims
    7 questions

    Liens in Insurance Claims

    FruitfulCognition avatar
    FruitfulCognition
    Insurance Claims Handling Process
    18 questions
    Insurance Policy and Claims
    25 questions
    Health Insurance Claims Chapter 11
    43 questions
    Use Quizgecko on...
    Browser
    Browser