ASI Field Training Quiz.docx
Document Details
Uploaded by FlawlessPlutonium
Tags
Full Transcript
**[ASI Field Training Guideline Questions:]** 1. Per the requirements, you have 4 calendar days to inspect and upload your estimate in XM8---the clock starts the day you receive the claim. If you complete a preliminary inspection, but for whatever reason are unable to complete a final...
**[ASI Field Training Guideline Questions:]** 1. Per the requirements, you have 4 calendar days to inspect and upload your estimate in XM8---the clock starts the day you receive the claim. If you complete a preliminary inspection, but for whatever reason are unable to complete a final estimate, a preliminary estimate should be uploaded within what timeframe? a. Same calendar day b. Within 24 hours c. Within 48 hours d. By COB at the end of that week. 1. Roof threshold for slope/total roof replacement is: e. 75% f. 25%, known as the 25% rule. g. Anything over 50% h. Judgement call by the adjuster 2. Other Structures are generally covered at ACV. What is an instance where an Other Structure should be provided RCV coverage? i. The other structure is highly valuable j. The dwelling limit exceed \$500,000 k. The other structure has four walls and a roof l. The other structure is a total loss 3. The **DWELLING DP 04 76 12 02** endorsement does the following: m. Changes the coverage to ACV n. Changes the coverage to RCV o. Provides \$5,000 in coverage for a sump back up/overflow p. Removes coverage for Other Structures 4. In order to be considered damaged, shingles must be: q. Torn, missing, or showing clear signs of granular loss. r. Torn, creased, or missing. s. Creased, delaminated, missing or torn. t. Missing. Any remaining shingle can be repaired.