Podcast
Questions and Answers
What is required at every step of the architectural process to adjust the design to changing needs and costs?
What is required at every step of the architectural process to adjust the design to changing needs and costs?
- Assembling the prepared materials
- Social exchanges, discussions, and negotiations (correct)
- Applying the interior finishes
- Arranging construction materials
Who is required to ensure optimal timing of materials and subassemblies at the building site to prevent costly delays for complex buildings?
Who is required to ensure optimal timing of materials and subassemblies at the building site to prevent costly delays for complex buildings?
- Architect and assistants
- Materials acquisition specialists
- Management specialists (correct)
- Construction specialists
True or false: The architectural process does not involve social exchanges, discussions, and negotiations to adjust the design to changing needs and costs.
True or false: The architectural process does not involve social exchanges, discussions, and negotiations to adjust the design to changing needs and costs.
False (B)
True or false: The multidisciplinary social process in architecture involves individuals specializing in occupations such as drawing and computer design, but does not involve materials acquisition.
True or false: The multidisciplinary social process in architecture involves individuals specializing in occupations such as drawing and computer design, but does not involve materials acquisition.
True or false: For the most complex buildings, additional management specialists are not required to ensure that materials and subassemblies arrive at the building site with optimal timing to prevent costly delays.
True or false: For the most complex buildings, additional management specialists are not required to ensure that materials and subassemblies arrive at the building site with optimal timing to prevent costly delays.
True or false: The architect and assistants do not translate the client's wishes into abstracted drawings and other construction documents.
True or false: The architect and assistants do not translate the client's wishes into abstracted drawings and other construction documents.
True or false: The patron is not involved in calling a building into being in the architectural process.
True or false: The patron is not involved in calling a building into being in the architectural process.
Nearly every community now has zoning ______ and building codes controlling where types of buildings can be located and governing density as well as engineering requirements of design and durability of building materials
Nearly every community now has zoning ______ and building codes controlling where types of buildings can be located and governing density as well as engineering requirements of design and durability of building materials
These regulations apply equally to commercial and governmental ______, as well as to private residences
These regulations apply equally to commercial and governmental ______, as well as to private residences
To ensure general public ______, nearly every community now has zoning regulations and building codes controlling where types of buildings can be located and governing density as well as engineering requirements of design and durability of building materials
To ensure general public ______, nearly every community now has zoning regulations and building codes controlling where types of buildings can be located and governing density as well as engineering requirements of design and durability of building materials