Vector Check It Equipment Checkoff
10 Questions
1 Views

Vector Check It Equipment Checkoff

Created by
@StatelyCliché

Questions and Answers

What is the primary purpose of implementing Vector Check It?

  • To conduct checks manually
  • To streamline the maintenance process and inventory controls (correct)
  • To reduce the number of checks conducted weekly
  • To replace all equipment on apparatus
  • Which items will no longer be kept on the apparatus as part of the adjustments?

  • Medical supplies
  • Thermal imaging camera
  • Regular gasoline
  • Motor oil (correct)
  • What is emphasized in the reconfiguration of aerial apparatus?

  • Reducing hose line capabilities
  • Maintaining only engine-specific items
  • Adding more rescue and extraction equipment (correct)
  • Limiting equipment to hoses and nozzles only
  • Which items will be included in transfers to reserve units?

    <p>Ballistic vests and thermal imaging cameras</p> Signup and view all the answers

    What will be a dedicated check conducted on Wednesdays?

    <p>Weekly checks</p> Signup and view all the answers

    What placeholder term will indicate items requiring transfer in the checkoff system?

    <p>TRANSFER</p> Signup and view all the answers

    What effect does the digital checkoff seek to have on operational efficiency?

    <p>Improving operational efficiency through consistency</p> Signup and view all the answers

    Which types of equipment will be maintained on the actual apparatus following reconfiguration?

    <p>Hose lines for multifunctional capabilities</p> Signup and view all the answers

    What type of items will typically be limited during the transfer to reserve units?

    <p>Primary equipment such as SCBA and radios</p> Signup and view all the answers

    What major change was made regarding fluid storage on apparatus?

    <p>Fluids are now stored in the flammables cabinet at stations</p> Signup and view all the answers

    Study Notes

    Vector Check It Implementation

    • Effective May 1, 2023, Vector Check It will be utilized for apparatus and equipment check-off.
    • The new digital checkoff process is similar to the current check-off for medical supplies.
    • Daily and weekly checks (on Wednesdays) can be found listed under each unit in the system.

    Objectives of Digital Checkoff

    • Aims to enhance maintenance processes and inventory control.
    • Part of a comprehensive plan to improve equipment management on vehicles.
    • Focus on consistency across the fleet to boost operational efficiency.

    Changes in Equipment Management

    • Minor adjustments include the removal of various fluids, keeping only regular gasoline and mixed fuel on apparatus.
    • Motor oils and bar oil will now be stored in the flammables cabinet at the station.
    • Aerial apparatus are being reconfigured for better functionality in primary truck company and support operations.

    Equipment Adjustments

    • Emphasis is placed on increasing rescue and extraction equipment capabilities.
    • Reduction of engine-specific items (e.g., hydrant bags) from units like Tower 701 and Ladder 707.
    • Hose lines will retain multifunctional capabilities despite the reconfigurations.

    Improvements in Reserve Units

    • Reserve apparatus are now equipped with essential tools, hose lines, nozzles, and appliances for operational readiness.
    • Transferring items into reserve units is streamlined, focusing on essential equipment only.
    • Items to be transferred include medical supplies, ballistic vests, radios, MDTs, SCBAs, spare cylinders, thermal imaging cameras, and extraction tools.
    • Items requiring transfer from frontline apparatus are labeled "TRANSFER" in the system to indicate necessity.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz covers the new Vector Check It process for apparatus and equipment checkoff, effective May 1, 2023. Participants will learn how to locate their respective units, daily checkoff procedures, and the schedule for weekly checks and pump backflush. Improve your understanding of the digital checkoff system.

    Use Quizgecko on...
    Browser
    Browser