On a site having expansive soil, roof drainage water shall discharge a minimum of _____ from the foundation walls or to an approved drainage system.
On a site having expansive soil, roof drainage water shall discharge a minimum of _____ from the foundation walls or to an approved drainage system.
5 feet
Where the roof pitch is less than _____, the structural members that support rafters and ceiling joists shall be designed as beams.
Where the roof pitch is less than _____, the structural members that support rafters and ceiling joists shall be designed as beams.
3:12
The maximum spacing of collar ties shall be _____ on center.
The maximum spacing of collar ties shall be _____ on center.
4 feet
Ends of ceiling joists shall be lapped a minimum of _____ unless butted and toenailed to the supporting member.
Ends of ceiling joists shall be lapped a minimum of _____ unless butted and toenailed to the supporting member.
Signup and view all the answers
What is the maximum allowable span for SPF #2 ceiling joists, spaced 24 inches on center?
What is the maximum allowable span for SPF #2 ceiling joists, spaced 24 inches on center?
Signup and view all the answers
What is the maximum span of 2-inch by 8-inch Hem-Fir #1 rafters spaced at 24 inches on center under a 50 psf ground snow load?
What is the maximum span of 2-inch by 8-inch Hem-Fir #1 rafters spaced at 24 inches on center under a 50 psf ground snow load?
Signup and view all the answers
Purlins shall be supported by braces having a maximum unbraced length of _____ and spaced at a maximum of _____ on center.
Purlins shall be supported by braces having a maximum unbraced length of _____ and spaced at a maximum of _____ on center.
Signup and view all the answers
The ends of a ceiling joist shall have a minimum of _____ bearing on wood and a minimum of _____ on metal.
The ends of a ceiling joist shall have a minimum of _____ bearing on wood and a minimum of _____ on metal.
Signup and view all the answers
Notches in solid sawn lumber ceiling joists shall not be located in the middle _____ of the span and are limited in depth to _____ the depth of the joist.
Notches in solid sawn lumber ceiling joists shall not be located in the middle _____ of the span and are limited in depth to _____ the depth of the joist.
Signup and view all the answers
An opening in a wood framed roof system may be framed with a single header and single trimmer joists provided the header joist is located a maximum of _____ from the trimmer joist bearing.
An opening in a wood framed roof system may be framed with a single header and single trimmer joists provided the header joist is located a maximum of _____ from the trimmer joist bearing.
Signup and view all the answers
What is the maximum span without edge support for 15/32-inch wood structural panels with a span rating of 32/16?
What is the maximum span without edge support for 15/32-inch wood structural panels with a span rating of 32/16?
Signup and view all the answers
What is the maximum allowable rafter span for 800S162-54 50ksi steel rafters installed at 24 inches on center in a 110 mph wind speed area?
What is the maximum allowable rafter span for 800S162-54 50ksi steel rafters installed at 24 inches on center in a 110 mph wind speed area?
Signup and view all the answers
Openings provided for roof ventilation shall have openings a minimum of _____ and a maximum of _____.
Openings provided for roof ventilation shall have openings a minimum of _____ and a maximum of _____.
Signup and view all the answers
A required attic access opening shall have a minimum rough opening size of _____.
A required attic access opening shall have a minimum rough opening size of _____.
Signup and view all the answers
A net free cross-ventilating area of 1/300 is permitted for roof ventilation, provided a minimum _____ vapor barrier is installed on the warm-in-winter side of the ceiling.
A net free cross-ventilating area of 1/300 is permitted for roof ventilation, provided a minimum _____ vapor barrier is installed on the warm-in-winter side of the ceiling.
Signup and view all the answers
Fire-retardant-treated wood shall have a maximum listed flame spread index of _____ when used in roof construction.
Fire-retardant-treated wood shall have a maximum listed flame spread index of _____ when used in roof construction.
Signup and view all the answers
In the attachment of asphalt shingles, special methods are required where the roof slope of _____ is exceeded.
In the attachment of asphalt shingles, special methods are required where the roof slope of _____ is exceeded.
Signup and view all the answers
Double underlayment is required for an asphalt shingle application where the roof has a slope of up to _____.
Double underlayment is required for an asphalt shingle application where the roof has a slope of up to _____.
Signup and view all the answers
In an asphalt shingle roof application, step flashing on a sidewall shall be a minimum of _____ inches high and _____ inches wide.
In an asphalt shingle roof application, step flashing on a sidewall shall be a minimum of _____ inches high and _____ inches wide.
Signup and view all the answers
Nails used to attach concrete roof tiles to the roof deck shall penetrate the deck a minimum of _____ or through the thickness of the deck.
Nails used to attach concrete roof tiles to the roof deck shall penetrate the deck a minimum of _____ or through the thickness of the deck.
Signup and view all the answers
Where the cantilevered portion of a rafter is notched, a minimum of _____ inches of the member depth must remain.
Where the cantilevered portion of a rafter is notched, a minimum of _____ inches of the member depth must remain.
Signup and view all the answers
Where No. 2 wood shingles are installed on a roof having 5:12 pitch, the maximum weather exposure for 16-inch shingles shall be _____.
Where No. 2 wood shingles are installed on a roof having 5:12 pitch, the maximum weather exposure for 16-inch shingles shall be _____.
Signup and view all the answers
For preservative-treated tapersawn shakes installed on a roof, the spacing between wood shakes shall be a minimum of _____ and a maximum of _____.
For preservative-treated tapersawn shakes installed on a roof, the spacing between wood shakes shall be a minimum of _____ and a maximum of _____.
Signup and view all the answers
For a wood shake roof system, sheet metal roof valley flashing shall extend a minimum of _____ from the centerline of the valley in each direction.
For a wood shake roof system, sheet metal roof valley flashing shall extend a minimum of _____ from the centerline of the valley in each direction.
Signup and view all the answers
A notch located in the end of a solid lumber ceiling joist shall have a maximum depth of _____.
A notch located in the end of a solid lumber ceiling joist shall have a maximum depth of _____.
Signup and view all the answers
In the framing of an opening in ceiling construction, approved hangers are not required for the header joist to trimmer joist connections where the header joist span is a maximum of _____ feet.
In the framing of an opening in ceiling construction, approved hangers are not required for the header joist to trimmer joist connections where the header joist span is a maximum of _____ feet.
Signup and view all the answers
Where eave or cornice vents are installed, a minimum _____ air space shall be provided between the insulation and the roof sheathing at the vent location.
Where eave or cornice vents are installed, a minimum _____ air space shall be provided between the insulation and the roof sheathing at the vent location.
Signup and view all the answers
Where the attic height is 30 inches or greater, an access opening is not required in attics of combustible construction where the attic space is a maximum of _____ square feet in area.
Where the attic height is 30 inches or greater, an access opening is not required in attics of combustible construction where the attic space is a maximum of _____ square feet in area.
Signup and view all the answers
Overflow scuppers utilized for secondary roof drainage shall have a minimum size _____ of the roof drain.
Overflow scuppers utilized for secondary roof drainage shall have a minimum size _____ of the roof drain.
Signup and view all the answers
A ridge board shall be a minimum of _____ -inch in nominal thickness and have a minimum depth equal to _____.
A ridge board shall be a minimum of _____ -inch in nominal thickness and have a minimum depth equal to _____.
Signup and view all the answers
What is the minimum total net free ventilating area required for a 1,500-square-foot attic space?
What is the minimum total net free ventilating area required for a 1,500-square-foot attic space?
Signup and view all the answers
Where an unvented conditioned attic assembly is utilized, the use of wood shakes on the roof would require a minimum continuous _____ -inch vented air space between the shakes and the roofing felt.
Where an unvented conditioned attic assembly is utilized, the use of wood shakes on the roof would require a minimum continuous _____ -inch vented air space between the shakes and the roofing felt.
Signup and view all the answers
Where required on an asphalt-shingled roof of 5:12 slope, an ice barrier shall extend from the lowest edges of the roof surfaces to a minimum of _____ inches inside the exterior wall line.
Where required on an asphalt-shingled roof of 5:12 slope, an ice barrier shall extend from the lowest edges of the roof surfaces to a minimum of _____ inches inside the exterior wall line.
Signup and view all the answers
Drip edges provided at eaves and gables of asphalt shingle roofs shall extend a minimum of _____ inch below the roof sheathing.
Drip edges provided at eaves and gables of asphalt shingle roofs shall extend a minimum of _____ inch below the roof sheathing.
Signup and view all the answers
Study Notes
Roof Drainage and Structure
- Roof drainage water must discharge at least 5 feet away from foundation walls, especially on sites with expansive soil (R801.3).
- Structural members supporting rafters and ceiling joists must be designed as beams if the roof pitch is less than 3:12 (R802.3).
Joists and Spans
- Maximum collar tie spacing is 4 feet on center (R802.3.1).
- Ceiling joists must have ends lapped at least 3 inches or butted and toenailed to supports (R802.3.2).
- The maximum allowable span for SPF #2 ceiling joists at 24 inches on center is 14 feet, 9 inches using 2x6 members (Table R802.4(1)).
- For a roof system with a 50 psf ground snow load and a dead load of 20 psf, Hem-Fir #1 rafters (2x8, spaced at 24 inches) can span a maximum of 9 feet, 10 inches (Table R802.5.1(4)).
Construction Specifications
- Purlins should have braces with a maximum unbraced length of 8 feet and spaced no more than 4 feet apart (R802.5.1).
- Ends of ceiling joists must bear 1.5 inches on wood and metal (R802.6).
- Notches in ceiling joists should not be in the middle 1/3 of the span and are limited to 1/6 of the joist depth (R802.7.1).
Roof Openings and Ventilation
- An opening in a wood framed roof requires a single header and minimum 3 feet from the trimmer joist bearing (R802.9).
- Using 15/32-inch wood structural panels with a span rating of 32/16, the maximum span without edge support is 28 inches (R803.3.3).
Rafter and Roof Specifications
- For a dwelling in a 110 mph wind speed and Exposure B, the maximum rafter span allowed for specified steel rafters is 14 feet, 8 inches (Table R804.3.2.1(1)).
- Eaves cannot exceed a horizontal projection of 24 inches in a steel-framed roof system (R804.3.2.1.1).
Ventilation Requirements
- Openings for roof ventilation must have an opening size between 1/16 inch and 1/4 inch when covered with corrosion-resistant screening (R806.1).
- Attic access openings must have a minimum rough opening size of 22 inches by 30 inches (R807.1).
- A net free cross-ventilation area of 1/300 is acceptable in Climate Zones 6, 7, and 8 with a minimum Class 1 or 2 vapor barrier (R806.2).
Fire Safety and Installation Practices
- Fire-retardant-treated wood in roof construction must have a flame spread index of 25 or less (R802.1.5).
- Asphalt shingles require special fastening if the roof slope exceeds 21 units vertical in 12 units horizontal (R905.2.6).
- Double underlayment is mandated for asphalt shingles on roofs with a slope up to 4:12 (R905.2.3).
Flashing and Additional Guidelines
- Step flashing for asphalt shingles must be 4 inches high and wide (R905.2.8.3).
- Nails for securing concrete roof tiles need a minimum penetration of 3/4 inch (R905.3.6).
- For cantilevered rafters that are notched, a minimum depth of 3.5 inches must remain (R802.7.1.1).
Wood Shingles and Shakes
- Maximum weather exposure for 16-inch No. 2 wood shingles with a 5:12 pitch is 4 inches (Table R905.7.5(1)).
- Spacing for preservative-treated tapersawn shakes on a roof must be between 3/8 inch and 5/8 inch (R905.8.6).
Valley Flashing and Access
- Sheet metal valley flashing must extend a minimum of 11 inches from the centerline of the valley (R905.8.8).
- Approved hangers are not needed for header to trimmer joist connections if the header joist span is 6 feet or less (R802.9).
- At least 1 inch air space is required between insulation and roof sheathing at eave vents (R806.3).
Miscellaneous
- For attics greater than 30 square feet, no access opening is needed if the attic height is at least 30 inches (R807.1).
- Overflow scuppers for secondary roof drainage must be at least three times the size of the roof drain (R903.4.1).
- A ridge board must be at least 1 inch thick and equal in depth to the rafter cut (R802.3).
- Required total net free ventilating area for a 1,500-square-foot attic, with 75% from upper ventilators, is 10 square feet (R806.2).
- An unvented attic assembly requires minimum 1/4 inch vented air space when using wood shakes (R806.5).
- An ice barrier on asphalt roofs with a 5:12 slope must extend 24 inches inside the exterior wall line (R905.2.7).
- Drip edges must extend 1 inch below roof sheathing at eaves and gables (R905.2.8.5).
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
Test your knowledge of the 2015 International Residential Code (IRC) with these flashcards covering Chapters 8 and 9. Explore key definitions and requirements regarding roof drainage, structural supports, and more. Perfect for students or professionals in the construction industry.