Podcast
Questions and Answers
What is the primary purpose of implementing Vector Check It?
What is the primary purpose of implementing Vector Check It?
Which items will no longer be kept on the apparatus as part of the adjustments?
Which items will no longer be kept on the apparatus as part of the adjustments?
What is emphasized in the reconfiguration of aerial apparatus?
What is emphasized in the reconfiguration of aerial apparatus?
Which items will be included in transfers to reserve units?
Which items will be included in transfers to reserve units?
Signup and view all the answers
What will be a dedicated check conducted on Wednesdays?
What will be a dedicated check conducted on Wednesdays?
Signup and view all the answers
What placeholder term will indicate items requiring transfer in the checkoff system?
What placeholder term will indicate items requiring transfer in the checkoff system?
Signup and view all the answers
What effect does the digital checkoff seek to have on operational efficiency?
What effect does the digital checkoff seek to have on operational efficiency?
Signup and view all the answers
Which types of equipment will be maintained on the actual apparatus following reconfiguration?
Which types of equipment will be maintained on the actual apparatus following reconfiguration?
Signup and view all the answers
What type of items will typically be limited during the transfer to reserve units?
What type of items will typically be limited during the transfer to reserve units?
Signup and view all the answers
What major change was made regarding fluid storage on apparatus?
What major change was made regarding fluid storage on apparatus?
Signup and view all the answers
Study Notes
Vector Check It Implementation
- Effective May 1, 2023, Vector Check It will be utilized for apparatus and equipment check-off.
- The new digital checkoff process is similar to the current check-off for medical supplies.
- Daily and weekly checks (on Wednesdays) can be found listed under each unit in the system.
Objectives of Digital Checkoff
- Aims to enhance maintenance processes and inventory control.
- Part of a comprehensive plan to improve equipment management on vehicles.
- Focus on consistency across the fleet to boost operational efficiency.
Changes in Equipment Management
- Minor adjustments include the removal of various fluids, keeping only regular gasoline and mixed fuel on apparatus.
- Motor oils and bar oil will now be stored in the flammables cabinet at the station.
- Aerial apparatus are being reconfigured for better functionality in primary truck company and support operations.
Equipment Adjustments
- Emphasis is placed on increasing rescue and extraction equipment capabilities.
- Reduction of engine-specific items (e.g., hydrant bags) from units like Tower 701 and Ladder 707.
- Hose lines will retain multifunctional capabilities despite the reconfigurations.
Improvements in Reserve Units
- Reserve apparatus are now equipped with essential tools, hose lines, nozzles, and appliances for operational readiness.
- Transferring items into reserve units is streamlined, focusing on essential equipment only.
- Items to be transferred include medical supplies, ballistic vests, radios, MDTs, SCBAs, spare cylinders, thermal imaging cameras, and extraction tools.
- Items requiring transfer from frontline apparatus are labeled "TRANSFER" in the system to indicate necessity.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
This quiz covers the new Vector Check It process for apparatus and equipment checkoff, effective May 1, 2023. Participants will learn how to locate their respective units, daily checkoff procedures, and the schedule for weekly checks and pump backflush. Improve your understanding of the digital checkoff system.